Technical Papers
Aug 25, 2023

Advancing Airport Project Delivery: A Comparison of Design–Build and Traditional Methods in Terms of Schedule and Cost Performance

Publication: Journal of Management in Engineering
Volume 39, Issue 6

Abstract

Current airport infrastructure is in a state of decline, with reports scoring it at an underperforming classification of D+. To address this issue, significant improvement and advancement of the infrastructure is needed. With backing on an authoritative level, the nation can expect an increase in the number of improvement projects. Airport stakeholders have long been accustomed to delivering their projects using traditional methods, such as design–bid–build (DBB). Design–build (DB) is an alternative delivery method that has added benefits for project metrics, such as schedule and cost performance. There is a lack of research evaluating DB within the context of airport projects. This study fills this knowledge gap. The goal of this research is to provide an improved understanding of DB with respect to DBB on fundamental key risks that impact schedule and cost performance in airport projects. This goal is achieved by a multistep interdependent methodology comprised of: (1) collecting and assessing data on 34 risk factors, (2) calculating the risk ratings of each factor, and (3) statistically analyzing the risks for their actual effect, as well as how they are perceived by between different stakeholder groups. The results show that the traditional DBB delivery method results in greater risks for most risk factors than does DB. Furthermore, contractors perceived DBB more negatively than DB. The top significant risk in DBB is the low level of team collaboration. Conversely, while statistically insignificant, unclarity or incompleteness in project scope was the most critical risk factor in affecting DB. To this end, DB implementation has promise for handling many risks better than DBB, and greater integration of DB should be prioritized in future airport projects to reap those added benefits. Ultimately, this research contributes to the body of knowledge by providing insight for airport stakeholders on the crucial risk factors that must be considered in project delivery.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

All data, models, and code generated or used during the study appear in the published article.

References

Abdul Nabi, M., and I. H. El-adaway. 2021. “Understanding the key risks affecting cost and schedule performance of modular construction projects.” J. Manage. Eng. 37 (4): 04021023. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000917.
Abou Chakra, H., and A. Ashi. 2019. “Comparative analysis of design/build and design/bid/build project delivery systems in Lebanon.” J. Ind. Eng. Int. 15 (1): 147–152. https://doi.org/10.1007/s40092-019-00323-1.
ACINA (Airports Council International-North America). 2019. “Terminally challenged: Addressing the infrastructure funding shortfall of America’s Airports.” Accessed March 22, 2021. https://www.infrastructureusa.org/terminally-challenged-addressing-the-infrastructure-funding-shortfall-of-americas-airports/.
ADA (Americans with Disabilities Act). 2023. “The Americans with Disabilities Act (ADA) protects people with disabilities from discrimination.” Accessed April 7, 2023. https://www.ada.gov/.
Ahmed, M. O., R. Khalef, G. G. Ali, and I. H. El-adaway. 2021. “Evaluating deterioration of tunnels using computational machine learning algorithms.” J. Constr. Eng. Manage. 147 (10): 04021125. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002162.
Airport Improvement. 2019. “San Francisco Int’l uses progressive design-build method for recent garage project.” Accessed January 7, 2023. https://airportimprovement.com/article/san-francisco-int-l-uses-progressive-design-build-method-recent-garage-project.
Alleman, D., and D. Tran. 2020. “Challenges of implementing progressive design-build in highway construction projects.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (1): 04519036. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000327.
Almashaqbeh, M., and K. El-Rayes. 2021. “Optimizing the modularization of floor plans in modular construction projects.” J. Build. Eng. 39 (Jul): 102316. https://doi.org/10.1016/j.jobe.2021.102316.
Al-Smadi, S. A. D. W., and A. H. Y. Alhndawi. 2021. “A comparison between the (design-build DB) and (design-bid-build DBB) approaches used in the Jordanian construction sector and clarify the risks associated with each approach.” East Afr. J. Eng. 4 (1): 1–12. https://doi.org/10.37284/eaje.4.1.442.
Alwin, D. F., and J. A. Krosnick. 1991. “The reliability of survey attitude measurement: The influence of question and respondent attributes.” Sociological Methods Res. 20 (1): 139–181. https://doi.org/10.1177/0049124191020001005.
Arcadis. 2022. “2022 global construction disputes report.” Accessed January 8, 2023. https://www.arcadis.com/en-us/knowledge-hub/perspectives/global/global-construction-disputes-report.
Arditi, D., and D. E. Lee. 2003. “Assessing the corporate service quality performance of design-build contractors using quality function deployment.” Construct. Manage. Econ. 21 (2): 175–185. https://doi.org/10.1080/0144619032000079716.
ASCE. 2021. “ASCE’s 2021 American infrastructure report card: GPA: C−.” Accessed March 22, 2021. https://infrastructurereportcard.org/.
Assaad, R., I. H. El-adaway, and I. S. Abotaleb. 2020. “Predicting project performance in the construction industry.” J. Constr. Eng. Manage. 146 (5): 04020030. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001797.
Baiden, B. K., A. D. Price, and A. R. Dainty. 2006. “The extent of team integration within construction projects.” Int. J. Project Manage. 24 (1): 13–23. https://doi.org/10.1016/j.ijproman.2005.05.001.
Beard, J. L., M. C. Loulakis, and E. C. Wundram. 2001. Design-build: Planning through development. New York: McGraw-Hill.
Bhardwaj, P. 2019. “Types of sampling in research.” J. Pract. Cardiovasc. Sci. 5 (3): 157–163. https://doi.org/10.4103/jpcs.jpcs_62_19.
Biernacki, P., and D. Waldorf. 1981. “Snowball sampling: Problems and techniques of chain referral sampling.” Sociological Methods Res. 10 (2): 141–163. https://doi.org/10.1177/004912418101000205.
BOEM (Bureau of Ocean Energy Management) 2023. “Air Quality Act (1967) or the Clean Air Act (CAA).” Accessed September 13, 2022. https://www.boem.gov/air-quality-act-1967-or-clean-air-act-caa#:~:text=The%20Clean%20Air%20Act%20(CAA)%20(42%20U.S.C.,public%20health%20and%20the%20environment.
Bo, X., and A. P. Chan. 2012. “Investigation of barriers to entry into the design-build market in the People’s Republic of China.” J. Constr. Eng. Manage. 138 (1): 120–127. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000387.
Bowler, T. 2016. “Heathrow expansion: How the cost of delays stacks up.” BBC News. Accessed January 7, 2023. https://www.bbc.com/news/business-37575698.
BTS (Bureau of Transportation Statistics). 2019a. “November 2020 regularly scheduled flights with more than 50% delayed arrivals of more than 30 minutes.” Accessed March 22, 2021. https://www.bts.gov/november-2020-regularly-scheduled-flights-more-50-delayed-arrivals-more-30-minutes.
BTS (Bureau of Transportation Statistics). 2019b. “Passengers: All carriers—All airports.” Accessed March 22, 2021. https://www.transtats.bts.gov/Data_Elements.aspx?Data=1.
Bypaneni, S. P., and D. Q. Tran. 2018. “Empirical identification and evaluation of risk in highway project delivery methods.” J. Manage. Eng. 34 (3): 04018007. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000602.
Castro-Nova, I., G. M. Gad, A. Touran, B. Cetin, and D. D. Gransberg. 2018. “Evaluating the influence of differing geotechnical risk perceptions on design-build highway projects.” ASCE-ASME J. Risk Uncertainty Eng. Syst. Part A: Civ. Eng. 4 (4): 04018038. https://doi.org/10.1061/AJRUA6.0000993.
Chen, A. M., K. S. Yehle, N. M. Albert, K. F. Ferraro, H. L. Mason, M. M. Murawski, and K. S. Plake. 2014. “Relationships between health literacy and heart failure knowledge, self-efficacy, and self-care adherence.” Res. Social Administrative Pharm. 10 (2): 378–386. https://doi.org/10.1016/j.sapharm.2013.07.001.
Chesworth, D. 2011. Design-build—The panacea to construction at airports? Hamilton, ON, Canada: IAAE Canada.
Christmann, A., and S. Van Aelst. 2006. “Robust estimation of Cronbach’s alpha.” J. Multivar. Anal. 97 (7): 1660–1674. https://doi.org/10.1016/j.jmva.2005.05.012.
Chyung, S. Y., K. Roberts, I. Swanson, and A. Hankinson. 2017. “Evidence-based survey design: The use of a midpoint on the Likert scale.” Perform. Improv. 56 (10): 15–23. https://doi.org/10.1002/pfi.21727.
Cochran, W. G. 1977. Sampling techniques. 3rd ed. New York: Wiley.
Cohen, J. P., and C. C. Coughlin. 2003. “Congestion at airports: The economics of airport expansions.” Rev. –Fed. Reserve Bank Saint Louis 85 (3): 9–26.
Congressional Research Service. 2021. “Federal Airport Noise Regulations and Programs.” Accessed September 27, 2021. https://sgp.fas.org/crs/misc/R45129.pdf.
Creswell, J. W., A. C. Klassen, V. L. Plano Clark, and K. C. Smith. 2011. Best practices for mixed methods research in the health sciences, 541–545. Bethesda, MD: National Institutes of Health.
Davies, A., M. Dodgson, and D. Gann. 2009a. From iconic design to lost luggage: Innovation at Heathrow Terminal. Frederiksberg, Denmark: Copenhagen Business School.
Davies, A., D. Gann, and T. Douglas. 2009b. “Innovation in megaprojects: Systems integration at London Heathrow Terminal 5.” Calif. Manage. Rev. 51 (2): 101–125. https://doi.org/10.2307/41166482.
Davis, K. A. 2004. Information technology change in the architecture, engineering, and construction industry: An investigation of individuals’ resistance. Blacksburg, VA: Virginia Polytechnic Institute and State Univ.
Demsas, J. 2021. “Hosting the Olympics comes at a massive cost.” Vox. Accessed January 8, 2023. https://www.vox.com/22599732/olympics-tokyo-2020-summer.
DOL (US Department of Labor). 2023. “Wages and the Fair Labor Standards Act.” Accessed June 28, 2023. https://www.dol.gov/agencies/whd/flsa.
Doritis, V. C. 2019. “The case for peer review of international airport concepts and designs.” Accessed January 8, 2023. https://www.linkedin.com/pulse/case-peer-review-international-airport-concepts-doritis-mba-pe-pmp/.
Edwards, B. 2004. The modern airport terminal: New approaches to airport architecture. London: Taylor & Francis.
El-adaway, I. H., M. Abdul Nabi, R. Khalef, T. Elbashbishy, G. G. Ali, R. Eissa, and M. O. Ahmed. 2022. “Graduate recruitment offers: Ethical and professional considerations for engineering graduate students and faculty members.” Ethics Behav. 34 (2023): 1–19.
Elsayegh, A., and I. H. El-adaway. 2022. “Quantitative holistic assessment of implementing collaborative planning practices.” J. Manage. Eng. 38 (3): 04022011. https://doi.org/10.1061/(ASCE)ME.1943-5479.0001032.
El Wardani, M. A., J. I. Messner, and M. J. Horman. 2006. “Comparing procurement methods for design-build projects.” J. Constr. Eng. Manage. 132 (3): 230–238. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:3(230).
Emerson, R. W. 2017. “Likert scales.” J. Visual Impairment Blindness 111 (5): 488. https://doi.org/10.1177/0145482X1711100511.
EPA 2023a. “Clean Water Act.” Accessed June 22, 2023. https://www.epa.gov/laws-regulations/summary-clean-water-act.
EPA 2023b. “National Environmental Policy Act.” Accessed June 16, 2023. https://www.epa.gov/nepa.
Eriksson, P. E., L. Volker, A. Kadefors, S. Lingegård, J. Larsson, and L. Rosander. 2019. “Collaborative procurement strategies for infrastructure projects: A multiple-case study.” In Vol 172 of Proc., of the Institution of Civil Engineers-Management, Procurement and Law, 197–205. London: Thomas Telford.
Eyiah, A. K. 2001. “An integrated approach to financing small contractors in developing countries: A conceptual model.” Construct. Manage. Econ. 19 (5): 511–518. https://doi.org/10.1080/01446193.2001.9709627.
FAA (Federal Aviation Administration). 2005. “Advisory circular no. 150/5100-14D.” Accessed May 20, 2018. https://www.faa.gov/documentLibrary/media/Advisory_Circular/150_5100_14d.pdf.
Fathi, M., and P. P. Shrestha. 2022. “Public–private partnership project performance analysis compared to design-build in highway projects.” J. Constr. Eng. Manage. 148 (11): 04022118. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002391.
Feghaly, J., M. El Asmar, and S. T. Ariaratnam. 2020. “State of professional practice for water infrastructure project delivery.” Pract. Period. Struct. Des. Constr. 25 (3): 04020018. https://doi.org/10.1061/(ASCE)SC.1943-5576.0000500.
Forcada, N., M. Gangolells, M. Casals, and M. Macarulla. 2017. “Factors affecting rework costs in construction.” J. Constr. Eng. Manage. 143 (8): 04017032. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001324.
Gad, G. M., B. Davis, P. P. Shrestha, and P. Harder. 2019. “Lessons learned from progressive design-build implementation on airport projects.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 11 (4): 04519020. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000320.
Galpin, J., and G. Held. 2002. “Analysis of rain quality data from the South African interior.” Environmetrics 13 (4): 333–346. https://doi.org/10.1002/env.521.
Ganiyu, A. Y., A. R. Taibat, and O. A. Damola. 2015. “Factors contributing to non-adoption of value engineering methodology for building services.” Jurnal Teknologi 77 (14).
Gransberg, D. D. 2013. “Early contractor design involvement to expedite delivery of emergency highway projects: Case studies from six states.” Transp. Res. Rec. 2347 (1): 19–26. https://doi.org/10.3141/2347-03.
Gransberg, D. D., J. E. Koch, and K. R. Molenaar. 2006. Preparing for design-build projects. Reston, VA: ASCE.
Gransberg, D. D., and K. R. Molenaar. 2019. “Critical comparison of progressive design-build and construction manager/general contractor project delivery methods.” Transp. Res. Rec. 2673 (1): 261–268. https://doi.org/10.1177/0361198118822315.
Gransberg, D. D., and J. S. Shane. 2010. Vol. 402 of Construction manager-at-risk project delivery for highway programs. Washington, DC: Transportation Research Board.
Grimshaw, D., J. Cartwright, A. Keizer, and J. Rubery. 2019. “Market exposure and the labour process: The contradictory dynamics in managing subcontracted services work.” Work Employment Soc. 33 (1): 76–95. https://doi.org/10.1177/0950017018759206.
Haider, H., R. Sadiq, and S. Tesfamariam. 2016. “Risk-based framework for improving customer satisfaction through system reliability in small-sized to medium-sized water utilities.” J. Manage. Eng. 32 (5): 04016008. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000435.
Hale, D. R., P. P. Shrestha, G. E. Gibson Jr., and G. C. Migliaccio. 2009. “Empirical comparison of design/build and design/bid/build project delivery methods.” J. Constr. Eng. Manage. 135 (7): 579–587. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000017.
Hasanzadeh, S., B. Dao, B. Esmaeili, and M. D. Dodd. 2019. “Role of personality in construction safety: Investigating the relationships between personality, attentional failure, and hazard identification under fall-hazard conditions.” J. Constr. Eng. Manage. 145 (9): 04019052. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001673.
Hasanzadeh, S., B. Esmaeili, G. M. Gad, D. D. Gransberg, and S. Nasrollahi. 2018. “Time of involvement and dispute occurrence in public highway projects.” In Proc., Construction Research Congress 2018, 161–170. Reston, VA: ASCE.
Hashem, S. 2014. The power of design-build: A guide to effective design-build project delivery using the SAFEDB-methodology. New York: Business Expert Press.
Heralova, R. S. 2016. “Possibility of using value engineering in highway projects.” Procedia Eng. 164 (Aug): 362–367. https://doi.org/10.1016/j.proeng.2016.11.631.
Hyun Lee, J., Y. Zhou, and B. Ashuri. 2020. “Key challenges to design professional liability in the design-build environment.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (3): 04520031. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000413.
Islam, M. R. 2018. “Sample size and its role in central limit theorem (CLT).” Comput. Appl. Math. J. 4 (1): 1–7.
Islam, R., T. H. Nazifa, and S. F. Mohamed. 2019. “Factors influencing facilities management cost performance in building projects.” J. Perform. Constr. Facil. 33 (3): 04019036. https://doi.org/10.1061/(ASCE)CF.1943-5509.0001284.
Jackson, D. L. 2007. “The effect of the number of observations per parameter in misspecified confirmatory factor analytic models.” Struct. Equation Modell. Multidiscip. J. 14 (1): 48–76. https://doi.org/10.1080/10705510709336736.
Järvenpää, A. T., J. Larsson, and P. E. Eriksson. 2019. “The transition from design-bid-build contracts to design-build. In Proc., 10th Nordic Conf. on Construction Economics and Organization. Bradford, UK: Emerald Publishing.
Kalsaas, B. T., G. Hannås, G. Frislie, and J. Skaar. 2018. “Transformation from design-bid-build to design-build contracts in road construction.” In Vol. 18 of Proc., 26th Annual Conf. of the Int. Group for Lean Construction (2018). Red Hook, NY: Curran Associates.
Kamali, M., and K. Hewage. 2017. “Development of performance criteria for sustainability evaluation of modular versus conventional construction methods.” J. Cleaner Prod. 142 (Jan): 3592–3606. https://doi.org/10.1016/j.jclepro.2016.10.108.
Kermanshachi, S., and A. Pamidimukkala. 2023. “Uncertainty analysis of key schedule performance indicators in design, procurement, and construction phases of heavy industrial projects.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 15 (1): 04522042. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000588.
Khalafallah, A., and K. El-Rayes. 2008. “Minimizing construction-related security risks during airport expansion projects.” J. Constr. Eng. Manage. 134 (1): 40–48. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:1(40).
Khalafallah, A., N. Kartam, and R. A. Razeq. 2019. “Bilevel standards-compliant platform for evaluating building contractor safety.” J. Constr. Eng. Manage. 145 (10): 04019054. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001686.
Khalef, R., G. G. Ali, I. H. El-adaway, and G. M. Gad. 2022. “Managing construction projects impacted by the COVID-19 pandemic: A contractual perspective.” Construct. Manage. Econ. 40 (4): 313–330. https://doi.org/10.1080/01446193.2022.2031238.
Khalef, R., and I. H. El-adaway. 2021. “Automated identification of substantial changes in construction projects of airport improvement program: Machine learning and natural language processing comparative analysis.” J. Manage. Eng. 37 (6): 04021062. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000959.
Khalef, R., and I. H. El-adaway. 2022. “Understanding and comparing the different fund levels in airport improvement projects: A graph theory approach.” In Proc., Construction Research Congress 2022, 815–824. Reston, VA: ASCE.
Khalef, R., and I. H. El-adaway. 2023. “Identifying design-build decision-making factors and providing future research guidelines: Social network and association rule analysis.” J. Constr. Eng. Manage. 149 (1): 04022151. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002431.
Lee, Z. P., R. A. Rahman, and S. I. Doh. 2020. “Key drivers for adopting design build: A comparative study between project stakeholders.” Phys. Chem. Earth Parts A/B/C 120 (Dec): 102945. https://doi.org/10.1016/j.pce.2020.102945.
Loulakis, M. C. 2003. Design-build for the public sector. New York: Aspen.
Loulakis, M. C., N. C. Smith, D. L. Brady, R. E. Rayl, and D. Gransberg. 2015. Liability of design-builders for design, construction, and acquisition claims. Washington, DC: National Academies of Sciences, Engineering, and Medicine.
Luther, L. 2007. Environmental impacts of airport operations, maintenance, and expansion. Washington, DC: Congressional Research Service.
Marle, F., and L. A. Vidal. 2016. Managing complex, high-risk projects. London: Springer.
Melaku Belay, S., S. Tilahun, M. Yehualaw, J. Matos, H. Sousa, and E. T. Workneh. 2021. “Analysis of cost overrun and schedule delays of infrastructure projects in low income economies: Case studies in Ethiopia.” Adv. Civ. Eng. 2021 (Nov): 1–15. https://doi.org/10.1155/2021/4991204.
Minchin, R. E., Jr., X. Li, R. R. Issa, and G. G. Vargas. 2013. “Comparison of cost and time performance of design-build and design-bid-build delivery systems in Florida.” J. Constr. Eng. Manage. 139 (10): 04013007. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000746.
Mngqosini, S. 2022. “Qatar World Cup chief says between 400 and 500 migrant workers have died in projects connected to the tournament.” CNN. Accessed January 8, 2023. https://www.cnn.com/2022/11/29/football/qatar-world-cup-migrant-worker-deaths-spt-intl/index.html.
MoDOT (Missouri DOT). 2020. “RFP TR202105, airport design-build documents.” Accessed March 3, 2022. https://www.modot.org/sites/default/files/documents/TR202105_RFP_Final.pdf.
Moon, H., K. Kim, H. S. Lee, M. Park, T. P. Williams, B. Son, and J. Y. Chun. 2020. “Cost performance comparison of design-build and design-bid-build for building and civil projects using mediation analysis.” J. Constr. Eng. Manage. 146 (9): 04020113. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001873.
Moshagen, M., and J. Musch. 2014. “Sample size requirements of the robust weighted least squares estimator.” Methodology 10 (2): 60–70. https://doi.org/10.1027/1614-2241/a000068.
Müller, M., D. Gogishvili, and S. D. Wolfe. 2022. “The structural deficit of the Olympics and the World Cup: Comparing costs against revenues over time.” Environ. Plann. A: Econ. Space 54 (6): 1200–1218. https://doi.org/10.1177/0308518X221098741.
Nguyen, P. H., D. Q. Tran, and S. P. Bypaneni. 2021. “Exploring the impact of project size on design-bid-build and design-build project delivery performance in highways.” Construct. Manage. Econ. 39 (11): 879–893. https://doi.org/10.1080/01446193.2021.1993289.
Nikou Goftar, V., M. El Asmar, and E. Bingham. 2014. “A meta-analysis of literature comparing project performance between design-build (DB) and design-bid-build (DBB) delivery systems.” In Proc., Construction Research Congress 2014: Construction in a Global Network, 1389–1398. Reston, VA: ASCE.
NLRB (National Labor Relations Board). 2023. “Introduction to the NLRB.” Accessed June 27, 2023. https://www.nlrb.gov/.
NPIAS (National Plan of Integrated Airport Systems). 2019. “Report to Congress: National Plan of Integrated Airport Systems (NPIAS) 2015–2019.” Accessed March 22, 2021. https://web.archive.org/web/20210321144003/https://www.faa.gov/airports/planning_capacity/npias/current/historical/media/2015/npias-2015-2019-report-narrative.pdf.
Opfer, N. D., J. Son, and T. Korman. 2002. “Public sector design-build selection criteria.” In Proc., AACE Int. Transactions. Morgantown, WV: Association for the Advancement of Cost Engineering.
OSHA (Occupational Safety and Health Administration). 2023. “Occupational Safety and Health Administration. United States Department of Labor.” Accessed June 28, 2023. https://www.osha.gov/.
Oyelami, C., and A. Shittu. 2019. Assessment of risk management techniques for construction projects under design bid build and design & build procurement methods in Abuja Nigeria. Bauchi, Nigeria: Abubakar Tafawa Balewa Univ.
Panagoulia, E., and T. Rakha. 2023. “Data reliability in BIM and performance analytics: A survey of contemporary AECO practice.” J. Archit. Eng. 29 (2): 04023006. https://doi.org/10.1061/JAEIED.AEENG-1483.
Papajohn, D., M. El Asmar, K. R. Molenaar, and D. Alleman. 2020. “Comparing contract administration functions for alternative and traditional delivery of highway projects.” J. Manage. Eng. 36 (1): 04019038. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000727.
Park, H. S., D. Lee, S. Kim, and J. L. Kim. 2015. “Comparing project performance of design-build and design-bid-build methods for large-sized public apartment housing projects in Korea.” J. Asian Archit. Build. Eng. 14 (2): 323–330. https://doi.org/10.3130/jaabe.14.323.
Pereira, E., S. Ahn, S. Han, and S. Abourizk. 2018. “Identification and association of high-priority safety management system factors and accident precursors for proactive safety assessment and control.” J. Manage. Eng. 34 (1): 04017041. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000562.
Pishdad-Bozorgi, P., and J. M. de la Garza. 2012.“Comparative analysis of design-bid-build and design-build from the standpoint of claims.” In Proc., Construction Research Congress 2012: Construction Challenges in a Flat World, 21–30. Reston, VA: ASCE.
Rad, K. M., and O. A. Yamini. 2016. “The methodology of using value engineering in construction projects management.” Civil Eng. J. 2 (6): 262. https://doi.org/10.28991/cej-030986.
Ramsey, D., M. El Asmar, and G. E. Gibson Jr. 2016. “Quantitative performance assessment of single-step versus two-step design-build procurement.” J. Constr. Eng. Manage. 142 (9): 04016033. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001145.
Rivers, D. J. 2021. “The role of personality traits and online academic self-efficacy in acceptance, actual use and achievement in Moodle.” Educ. Inf. Technol. 26 (4): 4353–4378. https://doi.org/10.1007/s10639-021-10478-3.
Russell, M. M., G. Howell, S. M. Hsiang, and M. Liu. 2013. “Application of time buffers to construction project task durations.” J. Constr. Eng. Manage. 139 (10): 04013008. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000735.
Salcedo Rahola, T. B., and A. Straub. 2014. “The role of the architect in integrated contracts for social housing renovations in the Netherlands.” In Proc., CIB Int. Conf. on Construction in a Changing World, Sri Lanka (India). Salford, UK: Univ. of Salford.
Salla, D. E. 2020. “Comparing performance quality of design-bid-build (DBB) and design-build (DB) project delivery methods in Nigeria.” Afr. J. Earth Environ. Sci. 2 (2).
Sankaran, B., G. Nevett, W. J. O’Brien, P. M. Goodrum, and J. Johnson. 2018. “Civil integrated management: Empirical study of digital practices in highway project delivery and asset management.” Autom. Constr. 87 (Mar): 84–95. https://doi.org/10.1016/j.autcon.2017.12.006.
Santos, J. R. A. 1999. “Cronbach’s alpha: A tool for assessing the reliability of scales.” J. Ext. 37 (2): 1–5.
Schöttle, A., and F. Gehbauer. 2012. “Incentive systems to support collaboration in construction projects.” In Proc., Int. Group for Lean Construction. San Diego: Montezuma Publishing.
Sekar, S. 2022. “Chennai Airport’s new integrated terminal delayed, again.” The Hindu. Accessed January 7, 2023. https://www.thehindu.com/news/cities/chennai/chennai-airports-new-integrated-terminal-delayed-again/article65805726.ece.
Seng, N. W., and A. M. Yusof. 2006. “The success factors of design and build procurement method: A literature visit.” In Proc., 6th Asia-Pacific Structural Engineering and Construction Conf., 1–11. San Fransisco: Academia.
Sgouridis, S., P. A. Bonnefoy, and R. J. Hansman. 2011. “Air transportation in a carbon constrained world: Long-term dynamics of policies and strategies for mitigating the carbon footprint of commercial aviation.” Transp. Res. Part A: Policy Pract. 45 (10): 1077–1091. https://doi.org/10.1016/j.tra.2010.03.019.
Shrestha, A., T. K. Chan, A. A. Aibinu, C. Chen, and I. Martek. 2018. “Risk allocation inefficiencies in Chinese PPP water projects.” J. Constr. Eng. Manage. 144 (4): 04018013. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001457.
Shrestha, P. P., and J. Batista. 2020. “Lessons learned in design-build and construction-manager-at-risk water and wastewater project.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (2): 04520002. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000376.
Shrestha, P. P., and J. D. Fernane. 2017. “Performance of design-build and design-bid-build projects for public universities.” J. Constr. Eng. Manage. 143 (3): 04016101. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001241.
Shrestha, P. P., and K. P. Neupane. 2020. “Identification of geotechnical-related problems impacting cost, schedule, and claims on bridge construction projects.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (2): 04520005. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000375.
Shrestha, P. P., J. T. O’Connor, and G. E. Gibson Jr. 2012. “Performance comparison of large design-build and design-bid-build highway projects.” J. Constr. Eng. Manage. 138 (1): 1–13. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000390.
Srour, F. J., I. Srour, and M. G. Lattouf. 2017. “A survey of absenteeism on construction sites.” Int. J. Manpower 38 (4): 533–547. https://doi.org/10.1108/IJM-08-2015-0135.
Stamatiadis, N., P. Goodrum, E. Shocklee, and C. Wang. 2014. “Quantitative analysis of state transportation agency’s experience with constructability reviews.” J. Constr. Eng. Manage. 140 (2): 04013041. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000787.
Subramanya, K., S. Kermanshachi, A. Pamidimukkala, and K. Loganathan. 2022. “Evaluation of operational challenges in highway construction material delivery.” In Proc., Tran-SET 2022, 248–258. Reston, VA: ASCE.
Tangel, A. 2015. “Another delayed arrival: Renovation at La Guardia.” Wall Street Journal. Accessed January 7, 2023. https://www.wsj.com/articles/another-delayed-arrival-renovation-at-la-guardia-1424311540?mod=rss_newyork_real_estate.
Touran, A., D. Gransberg, K. Molenaar, B. Bakshi, and K. Ghavamifar. 2009. A guidebook for selecting airport capital project delivery. Washington, DC: Transportation Research Board.
Tran, D. Q., G. Diraviam, and R. E. Minchin Jr. 2018. “Performance of highway design-bid-build and design-build projects by work types.” J. Constr. Eng. Manage. 144 (2): 04017112. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001437.
Tran, D. Q., and K. R. Molenaar. 2014. “Exploring critical delivery selection risk factors for transportation design and construction projects.” Eng. Constr. Archit. Manage. 21 (6): 631–647. https://doi.org/10.1108/ECAM-11-2013-0103.
Tymvios, N., J. Gambatese, and D. Sillars. 2012. “Designer, contractor, and owner views on the topic of design for construction worker safety.” In Proc., Construction Research Congress 2012: Construction Challenges in a Flat World, 341–355. Reston, VA: ASCE.
USDOD (US Department of Defense) 1996. “The Clinger Cohen Act of 1996.” Accessed November 5, 2022. https://dodcio.defense.gov/Portals/0/Documents/ciodesrefvolone.pdf.
Vashani, H., J. Sullivan, and M. El Asmar. 2016. “DB 2020: Analyzing and forecasting design-build market trends.” J. Constr. Eng. Manage. 142 (6): 04016008. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001113.
Vaux, J. S., and W. M. Kirk. 2018. “Relationship conflict in construction management: Performance and productivity problem.” J. Constr. Eng. Manage. 144 (6): 04018032. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001478.
Weijters, B., E. Cabooter, and N. Schillewaert. 2010. “The effect of rating scale format on response styles: The number of response categories and response category labels.” Int. J. Res. Market. 27 (3): 236–247. https://doi.org/10.1016/j.ijresmar.2010.02.004.
White House. 2022. “Bills signed: H.R. 468, H.R. 1766, H.R. 4877, H.R. 5641, H.R. 7500, H.R. 7846, H.R. 8982.” Accessed January 7, 2023. https://www.whitehouse.gov/briefing-room/legislation/2022/10/10/bills-signed-h-r-468-h-r-1766-h-r-4877-h-r-5641-h-r-7500-h-r-7846-h-r-8982/.
Wubbels, M. B. 2021. “Cost performance analysis between Design-Build and Design-Bid-Build projects in The Netherlands.” Doctoral dissertation, Faculty of Spatial Sciences, Univ. of Groningen.
Wulf, A. J. 2020. “Participatory legal forms for public enterprises. How a group of affiliated public service organisations can help to overcome legal and institutional obstacles.” J. Participation Employee Ownership 3 (1): 51–65. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001631.
Xiong, B., M. Skitmore, P. Xia, P. Ballesteros-Pérez, K. Ye, and X. Zhang. 2019. “Impact of corporate credit scoring on construction contractors in China.” J. Constr. Eng. Manage. 145 (4): 05019002. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001631.
Zhu, B., S. D. Walter, P. L. Rosenbaum, D. J. Russell, and P. Raina. 2006. “Structural equation and log-linear modeling: A comparison of methods in the analysis of a study on caregivers’ health.” BMC Med. Res. Methodol. 6 (1): 49.
Ziafati Bafarasat, A. 2021. Collecting and validating data: A simple guide for researchers. Yazd, Iran: Yazd Univ.

Information & Authors

Information

Published In

Go to Journal of Management in Engineering
Journal of Management in Engineering
Volume 39Issue 6November 2023

History

Received: Feb 2, 2023
Accepted: May 9, 2023
Published online: Aug 25, 2023
Published in print: Nov 1, 2023
Discussion open until: Jan 25, 2024

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Ramy Khalef, S.M.ASCE [email protected]
Ph.D. Candidate, Dept. of Civil, Architectural, and Environmental Engineering, Missouri Univ. of Science and Technology, 326 Butler-Carlton Hall, 1401 N. Pine St., Rolla, MO 65409. Email: [email protected]
Hurst-McCarthy Professor of Construction Engineering and Management, Professor of Civil Engineering, and Founding Director of Missouri Consortium of Construction Innovation, Dept. of Civil, Architectural, and Environmental Engineering and Dept. of Engineering Management and Systems Engineering, Missouri Univ. of Science and Technology, 228 Butler-Carlton Hall, 1401 N. Pine St., Rolla, MO 65409 (corresponding author). ORCID: https://orcid.org/0000-0002-7306-6380. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

  • Investigating Causes of Disputes Resulting in Litigation in Airport Development Projects in the United States Using Graph-Based Techniques, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-5903, 40, 3, (2024).

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share