Abstract

There is a dire need to rebuild existing infrastructure with strategic and efficient methods. Design-build (DB) becomes a potential solution that provides fast-tracked delivery as a more time and cost-efficient project delivery method. Past research studied factors influencing DB but without providing a holistic analytic approach. This paper fills this knowledge gap. First, a systematic literature review is performed using the preferred reporting items for systematic reviews and meta-analyses techniques, and a set of factors affecting DB projects are then identified and clustered, using k-means clustering, based on the whole literature discussions. Second, a graph theory approach, social network analysis (SNA), is conducted methodically to detect the understudied factors. Third, the clustered factors are analyzed using association rule (AR) analysis to identify factors that have not been cross-examined together. To this end, the findings of this research highlighted the need to investigate a group of important understudied factors that affect DB decision-making and procedures that are related to management, decision-making and executive methods, and stakeholder and team related aspects, among others. Also, while the majority of the existing research focused on theoretical efforts, there is far less work associated with computational/mathematical approaches that develop actual DB frameworks. Accordingly, future research is recommended to tackle this critical need by developing models that can assess DB performance, success, and implementation, among other aspects. Furthermore, since none of the studies evaluated DB while factoring in all 34 identified relevant factors, it is recommended that future research simultaneously incorporates most, if not all, these factors to provide a well-rounded and comprehensive analysis for DB decision-making. In addition, future studies need to tackle broader sectors rather than focusing over and over on the already saturated ones. As such, this study consolidated past literature and critically used it to offer robust support for the advancement of DB knowledge within the construction industry.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

All data, models, and code generated or used during the study appear in the published article.

References

Abdul Nabi, M., and I. H. El-adaway. 2020. “Modular construction: Determining decision-making factors and future research needs.” J. Manage. Eng. 36 (6): 04020085. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000859.
Abdul Nabi, M., and I. H. El-adaway. 2022. “Understanding disputes in modular construction projects: Key common causes and their associations.” J. Constr. Eng. Manage. 148 (1): 04021184. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002208.
Abotaleb, I. S., and I. H. El-adaway. 2018. “Managing construction projects through dynamic modeling: Reviewing the existing body of knowledge and deriving future research directions.” J. Manage. Eng. 34 (6): 04018033. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000633.
Adamtey, S. A. 2021. “A case study performance analysis of design-build and integrated project delivery methods.” Int. J. Construct. Educ. Res. 17 (1): 68–84. https://doi.org/10.1080/15578771.2019.1696903.
Ahmed, M. O., R. Khalef, G. G. Ali, and I. H. El-adaway. 2021. “Evaluating deterioration of tunnels using computational machine learning algorithms.” J. Constr. Eng. Manage. 147 (10): 04021125. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002162.
Al Khalil, M. I. 2002. “Selecting the appropriate project delivery method using AHP.” Int. J. Project Manage. 20 (6): 469–474. https://doi.org/10.1016/S0263-7863(01)00032-1.
Alleman, D., A. L. Antoine, M. S. Stanford, and K. R. Molenaar. 2020. “Project delivery methods’ change-order types and magnitudes experienced in highway construction.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (2): 04520006. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000380.
Alleman, D., and D. Tran. 2020. “Challenges of implementing progressive design-build in highway construction projects.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (1): 04519036. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000327.
Alleman, D., and D. Tran. 2021. “Exploring a progressive design-build best-value delivery method in highway construction.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 13 (1): 05020018. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000443.
Al-Smadi, S. A. D. W., and A. H. Y. Alhndawi. 2021. “A comparison between the (design-build DB) and (design-bid-build DBB) approaches used in the Jordanian construction sector and clarify the risks associated with each approach.” East Afr. J. Eng. 4 (1): 1–12. https://doi.org/10.37284/eaje.4.1.442.
Ammad, S., W. S. Alaloul, S. Saad, and A. H. Qureshi. 2021. “Personal protective equipment (PPE) usage in construction projects: A scientometric approach.” J. Build. Eng. 35 (Apr): 102086. https://doi.org/10.1016/j.jobe.2020.102086.
Anderson, S., K. R. Molenaar, and C. Schexnayder. 2007. Guidance for cost estimation and management for highway projects during planning, programming, and preconstruction. Washington, DC: Transportation Research Board of the National Academies.
Antoine, A. L., D. Alleman, and K. R. Molenaar. 2019. “Examination of project duration, project intensity, and timing of cost certainty in highway project delivery methods.” J. Manage. Eng. 35 (1): 04018049. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000661.
ASCE. 2021. “ASCE’s 2021 American infrastructure report card: GPA: C-.” Accessed March 22, 2021. https://infrastructurereportcard.org/.
Ashuri, B., A. Amekudzi-Kennedy, S. Amoaning-Yankson, Y. Liang, and Y. Cao. 2019. “Strategies and resources for government agencies to utilize disadvantaged business enterprises in transportation design-build projects.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 11 (4): 04519022. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000317.
Assaad, R., and I. H. El-adaway. 2020. “Enhancing the knowledge of construction business failure: A social network analysis approach.” J. Constr. Eng. Manage. 146 (6): 04020052. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001831.
Assaad, R., and I. H. El-adaway. 2021. “Determining critical combinations of safety fatality causes using spectral clustering and computational data mining algorithms.” J. Constr. Eng. Manage. 147 (5): 04021035. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002040.
Bingham, E., G. E. Gibson, and M. El Asmar. 2018. “Measuring user perceptions of popular transportation project delivery methods using least significant difference intervals and multiple range tests.” J. Constr. Eng. Manage. 144 (6): 04018033. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001469.
Bingham, E., G. E. Gibson, and M. El Asmar. 2019. “Identifying team selection and alignment factors by delivery method for transportation projects.” J. Constr. Eng. Manage. 145 (10): 04019061. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001704.
Bolton, B., and J. Heller. 2018. “Effective airport project delivery, leadership and culture.” J. Airport Manage. 13 (1): 6–16.
Bynum, P., R. R. Issa, and S. Olbina. 2013. “Building information modeling in support of sustainable design and construction.” J. Constr. Eng. Manage. 139 (1): 24–34. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000560.
Bypaneni, S. P., and D. Q. Tran. 2018. “Empirical identification and evaluation of risk in highway project delivery methods.” J. Manage. Eng. 34 (3): 04018007. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000602.
Cheng, M. Y., and M. H. Tsai. 2008. “Cross-organization process integration in design–build team.” Autom. Constr. 17 (2): 151–162. https://doi.org/10.1016/j.autcon.2006.12.002.
Cho, N., M. El Asmar, S. Underwood, and Y. Kamarianakis. 2020. “Long-term performance benefits of the design-build delivery method applied to road pavement projects in the US.” KSCE J. Civ. Eng. 24 (4): 1049–1059. https://doi.org/10.1007/s12205-020-1814-3.
Culp, G. 2011. “Alternative project delivery methods for water and wastewater projects: Do they save time and money?” Leadersh. Manage. Eng. 11 (3): 231–240. https://doi.org/10.1061/(ASCE)LM.1943-5630.0000133.
Demetracopoulou, V., W. J. O’Brien, and N. Khwaja. 2020. “Lessons learned from selection of project delivery methods in highway projects: The Texas experience.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (1): 04519040. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000340.
Ding, X., Z. Sheng, J. Du, and Q. Li. 2014. “Computational experiment study on selection mechanism of project delivery method based on complex factors.” Math. Probl. Eng. 2014 (Jan): 1. https://doi.org/10.1155/2014/701652.
El Asmar, M., D. Ramsey, G. E. Gibson, and W. Bearup. 2020. “Design-build for transportation projects: Cost and schedule change performance analysis.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (1): 04519030. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000335.
Elsayegh, A., and I. H. El-adaway. 2021. “Holistic study and analysis of factors affecting collaborative planning in construction.” J. Constr. Eng. Manage. 147 (4): 04021023. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002031.
FAA (Federal Aviation Administration). 2005. “Advisory circular, AC No. 150/5100-14D.” Accessed May 20, 2018. https://www.faa.gov/documentLibrary/media/Advisory_Circular/150_5100_14d.pdf.
Farnsworth, C. B., R. O. Warr, J. E. Weidman, and D. Mark Hutchings. 2016. “Effects of CM/GC project delivery on managing process risk in transportation construction.” J. Constr. Eng. Manage. 142 (3): 04015091. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001091.
Feghaly, J., M. El Asmar, S. Ariaratnam, and W. Bearup. 2019. Selecting project delivery methods for water treatment plants. Bingley, UK: Emerald Publishing.
Feghaly, J., M. El Asmar, S. Ariaratnam, and W. Bearup. 2021. “Design–build project administration practices for the water industry.” J. Pipeline Syst. Eng. Pract. 12 (1): 04020068. https://doi.org/10.1061/(ASCE)PS.1949-1204.0000515.
Feghaly, J., M. El Asmar, and S. T. Ariaratnam. 2020. “State of professional practice for water infrastructure project delivery.” Pract. Period. Struct. Des. Constr. 25 (3): 04020018. https://doi.org/10.1061/(ASCE)SC.1943-5576.0000500.
Fernane, J. D. 2011. “Comparison of design-build and design-bid-build performance of public university projects.” Master’s thesis, Dept. of Construction Management, Univ. of Nevada, Las Vegas.
Fitch, G. J., I. Odeh, and C. William Ibbs. 2015. “Economic sustainability of DBO water based on wastewater projects in the US: Three case studies.” J. Constr. Eng. Manage. 141 (5): 05015001. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000967.
Franz, B. W., and R. M. Leicht. 2016. “An alternative classification of project delivery methods used in the United States building construction industry.” Construct. Manage. Econ. 34 (3): 160–173. https://doi.org/10.1080/01446193.2016.1183800.
Freeman, L. C. 1978. “Centrality in social networks conceptual clarification.” Social Networks 1 (3): 215–239. https://doi.org/10.1016/0378-8733(78)90021-7.
Gad, G. M., B. Davis, P. P. Shrestha, and M. Fathi. 2020a. “Legal and contractual issues in lump-sum design-build implementation on large-scale airport projects.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (1): 05019011. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000364.
Gad, G. M., B. Davis, P. P. Shrestha, and P. Harder. 2019. “Lessons learned from progressive design-build implementation on airport projects.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 11 (4): 04519020. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000320.
Gad, G. M., M. C. Loulakis, and D. Gransberg. 2020b. “Confidentiality issues with alternative technical concepts during design-build project procurement.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (1): 04519034. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000345.
Gan, X., R. Chang, and T. Wen. 2018. “Overcoming barriers to off-site construction through engaging stakeholders: A two-mode social network analysis.” J. Cleaner Prod. 201 (1): 735–747. https://doi.org/10.1016/j.jclepro.2018.07.299.
Gephi. 2017. “The open graph viz platform.” Accessed February 9, 2022. https://gephi.org/.
Giuffre, K. 2015. “Cultural production in networks.” In International encyclopedia of the social and behavioral sciences. Amsterdam, Netherlands: Elsevier.
Hale, D. R., P. P. Shrestha, G. E. Gibson, and G. C. Migliaccio. 2009. “Empirical comparison of design/build and design/bid/build project delivery methods.” J. Constr. Eng. Manage. 135 (7): 579–587. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000017.
Hasanzadeh, S., B. Esmaeili, G. M. Gad, and D. D. Gransberg. 2018. “Impact of owners’ early decisions on project performance and dispute occurrence in public highway projects.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 10 (2): 04518004. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000251.
Hyun, C., K. Cho, K. Koo, T. Hong, and H. Moon. 2008. “Effect of delivery methods on design performance in multifamily housing projects.” J. Constr. Eng. Manage. 134 (7): 468–482. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:7(468).
Ibbs, C. W., Y. H. Kwak, T. Ng, and A. M. Odabasi. 2003. “Project delivery systems and project change: Quantitative analysis.” J. Constr. Eng. Manage. 129 (4): 382–387. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:4(382).
Iyer, K. C., and M. Sagheer. 2010. “Hierarchical structuring of PPP risks using interpretative structural modeling.” J. Constr. Eng. Manage. 136 (2): 151–159. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000127.
Jin, R., S. Gao, A. Cheshmehzangi, and E. Aboagye-Nimo. 2018. “A holistic review of off-site construction literature published between 2008 and 2018.” J. Cleaner Prod. 202 (Nov): 1202–1219. https://doi.org/10.1016/j.jclepro.2018.08.195.
Kagdi, H., M. L. Collard, and J. I. Maletic. 2007. “An approach to mining call-usage patterns with syntactic context.” In Proc., Twenty-Second IEEE/ACM Int. Conf. on Automated Software Engineering, 457–460. New York: Association for Computing Machinery.
Kaulkar, S., L. Vinodh, and P. Thompson. 2018. “Initial analysis of multivariate factors for prediction of shark presence and attacks on the coast of North Carolina.” In Proc., Int. Symp. on Methodologies for Intelligent Systems, 426–435. Berlin: Springer.
Kessler, F. W. 2003. Systematic risk allocation and incentives/disincentives to manage costs of design-build projects. Los Angeles: Ling.
Khalef, R., and I. H. El-adaway. 2021. “Automated identification of substantial changes in construction projects of airport improvement program: Machine learning and natural language processing comparative analysis.” J. Manage. Eng. 37 (6): 04021062. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000959.
Khalef, R., and I. H. El-adaway. 2022. “Understanding and comparing the different fund levels in airport improvement projects: A graph theory approach.” In Proc., Construction Research Congress, 815–824. Reston, VA: ASCE. https://ascelibrary.org/doi/abs/10.1061/9780784483978.083.
Khalef, R., I. H. El-adaway, R. Assaad, and N. Kieta. 2021. “Contract risk management: A comparative study of risk allocation in exculpatory clauses and their legal treatment.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 13 (1): 04520036. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000430.
Khwaja, N., W. J. O’Brien, M. Martinez, B. Sankaran, J. T. O’Connor, and W. “Bill” Hale. 2018. “Innovations in project delivery method selection approach in the Texas department of transportation.” J. Manage. Eng. 34 (6): 05018010. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000645.
Kodinariya, T. M., and P. R. Makwana. 2013. “Review on determining number of cluster in K-means clustering.” Int. J. 1 (6): 90–95.
Konchar, M., and V. Sanvido. 1998. “Comparison of US project delivery systems.” J. Constr. Eng. Manage. 124 (6): 435–444. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:6(435).
Koolwijk, J. S. J., C. J. van Oel, and J. C. Gaviria Moreno. 2020. “No-blame culture and the effectiveness of project-based design teams in the construction industry: The mediating role of teamwork.” J. Manage. Eng. 36 (4): 04020033. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000796.
Krizek, K. J., G. Barnes, and K. Thompson. 2009. “Analyzing the effect of bicycle facilities on commute mode share over time.” J. Urban Plann. Dev. 135 (2): 66–73. https://doi.org/10.1061/(ASCE)0733-9488(2009)135:2(66).
Lee, C. Y., H. Y. Chong, P. C. Liao, and X. Wang. 2017. “Critical review of social network analysis applications in complex project management.” J. Manage. Eng. 34 (2): 04017061. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000579.
Lee, Z. P., R. A. Rahman, and S. I. Doh. 2020. “Key drivers for adopting design build: A comparative study between project stakeholders.” Phys. Chem. Earth A/B/C 120 (Dec): 102945. https://doi.org/10.1016/j.pce.2020.102945.
Lemaire, C., L. Rivest, C. Boton, C. Danjou, C. Braesch, and F. Nyffenegger. 2019. “Analyzing BIM topics and clusters through ten years of scientific publications.” J. Inf. Technol. Construct. 24 (Jan): 273–298.
Li, C. Z., J. Hong, F. Xue, G. Q. Shen, X. Xu, and M. K. Mok. 2016. “Schedule risks in prefabrication housing production in Hong Kong: A social network analysis.” J. Cleaner Prod. 134 (Oct): 482–494. https://doi.org/10.1016/j.jclepro.2016.02.123.
Loulakis, M. C. 2003. Design-build for the public sector. New York: Aspen.
Luo, L., Q. He, J. Xie, D. Yang, and G. Wu. 2017. “Investigating the relationship between project complexity and success in complex construction projects.” J. Manage. Eng. 33 (2): 04016036. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000471.
Ma, L., Y. Le, H. Li, R. Jin, P. Piroozfar, and M. Liu. 2018. “Regional comparisons of contemporary construction industry sustainable concepts in the Chinese context.” Sustainability 10 (11): 3831. https://doi.org/10.3390/su10113831.
Ma, L., J. Li, R. Jin, and Y. Ke. 2019. “A holistic review of public-private partnership literature published between 2008 and 2018.” Adv. Civ. Eng. 2019 (Sep): 5. https://doi.org/10.1155/2019/7094653.
McWhirt, D., J. Ahn, J. S. Shane, and K. C. Strong. 2011. Military construction projects: Comparison of project delivery methods. Bingley, UK: Emerald Publishing.
Minchin, R. E., X. Li, R. R. Issa, and G. G. Vargas. 2013. “Comparison of cost and time performance of design-build and design-bid-build delivery systems in Florida.” J. Constr. Eng. Manage. 139 (10): 04013007. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000746.
MoDOT (Missouri DOT). 2020. “RFP TR202105, airport design-build documents.” Accessed March 3, 2022. https://www.modot.org/sites/default/files/documents/TR202105_RFP_Final.pdf.
Mollaoglu, S., A. E. Sparkling, A. Garcia, and B. D. Polkinghorn. 2021. “Collaborative partnering for airport construction projects: State-of-practice.” J. Manage. Eng. 37 (3): 04021003. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000895.
Mollaoglu-Korkmaz, S., L. Swarup, and D. Riley. 2013. “Delivering sustainable, high-performance buildings: Influence of project delivery methods on integration and project outcomes.” J. Manage. Eng. 29 (1): 71–78. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000114.
Moon, H., K. Cho, T. Hong, and C. Hyun. 2011. “Selection model for delivery methods for multifamily-housing construction projects.” J. Manage. Eng. 27 (2): 106–115. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000038.
Moreno, J. 1960. The sociometry reader. Glencoe, IL: Free Press.
Nelson, P. P., and R. L. Sterling. 2012. “Sustainability and resilience of underground urban infrastructure: New approaches to metrics and formalism.” In Proc., GeoCongress 2012: State of the Art and Practice in Geotechnical Engineering. 3199–3208. Reston, VA: ASCE.
Nguyen, P. H., D. Tran, and B. C. Lines. 2020. “Fuzzy set theory approach to classify highway project characteristics for delivery selection.” J. Constr. Eng. Manage. 146 (5): 04020044. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001829.
O’Connor, J. T., G. E. G. C. GibsonMigliaccio, G. C. Migliaccio, and P. P. Shrestha. 2006. Organizational structures and communications on the SH 130 project. Austin, TX: Univ. of Texas at Austin.
Okere, G. 2018. “Comparison of DB to DBB on highway projects in Washington State, USA.” J. Constr. Supply Chain Manage. 8 (2): 73–86. https://doi.org/10.14424/ijcscm802018-73-86.
Onososen, A. O., and I. Musonda. 2022. Research focus for construction robotics and human-robot teams towards resilience in construction: Scientometric review. Bingley, UK: Emerald Publishing.
Oyetunji, A. A., and S. D. Anderson. 2006. “Relative effectiveness of project delivery and contract strategies.” J. Constr. Eng. Manage. 132 (1): 3–13. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:1(3).
Papajohn, D., and M. El Asmar. 2021. “Impact of alternative delivery on the response time of requests for information for highway projects.” J. Manage. Eng. 37 (1): 04020098. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000866.
Park, H., S. H. Han, E. M. Rojas, J. Son, and W. Jung. 2011. “Social network analysis of collaborative ventures for overseas construction projects.” J. Constr. Eng. Manage. 137 (5): 344–355. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000301.
Park, H. S., D. Lee, S. Kim, and J. L. Kim. 2015. “Comparing project performance of design-build and design-bid-build methods for large-sized public apartment housing projects in Korea.” J. Asian Archit. Build. Eng. 14 (2): 323–330. https://doi.org/10.3130/jaabe.14.323.
Park, J., and Y. H. Kwak. 2017. “Design-bid-build (DBB) vs. design-build (DB) in the US public transportation projects: The choice and consequences.” Int. J. Project Manage. 35 (3): 280–295. https://doi.org/10.1016/j.ijproman.2016.10.013.
Peña-Mora, F., and M. Li. 2001. “Dynamic planning and control methodology for design/build fast-track construction projects.” J. Constr. Eng. Manage. 127 (1): 1–17. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:1(1).
Perkins, R. 2009. “Sources of changes in design-build contracts for a governmental owner.” J. Constr. Eng. Manage. 135 (7): 588–593. https://doi.org/10.1061/(ASCE)0733-9364(2009)135:7(588).
Pishdad-Bozorgi, P., and J. M. de la Garza. 2012. “Comparative analysis of design-bid-build and design-build from the standpoint of claims.” In Proc., Construction Research Congress 2012: Construction Challenges in a Flat World, 21–30. Reston, VA: ASCE.
Pow, J., K. Gayen, L. Elliott, and R. Raeside. 2012. “Understanding complex interactions using social network analysis.” J. Clin. Nurs. 21 (19): 2772–2779. https://doi.org/10.1111/j.1365-2702.2011.04036.x.
PRISMA. 2020. “PRISMA flow diagram.” Accessed February 15, 2022. http://prisma-statement.org/prismastatement/flowdiagram.aspx.
Ramsey, D., M. El Asmar, and G. E. Gibson. 2016. “Quantitative performance assessment of single-step versus two-step design-build procurement.” J. Constr. Eng. Manage. 142 (9): 04016033. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001145.
Riley, D. R., B. E. Diller, and D. Kerr. 2005. “Effects of delivery systems on change order size and frequency in mechanical construction.” J. Constr. Eng. Manage. 131 (9): 953–962. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:9(953).
Robichaud, L. B., and V. S. Anantatmula. 2011. “Greening project management practices for sustainable construction.” J. Manage. Eng. 27 (1): 48–57. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000030.
Sagvekar, S., and A. S. Wayal. 2019. “Early contractor involvement (ECI): Indian scenario of construction project delivery.” Int. J. Sci. Technol. Res. 8 (Apr): 807–811.
Sahari Moghaddam, A., E. Rezazadeh Azar, Y. Mejias, and H. Bell. 2020. “Estimating stripping of asphalt coating using k-means clustering and machine learning–based classification.” J. Comput. Civ. Eng. 34 (1): 04019044. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000864.
Shabani Ardakani, S., and M. Nik-Bakht. 2021. “Functional evaluation of change order and invoice management processes under different procurement strategies: Social network analysis approach.” J. Constr. Eng. Manage. 147 (1): 04020155. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001974.
Shane, J. S., S. M. Bogus, and K. R. Molenaar. 2013. “Municipal water/wastewater project delivery performance comparison.” J. Manage. Eng. 29 (3): 251–258. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000139.
Shang, L., and G. C. Migliaccio. 2020. “Demystifying progressive design build: Implementation issues and lessons learned through case study analysis.” Organ. Technol. Manage. Constr. 12 (1): 2095–2108. https://doi.org/10.2478/otmcj-2020-0006.
Sharma, D. K., P. K. Mishra, and R. Lekhi. 2020. “A Bayesian network framework for comparing project delivery methods.” Int. J. Civ. Eng. 18 (5): 519–537. https://doi.org/10.1007/s40999-019-00480-9.
Shrestha, P. P., and J. D. Fernane. 2017. “Performance of design-build and design-bid-build projects for public universities.” J. Constr. Eng. Manage. 143 (3): 04016101. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001241.
Shrestha, P. P., R. Maharajan, J. R. Batista, and B. Shakya. 2016. “Comparison of utility managers’ and project managers’ satisfaction rating of alternative project delivery methods used in water and wastewater infrastructures.” Public Works Manage. Policy 21 (3): 263–279. https://doi.org/10.1177/1087724X15626716.
Shrestha, P. P., G. C. Migliaccio, J. T. O’Connor, and E. G. Gibson. 2007. Benchmarking of large design-build highway projects: One-to-one comparison and comparison with DBB projects. Washington, DC: Transportation Research Board.
Shrestha, P. P., J. T. O’Connor, and G. E. Gibson. 2012. “Performance comparison of large design-build and design-bid-build highway projects.” J. Constr. Eng. Manage. 138 (1): 1–13. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000390.
Sindhu, J., K. Choi, S. Lavy, Z. K. Rybkowski, B. F. Bigelow, and W. Li. 2018. “Effects of front-end planning under fast-tracked project delivery systems for industrial projects.” Int. J. Construct. Educ. Res. 14 (3): 163–178. https://doi.org/10.1080/15578771.2017.1280100.
Smith, N. C., and S. W. Kam. 2018. Risk sharing and transfer using alternative project delivery methods and contracting. Washington, DC: Transportation Research Board.
Sullivan, J., M. E. Asmar, J. Chalhoub, and H. Obeid. 2017. “Two decades of performance comparisons for design-build, construction manager at risk, and design-bid-build: Quantitative analysis of the state of knowledge on project cost, schedule, and quality.” J. Constr. Eng. Manage. 143 (6): 04017009. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001282.
Thomas, S. R., C. L. Macken, T. H. Chung, and I. Kim. 2002. “Measuring the impacts of the delivery system on project performance—Design-build and design-bid-build.” NIST GCR 2 (Jan): 840.
Touran, A., D. Gransberg, K. Moleenar, B. Bakshi, and K. Ghamafivar. 2009. A guidebook for selecting airport capital project delivery. Washington, DC: Transportation Research Board.
Touran, A., D. D. Gransberg, K. R. Molenaar, and K. Ghavamifar. 2011. “Selection of project delivery method in transit: Drivers and objectives.” J. Manage. Eng. 27 (1): 21–27. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000027.
Touran, A., K. Molenaar, and D. Gransberg. 2010. “A system for selecting a project delivery method in US airports.” J. Airport Manage. 4 (4): 360–373.
Tran, D. Q., A. Brihac, L. D. Nguyen, and Y. Hoon Kwak. 2018. “Project cost implications of competitive guaranteed maximum price contracts.” J. Manage. Eng. 34 (2): 05018001. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000594.
Tran, D. Q., and K. R. Molenaar. 2014a. Exploring critical delivery selection risk factors for transportation design and construction projects. Bingley, UK: Emerald Publishing.
Tran, D. Q., and K. R. Molenaar. 2014b. “Impact of risk on design-build selection for highway design and construction projects.” J. Manage. Eng. 30 (2): 153–162. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000210.
Tran, D. Q., and K. R. Molenaar. 2015. “Risk-based project delivery selection model for highway design and construction.” J. Constr. Eng. Manage. 141 (12): 04015041. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001024.
Tran, D. Q., K. R. Molenaar, and L. F. Alarcön. 2016. “A hybrid cross-impact approach to predicting cost variance of project delivery decisions for highways.” J. Infrastruct. Syst. 22 (1): 04015017. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000270.
Tran, D. Q., L. D. Nguyen, and A. Faught. 2017. Examination of communication processes in design-build project delivery in building construction. Bingley, UK: Emerald Publishing.
Van Thuyet, N., S. O. Ogunlana, and P. K. Dey. 2007. Risk management in oil and gas construction projects in Vietnam. Bingley, UK: Emerald Publishing.
Vashani, H., J. Sullivan, and M. El Asmar. 2016. “DB 2020: Analyzing and forecasting design-build market trends.” J. Constr. Eng. Manage. 142 (6): 04016008. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001113.
Verma, A., S. D. Khan, J. Maiti, and O. B. Krishna. 2014. “Identifying patterns of safety related incidents in a steel plant using association rule mining of incident investigation reports.” Saf. Sci. 70 (4): 89–98. https://doi.org/10.1016/j.ssci.2014.05.007.
Wambeke, B. W., M. Liu, and S. M. Hsiang. 2012. “Using Pajek and centrality analysis to identify a social network of construction trades.” J. Constr. Eng. Manage. 138 (10): 1192–1201. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000524.
Wang, L., M. Huang, X. Zhang, R. Jin, and T. Yang. 2020a. “Review of BIM adoption in the higher education of AEC disciplines.” J. Civ. Eng. Educ. 146 (3): 06020001. https://doi.org/10.1061/(ASCE)EI.2643-9115.0000018.
Wang, M., C. C. Wang, S. Sepasgozar, and S. Zlatanova. 2020b. “A systematic review of digital technology adoption in off-site construction: Current status and future direction towards industry 4.0.” Buildings 10 (11): 204. https://doi.org/10.3390/buildings10110204.
Warne, T. R. 2005. Design build contracting for highway projects: A performance assessment. South Jordan, UT: Tom Warne and Associates.
Wen, Y., and A. P. Chan. 2014. “Critical review of labor productivity research in construction journals.” J. Manage. Eng. 30 (2): 214–225. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000194.
Yen, L., F. Fouss, C. Decaestecker, P. Francq, and M. Saerens. 2007. “Graph nodes clustering based on the commute-time kernel.” In Proc., Pacific-Asia Conference on Knowledge Discovery and Data Mining. 1037–1045. Berlin: Springer.
Yu, Y., A. P. Chan, C. Chen, and A. Darko. 2018. “Critical risk factors of transnational public–private partnership projects: Literature review.” J. Infrastruct. Syst. 24 (1): 04017042. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000405.
Zeitler, A. 2010. Writing a safety plan (No. SAND2010-2349C). Albuquerque, NM: Sandia National Lab.
Zuber, S., M. Nawi, F. A. Nifa, and A. Y. Bahaudin. 2018. “An overview of project delivery methods in construction industry.” Int. J. Supply Chain Manage. 7 (6): 177–182.
Zuber, S. Z. S., N. M. Nawi, and F. A. A. Nifa. 2019. “Construction procurement practice: A review study of integrated project delivery (IPD) in the Malaysian construction projects.” Int. J. Supply Chain Manage. 8 (Apr): 777–783.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 149Issue 1January 2023

History

Received: Mar 29, 2022
Accepted: Aug 23, 2022
Published online: Nov 2, 2022
Published in print: Jan 1, 2023
Discussion open until: Apr 2, 2023

Permissions

Request permissions for this article.

Authors

Affiliations

Ramy Khalef, S.M.ASCE [email protected]
Ph.D. Candidate, Dept. of Civil, Architectural, and Environmental Engineering, Missouri Univ. of Science and Technology, 1401 N. Pine St., 326 Butler-Carlton Hall, Rolla, MO 65409. Email: [email protected]
Hurst-McCarthy Professor of Construction Engineering and Management, Professor of Civil Engineering, and Founding Director of Missouri Consortium of Construction Innovation, Dept. of Civil, Architectural, and Environmental Engineering, and Dept. of Engineering Management and Systems Engineering, Missouri Univ. of Science and Technology, 1401 N. Pine St., 228 Butler-Carlton Hall, Rolla, MO 65409 (corresponding author). ORCID: https://orcid.org/0000-0002-7306-6380. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

  • Investigating Causes of Disputes Resulting in Litigation in Airport Development Projects in the United States Using Graph-Based Techniques, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-5903, 40, 3, (2024).
  • A Holistic Approach to Exploring the Root Factors of Work Zone Accidents, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-5729, 40, 1, (2024).
  • Modeling and Understanding Dispute Causation in the US Public–Private Partnership Projects, Journal of Infrastructure Systems, 10.1061/JITSE4.ISENG-2328, 30, 1, (2024).
  • Performance of Project Delivery Methods for US Airport Projects: A Holistic Quantitative Risk-Based Assessment through Perceptions of Associated Industry Experts, Journal of Construction Engineering and Management, 10.1061/JCEMD4.COENG-14924, 150, 10, (2024).
  • Accelerating the Circular Economy Transition: A Construction Value Chain-Structured Portfolio of Strategies and Implementation Insights, Journal of Construction Engineering and Management, 10.1061/JCEMD4.COENG-14550, 150, 8, (2024).
  • Analyzing the Impact of DB versus DBB on Cost Performance in Airport Development: A Data-Driven Approach, Construction Research Congress 2024, 10.1061/9780784485286.002, (10-19), (2024).
  • Understanding of Risky Determinants Affecting the Success of Design-Build Airport Projects Using Computational Clustering Techniques, Computing in Civil Engineering 2023, 10.1061/9780784485224.065, (539-546), (2024).
  • Advancing Airport Project Delivery: A Comparison of Design–Build and Traditional Methods in Terms of Schedule and Cost Performance, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-5490, 39, 6, (2023).
  • Data-Driven Analysis of Construction Bidding Stage–Related Causes of Disputes, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-5426, 39, 5, (2023).

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share