Chapter
Jan 25, 2024

Understanding of Risky Determinants Affecting the Success of Design-Build Airport Projects Using Computational Clustering Techniques

Publication: Computing in Civil Engineering 2023

ABSTRACT

The current delivery practices of airport projects are traditionally outdated, lacking innovative and modern techniques which provide overall better cost, schedule, among other performance metrics. Design-build (DB) is an alternative and viable option for the effective delivery of airport projects. Previous studies have lacked in focusing on studying the determinants that affect the success of DB airport projects. This study aims to fill this gap. The goal of this research is to explore these determinants by computationally analyzing the perception of relevant experts. This goal is achieved by: (1) developing a survey to gather valid data on the likelihood of occurrence, impact on cost, and impact on schedule of 34 risk factors perceived in airport DB delivery as compared to design-bid-build (DBB); (2) clustering the data using the K-means technique; and (3) analyzing the clusters and providing insights from the emerging trends. Results indicate three clusters classified with low, moderate, and high-risk factors in terms of DB delivery as compared to DBB. The inability to fast-track delivery poses the least risk. Ineffective risk management was considered to be an example of a moderate risk. And inappropriate pricing agreement method was determined to be the riskiest. Ultimately, this study adds to the body of knowledge identifying key risks that affect the delivery of DB airport projects.

Get full access to this article

View all available purchase options and get full access to this chapter.

REFERENCES

Ahmed, M. O., Khalef, R., Ali, G. G., and El-adaway, I. H. (2021). Evaluating deterioration of tunnels using computational machine learning algorithms. Journal of construction engineering and management, 147(10), 04021125.
ASCE. (2021).“ASCE’s 2021 American infrastructure report card: GPA: C-.” Accessed March 22, 2021. https://infrastructurereportcard.org/.
Bowler, T. (2016, October 25). Heathrow expansion: How the cost of delays stacks up. BBC News. Retrieved January 7, 2023, from https://www.bbc.com/news/business-37575698.
BTS (Bureau of Transportation Statistics). (2019a). “Passengers: All carriers—All airports.” Accessed March 22, 2021. https://www.transtats.bts.gov/Data_Elements.aspx?Data=1.
BTS (Bureau of Transportation Statistics). (2019b). “November 2020 regularly scheduled flights with more than 50% delayed arrivals of more than 30 minutes.” Accessed March 22, 2021. https://www.bts.gov/november-2020-regularly-scheduled-flights-more-50-delayed-arrivals-more-30-minutes.
Christmann, A., and Van Aelst, S. (2006). Robust estimation of Cronbach’s alpha. Journal of Multivariate Analysis, 97(7), 1660–1674.
DBIA. (2013). Design-build done right. DBIA. Retrieved March 10, 2023, from https://dbia.org/wp-content/uploads/2018/05/Best-Practices-Universally-Applicable.pdf.
El-adaway, I. H., Abdul Nabi, M., Khalef, R., Elbashbishy, T., Ali, G. G., Eissa, R., and Ahmed, M. O. (2022). Graduate recruitment offers: ethical and professional considerations for engineering graduate students and faculty members. Ethics & Behavior, 1–19.
Hale, D. R., Shrestha, P. P., Gibson, G. E., and Migliaccio, G. C. (2009). “Empirical comparison of design/build and design/bid/build project delivery methods.” J. Constr. Eng. Manage.135 (7): 579–587. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000017.
Khalef, R., and El-adaway, I. H. (2021a). Automated identification of substantial changes in construction projects of airport improvement program: Machine learning and natural language processing comparative analysis. Journal of management in engineering, 37(6), 04021062.
Khalef, R., and El-Adaway, I. H. (2021b). Identifying Substantial Changes for AIP Projects Using RF and SVM. In Computing in Civil Engineering 2021 (pp. 1425–1432).
Khalef, R., and El-adaway, I. H. (2023). Identifying Design-Build Decision-Making Factors and Providing Future Research Guidelines: Social Network and Association Rule Analysis. Journal of Construction Engineering and Management, 149(1), 04022151.
Khalef, R., El-adaway, I. H., Assaad, R., and Kieta, N. (2021). Contract risk management: A comparative study of risk allocation in exculpatory clauses and their legal treatment. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 13(1), 04520036.
Kodinariya, T. M., and Makwana, P. R. (2013).“Review on determining number of cluster in K-means clustering.” Int. J.1 (6): 90–95.
Minchin, R. E., Jr., Li, X., Issa, R. R., and Vargas, G. G. (2013). Comparison of cost and time performance of design-build and design-bid-build delivery systems in Florida. Journal of construction engineering and management, 139(10), 04013007.
MoDOT (Missouri DOT). (2020).“RFP TR202105, airport designbuild documents.”Accessed March 3, 2022. https://www.modot.org/sites/default/files/documents/TR202105_RFP_Final.pdf.
Pishdad-Bozorgi, P., and de la Garza, J. M. (2012). “Comparative analysis of design-bid-build and design-build from the standpoint of claims.” In Proc., Construction Research Congress 2012: Construction Challenges in a Flat World, 21–30. Reston, VA: ASCE.
Ramsey, D., El Asmar, M., and Gibson, G. E. (2016).“Quantitative performance assessment of single-step versus two-step design-build procurement.”J. Constr. Eng. Manage.142 (9): 04016033.https://doi.org/10.1061/(ASCE)CO.1943-7862.0001145.
Sahari Moghaddam, A., Rezazadeh Azar, E., Mejias, Y., and Bell, H. (2020).“Estimating stripping of asphalt coating using k-means clustering and machine learning–based classification.” J. Comput. Civ. Eng.34 (1):04019044. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000864.
Santos, J. R. A. (1999). “Cronbach’s alpha: A tool for assessing the reliability of scales. ”J. Extension37 (2): 1–5.
Shrestha, P. P., O’Connor, J. T., and Gibson, G. E. (2012). “Performance comparison of large design-build and design-bid-build highway projects.” J. Constr. Eng. Manage.138 (1): 1–13. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000390.
Tran, D. Q., and Molenaar, K. R. (2014). Exploring critical delivery selection risk factors for transportation design and construction projects. Engineering, Construction and Architectural Management.
Tran, D. Q., Diraviam, G., and Minchin, R. E., Jr. (2018). Performance of highway design-bid-build and design-build projects by work types. Journal of construction engineering and management, 144(2), 04017112.
Weijters, B., Cabooter, E., and Schillewaert, N. (2010). The effect of rating scale format on response styles: The number of response categories and response category labels. International Journal of Research in Marketing, 27(3), 236–247.

Information & Authors

Information

Published In

Go to Computing in Civil Engineering 2023
Computing in Civil Engineering 2023
Pages: 539 - 546

History

Published online: Jan 25, 2024

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Ramy Khalef, S.M.ASCE [email protected]
1Ph.D. Candidate, Dept. of Civil, Architectural, and Environmental Engineering, Missouri Univ. of Science and Technology, Rolla, MO. Email: [email protected]
Islam El-adaway, F.ASCE [email protected]
2Hard Hurst-McCarthy Professor of Construction Engineering and Management, Professor of Civil Engineering, and Founding Director of Missouri Consortium of Construction Innovation, Dept. of Civil, Architectural, and Environmental Engineering and Dept. of Engineering Management and Systems Engineering, Missouri Univ. of Science and Technology, Rolla, MO. ORCID: https://orcid.org/0000-0002-7306-6380. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$198.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$198.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share