Technical Papers
Jan 31, 2022

Human-Organization-Technology Fit Model for BIM Adoption in Construction Project Organizations: Impact Factor Analysis Using SNA and Comparative Case Study

Publication: Journal of Management in Engineering
Volume 38, Issue 3

Abstract

The sluggish adoption of building information modeling (BIM) is attributable to various technical, managerial, personnel, procedural, and institutional issues encountered by an organization in which such adoption takes place. However, these issues are under researched from a holistic perspective. Based on a proposed human-organization-technology (HOT) fit model, this paper aims to study the impacting factors of HOT fit in BIM adoption within construction project organizations (CPOs). The HOT fit indexes of 14 BIM case projects were operationalized using social network analysis (SNA) method and how different factors impact the HOT fit and its three subdimensions [i.e., human-technology (HT) fit, organization-technology (OT) fit, and human-organization (HO) fit] was investigated using a comparative case study. It was found that the project size has significantly negative relations with HOT fit, HT fit, and OT fit; while hierarchy steepness has positive correlations with HT fit, OT fit, and HO fit. OT fit was also found to have a weakly negative relationship with BIM level of details (LODs). A joint factor analysis further disclosed that the flatter the hierarchy, the larger the project size, and the higher the BIM LOD, the more difficult to achieve a high HOT fit, HT fit, or OT fit. Thus, CPOs should use steeper hierarchical structure and take a progressive BIM adoption strategy by adopting from smaller projects and/or lower LODs. This research empirically examined how project organizational and technological factors can impact BIM adoption. The HOT fit model can help CPOs evaluate their general HOT fit status, redesign optimal HOT configuration, diagnose the problems when the HOT fit is not ideal, and make strategic directions to better harvest the benefits of BIM. Limitations and future research directions are also identified.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Some or all data, models, or code that support the findings of this study are available from the corresponding author upon reasonable request.

References

Ahmed, A. L., and M. Kassem. 2018. “A unified BIM adoption taxonomy: Conceptual development, empirical validation and application.” Autom. Constr. 96 (Dec): 103–127. https://doi.org/10.1016/j.autcon.2018.08.017.
Ajmal, M. M., and K. U. Koskinen. 2008. “Knowledge transfer in project-based organizations: An organizational culture perspective.” Project Manage. J. 39 (1): 7–15. https://doi.org/10.1002/pmj.20031.
Anderson, C., and C. E. Brown. 2010. “The functions and dysfunctions of hierarchy.” Res. Organizational Behav. 30: 55–89.
Antwi-Afari, M. F., H. Li, E. A. Pärn, and D. J. Edwards. 2018. “Critical success factors for implementing building information modelling (BIM): A longitudinal review.” Autom. Constr. 91 (Jul): 100–110. https://doi.org/10.1016/j.autcon.2018.03.010.
Apostolato, I.-A. 2013. “An overview of software applications for social network analysis.” Int. Rev. Soc. Res. 3 (3): 71–77. https://doi.org/10.1515/irsr-2013-0023.
Badi, S., and D. Diamantidou. 2017. “A social network perspective of building information modelling in Greek construction projects.” Arch. Eng. Des. Manage. 13 (6): 406–422. https://doi.org/10.1080/17452007.2017.1307167.
Becerik-Gerber, B., F. Jazizadeh, N. Li, and G. Calis. 2012. “Application areas and data requirements for BIM-enabled facilities management.” J. Constr. Eng. Manage. 138 (3): 431–442. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000433.
Bhatt, G. D. 2001. “Knowledge management in organizations: Examining the interaction between technologies, techniques, and people.” J. Knowl. Manage. 5 (1): 68–75. https://doi.org/10.1108/13673270110384419.
Bråthen, K., and A. Moum. 2016. “Bridging the gap: Bringing BIM to construction workers.” Eng. Constr. Archit. Manage. 23 (6): 751–764. https://doi.org/10.1108/ECAM-01-2016-0008.
Bueno, N. P. 2015. “Are opinion leaders important to spread information to cope with extreme droughts in (all) irrigation systems? A network analysis.” Scientometrics 105 (2): 817–824. https://doi.org/10.1007/s11192-015-1734-z.
Bunderson, S. J., G. S. Van Der Vegt, Y. Cantimur, and F. Rink. 2016. “Different views of hierarchy and why they matter: Hierarchy as inequality or as cascading influence.” Acad. Manage. J. 59 (4): 1265–1289. https://doi.org/10.5465/amj.2014.0601.
Burke, C. M., and M. J. Morley. 2016. “On temporary organizations: A review, synthesis and research agenda.” Hum. Relat. 69 (6): 1235–1258. https://doi.org/10.1177/0018726715610809.
Cantimur, Y., F. Rink, and G. S. van der Vegt. 2016. “When and why hierarchy steepness is related to team performance.” Eur. J. Work Org. Psychol. 25 (5): 658–673. https://doi.org/10.1080/1359432X.2016.1148030.
Cao, D., H. Li, G. Wang, X. Luo, and D. Tan. 2018. “Relationship network structure and organizational competitiveness: Evidence from BIM implementation practices in the construction industry.” J. Manage. Eng. 34 (3): 04018005. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000600.
Charehzehi, A., C. Chai, A. Md Yusof, H.-Y. Chong, and S. C. Loo. 2017. “Building information modeling in construction conflict management.” Int. J. Eng. Bus. Manage. 9 (Feb): 184797901774625. https://doi.org/10.1177/1847979017746257.
Chien, K. F., Z. H. Wu, and S. C. Huang. 2014. “Identifying and assessing critical risk factors for BIM projects: Empirical study.” Autom. Constr. 45 (Sep): 1–15. https://doi.org/10.1016/j.autcon.2014.04.012.
Chinowsky, P., and J. E. Taylor. 2012. “Networks in engineering: An emerging approach to project organization studies.” Eng. Project Org. J. 2 (1–2): 15–26. https://doi.org/10.1080/21573727.2011.635647.
Chinowsky, P. S., J. Diekmann, and J. O’Brien. 2010. “Project organizations as social networks.” J. Constr. Eng. Manage. 136 (4): 452–458. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000161.
Dakhil, A., J. Underwood, and M. Alshawi. 2019. “Critical success competencies for the BIM implementation process: UK construction clients.” J. Inf. Technol. Constr. 24 (Feb): 80–94.
Davies, R., and C. Harty. 2013. “Measurement and exploration of individual beliefs about the consequences of building information modelling use.” Construct. Manage. Econ. 31 (11): 1110–1127. https://doi.org/10.1080/01446193.2013.848994.
Dawod, M., and S. Hanna. 2019. “BIM-assisted object recognition for the on-site autonomous robotic assembly of discrete structures.” Constr. Rob. 3 (1–4): 69–81. https://doi.org/10.1007/s41693-019-00021-9.
Eisenhardt, K. M. 1989. “Building theories from case study research.” Acad. Manage. Rev. 14 (4): 532–550. https://doi.org/10.2307/258557.
Engwall, M. 2003. “No project is an island: Linking projects to history and context.” Res. Policy 32 (5): 789–808. https://doi.org/10.1016/S0048-7333(02)00088-4.
Eray, E., C. T. Haas, and D. Rayside. 2021. “Interface health and workload between stakeholders in complex capital projects: Assessment, visualization, and interpretation using SNA.” J. Manage. Eng. 37 (3): 04021006. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000891.
Esser, F., and R. Vliegenthart. 2017. “Comparative research methods.” The international encyclopedia of communication research methods, edited by J. Matthes, C. S. Davis, and R. F. Potter, 1–22. Hoboken, NJ: Wiley. https://doi.org/10.1002/9781118901731.iecrm0035.
Faysal, M. A. M., and S. Arifuzzaman. 2018. “A comparative analysis of large-scale network visualization tools.” In Proc., 2018 IEEE Int. Conf. on Big Data (Big Data). New York: IEEE.
Fellows, R., and A. M. Liu. 2012. “Managing organizational interfaces in engineering construction projects: Addressing fragmentation and boundary issues across multiple interfaces.” Construct. Manage. Econ. 30 (8): 653–671. https://doi.org/10.1080/01446193.2012.668199.
Flyvbjerg, B. 2006. “Five misunderstandings about case-study research.” Qual. Inq. 12 (2): 219–245. https://doi.org/10.1177/1077800405284363.
Gaur, S., and A. Tawalare. 2022. “Investigating the role of BIM in stakeholder management: Evidence from a metro-rail project.” J. Manage. Eng. 38 (1): 05021013. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000979.
Ghaffarianhoseini, A., J. Tookey, A. Ghaffarianhoseini, N. Naismith, S. Azhar, O. Efimova, and K. Raahemifar. 2017. “Building information modelling (BIM) uptake: Clear benefits, understanding its implementation, risks and challenges.” Renewable Sustainable Energy Rev. 75 (Aug): 1046–1053. https://doi.org/10.1016/j.rser.2016.11.083.
Gholizadeh, P., B. Esmaeili, and P. Goodrum. 2018. “Diffusion of building information modeling functions in the construction industry.” J. Manage. Eng. 34 (2): 04017060. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000589.
Hasan, A., S. Ahn, B. Baroudi, and R. Rameezdeen. 2021. “Structuration model of construction management professionals’ use of mobile devices.” J. Manage. Eng. 37 (4): 04021026. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000930.
He, Q., G. Wang, L. Luo, Q. Shi, J. Xie, and X. Meng. 2017. “Mapping the managerial areas of building information modeling (BIM) using scientometric analysis.” Int. J. Project Manage. 35 (4): 670–685. https://doi.org/10.1016/j.ijproman.2016.08.001.
Hobday, M. 2000. “Project based organisation: An ideal form for managing complex products and systems?” Res. Policy 29 (7–8): 871–893. https://doi.org/10.1016/S0048-7333(00)00110-4.
Hossain, L. 2009. “Communications and coordination in construction projects.” Construct. Manage. Econ. 27 (1): 25–39. https://doi.org/10.1080/01446190802558923.
Huang, Y., Q. Shi, F. Pena-Mora, Y. Lu, and C. Shen. 2020. “Exploring the impact of information and communication technology on team social capital and construction project performance.” J. Manage. Eng. 36 (5): 04020056. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000804.
Jacomy, M., T. Venturini, S. Heymann, and M. Bastian. 2014. “ForceAtlas2, a continuous graph layout algorithm for handy network visualization designed for the Gephi software.” PLoS One 9 (6): e98679. https://doi.org/10.1371/journal.pone.0098679.
Jang, S., Y. Jeong, G. Lee, and Y. Kang. 2019. “Enhancing subcontractors’ participation in BIM-based design coordination under a DBB contract.” J. Manage. Eng. 35 (6): 04019022. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000714.
Kim, K., Y. K. Cho, and K. Kim. 2018. “BIM-based decision-making framework for scaffolding planning.” J. Manage. Eng. 34 (6): 04018046. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000656.
Kim, K. P., S. Mostafa, and K. S. Park. 2020. “Integrated BIM education in construction project management program.” In Claiming identity through redefined teaching in construction programs, 134–152. Hershey, PA: IGI Global.
Kim, S., S. Chin, and S. Kwon. 2019. “A discrepancy analysis of BIM-based quantity take-off for building interior components.” J. Manage. Eng. 35 (3): 05019001. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000684.
Kristof, A. L. 1996. “Person-organization fit: An integrative review of its conceptualizations, measurement, and implications.” Personnel Psychol. 49 (1): 1–49. https://doi.org/10.1111/j.1744-6570.1996.tb01790.x.
Lee, S., J. Yu, and D. Jeong. 2015. “BIM acceptance model in construction organizations.” J. Manage. Eng. 31 (3): 04014048. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000252.
Li, Q., H. Y. Chong, C. Y. Lee, and Y. Zhang. 2021. “BIM’s formal and informal collaborative networks in traditional procurement: Insights from the construction phase of a hospital case study.” J. Manage. Eng. 37 (6): 05021008. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000965.
Liao, L., and E. Teo. 2018. “Organizational change perspective on people management in BIM implementation in building projects.” J. Manage. Eng. 34 (3): 04018008. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000604.
Liao, L., E. A. L. Teo, L. Li, X. Zhao, and G. Wu. 2021. “Reducing non-value-adding BIM implementation activities for building projects in Singapore: Leading causes.” J. Manage. Eng. 37 (3): 05021003. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000900.
Lijphart, A. 1971. “Comparative politics and the comparative method.” Am. Political Sci. Rev. 65 (3): 682–693. https://doi.org/10.2307/1955513.
Liu, Y., S. van Nederveen, and M. Hertogh. 2017. “Understanding effects of BIM on collaborative design and construction: An empirical study in China.” Int. J. Project Manage. 35 (4): 686–698. https://doi.org/10.1016/j.ijproman.2016.06.007.
Lu, W., J. Xu, and J. Söderlund. 2020. “Exploring the effects of building information modeling on projects: Longitudinal social network analysis.” J. Constr. Eng. Manage. 146 (5): 04020037. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001823.
Lundin, R. A., and A. Söderholm. 1995. “A theory of the temporary organization.” Scand. J. Manage. 11 (4): 437–455. https://doi.org/10.1016/0956-5221(95)00036-U.
Ma, X., F. Xiong, T. O. Olawumi, N. Dong, and A. P. Chan. 2018. “Conceptual framework and roadmap approach for integrating BIM into lifecycle project management.” J. Manage. Eng. 34 (6): 05018011. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000647.
MacCallum, R. C., K. F. Widaman, S. Zhang, and S. Hong. 1999. “Sample size in factor analysis.” Psychol. Methods 4 (1): 84. https://doi.org/10.1037/1082-989X.4.1.84.
Mäki, T., and H. Kerosuo. 2015. “Site managers’ daily work and the uses of building information modelling in construction site management.” Construct. Manage. Econ. 33 (3): 163–175. https://doi.org/10.1080/01446193.2015.1028953.
Merschbrock, C., M. R. Hosseini, I. Martek, M. Arashpour, and G. Mignone. 2018. “Collaborative role of sociotechnical components in BIM-based construction networks in two hospitals.” J. Manage. Eng. 34 (4): 05018006. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000605.
Miettinen, R., and S. Paavola. 2014. “Beyond the BIM utopia: Approaches to the development and implementation of building information modeling.” Autom. Constr. 43 (Jul): 84–91. https://doi.org/10.1016/j.autcon.2014.03.009.
Miterev, M., M. Mancini, and R. Turner. 2017. “Towards a design for the project-based organization.” Int. J. Project Manage. 35 (3): 479–491. https://doi.org/10.1016/j.ijproman.2016.12.007.
Oliveira, N., and F. Lumineau. 2017. “How coordination trajectories influence the performance of interorganizational project networks.” Organ. Sci. 28 (6): 1029–1060. https://doi.org/10.1287/orsc.2017.1151.
Ozorhon, B., and U. Karahan. 2017. “Critical success factors of building information modeling implementation.” J. Manage. Eng. 33 (3): 04016054. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000505.
Papadonikolaki, E., C. van Oel, and M. Kagioglou. 2019. “Organising and Managing boundaries: A structurational view of collaboration with Building Information Modelling (BIM)” Int. J. Project Manage. 37 (3): 378–394. https://doi.org/10.1016/j.ijproman.2019.01.010.
Pryke, S. 2004. “Analysing construction project coalitions: Exploring the application of social network analysis.” Construct. Manage. Econ. 22 (8): 787–797. https://doi.org/10.1080/0144619042000206533.
Pryke, S. 2012. Social network analysis in construction. New York: Wiley.
Pryke, S., S. Badi, H. Almadhoob, B. Soundararaj, and S. Addyman. 2018. “Self-organizing networks in complex infrastructure projects.” Project Manage. J. 49 (2): 18–41. https://doi.org/10.1177/875697281804900202.
Pryke, S., S. Badi, and L. Bygballe. 2017. “Editorial for the special issue on social networks in construction.” Construct. Manage. Econ. 35 (8–9): 445–454. https://doi.org/10.1080/01446193.2017.1341052.
Ribeirinho, M. J., J. Mischke, G. Strube, E. Sjödin, J. L. Blanco, R. Palter, J. Biörck, D. Rockhill, and T. Andersson. 2020. “The next normal in construction: How disruption is reshaping the world’s largest ecosystem.” Accessed June 28, 2021. https://mck.co/3DkRbYK.
Sacks, R., C. Eastman, G. Lee, and P. Teicholz. 2018. BIM handbook: A guide to building information modeling for owners, designers, engineers, contractors, and facility managers. New York: Wiley.
Sanderson, J. 2012. “Risk, uncertainty and governance in megaprojects: A critical discussion of alternative explanations.” Int. J. Project Manage. 30 (4): 432–443. https://doi.org/10.1016/j.ijproman.2011.11.002.
Singh, V., N. Gu, and X. Wang. 2011. “A theoretical framework of a BIM-based multi-disciplinary collaboration platform.” Autom. Constr. 20 (2): 134–144. https://doi.org/10.1016/j.autcon.2010.09.011.
Söderlund, J. 2011. “Pluralism in project management: Navigating the crossroads of specialization and fragmentation.” Int. J. Manage. Rev. 13 (2): 153–176. https://doi.org/10.1111/j.1468-2370.2010.00290.x.
Söderlund, J., and J. Sydow. 2019. “Projects and institutions: Towards understanding their mutual constitution and dynamics.” Int. J. Project Manage. 37 (2): 259–268. https://doi.org/10.1016/j.ijproman.2019.01.001.
Steen, J., R. DeFillippi, J. Sydow, S. Pryke, and I. Michelfelder. 2018. “Projects and networks: Understanding resource flows and governance of temporary organizations with quantitative and qualitative research methods.” Project Manage. J. 49 (2): 3–17. https://doi.org/10.1177/875697281804900201.
Sun, C., S. Jiang, M. J. Skibniewski, Q. Man, and L. Shen. 2017. “A literature review of the factors limiting the application of BIM in the construction industry.” Technol. Econ. Dev. Econ. 23 (5): 764–779. https://doi.org/10.3846/20294913.2015.1087071.
Tang, X., H. Y. Chong, and W. Zhang. 2019. “Relationship between BIM implementation and performance of OSM projects.” J. Manage. Eng. 35 (5): 04019019. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000704.
Van de Ven, A. H., and M. S. Poole. 2005. “Alternative approaches for studying organizational change.” Organ. Stud. 26 (9): 1377–1404. https://doi.org/10.1177/0170840605056907.
Venkatraman, N. 1989. “The concept of fit in strategy research: Toward verbal and statistical correspondence.” Acad. Manage. Rev. 14 (3): 423–444. https://doi.org/10.2307/258177.
Wang, H., W. Lu, J. Söderlund, and K. Chen. 2018. “The interplay between formal and informal institutions in projects: A social network analysis.” Project Manage. J. 49 (4): 20–35. https://doi.org/10.1177/8756972818781629.
Wasserman, S., and K. Faust. 1994. Vol. 8 of Social network analysis: Methods and applications. Cambridge, UK: Cambridge University Press.
Wen, Q., and M. Qiang. 2016. “Coordination and knowledge sharing in construction project-based organization: A longitudinal structural equation model analysis.” Autom. Constr. 72: 309–320. https://doi.org/10.1016/j.autcon.2016.06.002.
Xu, J. 2021. “A human-organization-technology fit model to harness the power of building information modeling in construction project organizations.” Accessed July 23, 2021. http://hub.hku.hk/bitstream/10722/300398/1/FullText.pdf.
Xu, J., and W. Lu. 2020. “The iron triangle of BIM adoption in construction project organizations.” In Proc., 25th Int. Symp. on Advancement of Construction Management and Real Estate. Berlin: Springer.
Yin, R. K. 2014. Case study research: Design and methods. 5th ed. Thousand Oaks, CA: SAGE.
Yusof, M. M., J. Kuljis, A. Papazafeiropoulou, and L. K. Stergioulas. 2008. “An evaluation framework for Health Information Systems: Human, organization and technology-fit factors (HOT-fit).” Int. J. Med. Inf. 77 (6): 386–398. https://doi.org/10.1016/j.ijmedinf.2007.08.011.

Information & Authors

Information

Published In

Go to Journal of Management in Engineering
Journal of Management in Engineering
Volume 38Issue 3May 2022

History

Received: Sep 1, 2021
Accepted: Nov 11, 2021
Published online: Jan 31, 2022
Published in print: May 1, 2022
Discussion open until: Jun 30, 2022

Permissions

Request permissions for this article.

Authors

Affiliations

Postdoctoral Fellow, Dept. of Real Estate and Construction, Faculty of Architecture, Univ. of Hong Kong, 714, Knowles Bldg., Pokfulam Rd., Hong Kong SAR, China (corresponding author). ORCID: https://orcid.org/0000-0001-9589-6396. Email: [email protected]
Professor, Dept. of Real Estate and Construction, Faculty of Architecture, Univ. of Hong Kong, 715, Knowles Bldg., Pokfulam Rd., Hong Kong SAR, China. ORCID: https://orcid.org/0000-0003-4674-0357. Email: [email protected]
Associate Professor, Bartlett School of Sustainable Construction, Faculty of the Built Environment, Univ. College London, 251, 1-19 Torrington Place, London WC1E 7HB, UK. ORCID: https://orcid.org/0000-0003-1952-1570. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

  • Strength of Strong Ties: Empirical Evidence from the Construction Waste Hauling Business in Hong Kong, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-6111, 40, 6, (2024).
  • Contagion of BIM Implementation Practices in Interproject Networks: An Empirical Study in China, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-5639, 40, 1, (2024).
  • Turning Pressure into Power: The Configuration Effect of Antecedents on the Digital Transformation of Engineering Enterprises, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-5636, 40, 1, (2024).
  • A BIM-Based Framework for Managing Handover Information Loss, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-5623, 40, 5, (2024).
  • How Does Hierarchy Steepness Affect Coordination in Project-Based Organizations? A Social Network Analysis, Project Management Journal, 10.1177/87569728221150897, (875697282211508), (2023).
  • Impacts of Policy Mix Comprehensiveness on BIM Implementation: Moderating Effects of Environmental State and Response Uncertainty, Journal of Construction Engineering and Management, 10.1061/JCEMD4.COENG-12716, 149, 2, (2023).
  • Isomorphic Pressures to Catalyze Innovation Diffusion in Construction Project–Based Organizations: Identification of Source Factors, Journal of Construction Engineering and Management, 10.1061/JCEMD4.COENG-12475, 149, 2, (2023).
  • Evaluation of Elearning Using the Human Organization Technology (HOT) Model, 2022 4th International Conference on Cybernetics and Intelligent System (ICORIS), 10.1109/ICORIS56080.2022.10031447, (1-4), (2022).
  • Developing a human-organization-technology fit model for information technology adoption in organizations, Technology in Society, 10.1016/j.techsoc.2022.102010, 70, (102010), (2022).

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share