Analyzing the Impact of DB versus DBB on Cost Performance in Airport Development: A Data-Driven Approach

Publication: Construction Research Congress 2024

ABSTRACT

The construction of airport projects can be complex and costly due to the many stakeholders involved and associated strict timelines. Traditional delivery methods, such as design-bid-build (DBB), employed in airport projects often result in major cost overruns due to multiple facets. Design-build (DB) is a construction method that combines design and construction under a single entity, and it has the potential to improve cost performance. None have evaluated DB from a cost perspective in the airport sector. This research fills this gap. First, the data is collected and assessed for validity. Second, risk ratings for cost performance are computed. Finally, the data is analyzed through statistical methods. Results reveal that low level of team collaboration is the most impacting factor to cost performance in DBB airport projects as compared to DBB. Ultimately, the findings will be valuable for airport stakeholders as they seek to improve cost performance through DB implementation.

Get full access to this article

View all available purchase options and get full access to this chapter.

REFERENCES

Ahmed, M. O., Khalef, R., Ali, G. G., and El-Adaway, I. H. (2022). Using Machine Learning to Identify the Most Critical Factors Affecting Maintenance of Tunnels. In Computing in Civil Engineering 2021 (pp. 1433–1440).
Alwin, D. F., and Krosnick, J. A. (1991). The reliability of survey attitude measurement: The influence of question and respondent attributes. Sociological methods & research, 20(1), 139–181.
Arditi, D., and Lee, D. E. (2003). Assessing the corporate service quality performance of design-build contractors using quality function deployment. Construction Management & Economics, 21(2), 175–185.
ASCE. (2021). “ASCE’s 2021 American infrastructure report card: GPA: C-.” Accessed March 22, 2021. https://infrastructurereportcard.org/.
Bowler, T. (2016, October 25). Heathrow expansion: How the cost of delays stacks up. BBC News. Retrieved January 7, 2023, from https://www.bbc.com/news/business-37575698.
BTS (Bureau of Transportation Statistics). (2019a). “Passengers: All carriers—All airports.” Accessed March 22, 2021. https://www.transtats.bts.gov/Data_Elements.aspx?Data=1.
BTS (Bureau of Transportation Statistics). (2019b). “November 2020 regularly scheduled flights with more than 50% delayed arrivals of more than 30 minutes.” Accessed March 22, 2021. https://www.bts.gov/november-2020-regularly-scheduled-flights-more-50-delayed-arrivals-more-30-minutes.
Davis, K. A. (2004). Information technology change in the architecture, engineering, and construction industry: An investigation of individuals’ resistance. Virginia Polytechnic Institute and State University.
El Wardani, M. A., Messner, J. I., and Horman, M. J. (2006). Comparing procurement methods for design-build projects. Journal of construction engineering and management, 132(3), 230–238.
El-Adaway, I. H., Abdul Nabi, M., Khalef, R., Elbashbishy, T., Ali, G. G., Eissa, R., and Ahmed, M. O. (2022). Graduate recruitment offers: ethical and professional considerations for engineering graduate students and faculty members. Ethics & Behavior, 1–19.
El-adaway, I. H., Ali, G. G., Eissa, R., Abdul Nabi, M., Ahmed, M. O., Elbashbishy, T., and Khalef, R. (2023). Journal of construction management and economics 40th anniversary: investigating knowledge structure and evolution of research trends. Construction Management and Economics, 1–23.
Feghaly, J., El Asmar, M., and Ariaratnam, S. T. (2020).“State of professional practice for water infrastructure project delivery.” Pract. Period. Struct. Des. Constr.25 (3): 04020018. https://doi.org/10.1061/(ASCE)SC.1943-5576.0000500.
Gad, G. M., Davis, B., Shrestha, P. P., and Harder, P. (2019). Lessons learned from progressive design-build implementation on airport projects. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 11(4), 04519020.
Ganiyu, A. Y., Taibat, A. R., and Damola, O. A. (2015). Factors contributing to non-adoption of value engineering methodology for building services. Jurnal Teknologi, 77(14).
Gransberg, D. D., and Molenaar, K. R. (2019). Critical comparison of progressive design-build and construction manager/general contractor project delivery methods. Transportation Research Record, 2673(1), 261–268.
Hale, D. R., Shrestha, P. P., Gibson, G. E., and Migliaccio, G. C. (2009).“Empirical comparison of design/build and design/bid/build project de-livery methods.” J. Constr. Eng. Manage.135 (7): 579–587.https://doi.org/10.1061/(ASCE)CO.1943-7862.0000017.
Hashem, S. (2014). The Power of Design-Build: A Guide to Effective Design-Build Project Delivery Using the SAFEDB-Methodology. Business Expert Press.
Khalef, R., and El-adaway, I. H. (2023). Identifying Design-Build Decision-Making Factors and Providing Future Research Guidelines: Social Network and Association Rule Analysis. Journal of Construction Engineering and Management, 149(1), 04022151.
Khalef, R., and El-Adaway, I. H. Identifying Substantial Changes for AIP Projects Using RF and SVM. In Computing in Civil Engineering 2021 (pp. 1425–1432).
MoDOT (Missouri DOT). (2020).“RFP TR202105, airport designbuild documents.”Accessed March 3, 2022.https://www.modot.org/sites/default/files/documents/TR202105_RFP_Final.pdf.
Panagoulia, E., and Rakha, T. (2023). Data Reliability in BIM and Performance Analytics: A Survey of Contemporary AECO Practice. Journal of Architectural Engineering, 29(2), 04023006.
Park, H. S., Lee, D., Kim, S., and Kim, J. L. (2015). “Comparing project performance of design-build and design-bid-build methods for large-sized public apartment housing projects in Korea.” J. Asian Archit. Build.Eng.14 (2): 323–330.https://doi.org/10.3130/jaabe.14.323.
Shrestha, A., Chan, T. K., Aibinu, A. A., Chen, C., and Martek, I. (2018). Risk allocation inefficiencies in Chinese PPP water projects. Journal of construction engineering and management, 144(4), 04018013.
Shrestha, P. P., and Batista, J. (2020). Lessons learned in design-build and construction-manager-at-risk water and wastewater project. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 12(2), 04520002.
Shrestha, P. P., and Neupane, K. P. (2020). Identification of geotechnical-related problems impacting cost, schedule, and claims on bridge construction projects. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 12(2), 04520005.
Shrestha, P. P., O’Connor, J. T., and Gibson, G. E., Jr. (2012). Performance comparison of large design-build and design-bid-build highway projects. Journal of construction engineering and management, 138(1), 1–13.
Vashani, H., Sullivan, J., and El Asmar, M. (2016). DB 2020: Analyzing and forecasting design-build market trends. Journal of Construction Engineering and Management, 142(6), 04016008.

Information & Authors

Information

Published In

Go to Construction Research Congress 2024
Construction Research Congress 2024
Pages: 10 - 19

History

Published online: Mar 18, 2024

Permissions

Request permissions for this article.

Authors

Affiliations

Ramy Khalef [email protected]
1Ph.D. Candidate, Dept. of Civil, Architectural, and Environmental Engineering, Missouri Univ. of Science and Technology, Rolla, MO. Email: [email protected]
Islam H. El-adaway [email protected]
2Hurst-McCarthy Professor of Construction Engineering and Management, Professor of Civil Engineering, and Founding Director of the Missouri Consortium of Construction Innovation, Dept. of Civil, Architectural, and Environmental Engineering and Dept. of Engineering Management and Systems Engineering, Missouri Univ. of Science and Technology, Rolla, MO. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$148.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$148.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share