Understanding the Effect of BIM Capability Imbalance on Opportunistic Behavior: The Case of the Chinese Construction Market

Publication: Journal of Management in Engineering
Volume 38, Issue 3

Abstract

Although building information modeling (BIM) is believed to have the potential to curb opportunistic behavior, opportunism is observed in some BIM-enabled projects surprisingly often. One possible reason is that, in current practice, the BIM capabilities of project participants are often imbalanced. This study proposes a theoretical framework to understand the impact of BIM capability imbalance on opportunistic behavior and to identify the boundary conditions. Two influential factors, BIM application scope and trust, are considered as moderators. Based on data collected from 296 responses to an electronic questionnaire survey sent to construction companies in China, the effect of BIM capability imbalance on opportunistic behavior was examined from the perspective of the Chinese construction market, and the moderating roles of BIM application scope and trust were explored. The survey results revealed that (1) BIM capability imbalance is positively related to opportunistic behavior (both strong-form and weak-form); (2) BIM application scope can enhance the positive effect of BIM capability imbalance on opportunistic behavior (both strong-form and weak-form); and (3) trust weakens the positive effect of BIM capability imbalance on opportunistic behavior (both strong-form and weak-form). This research contributes to the existing literature on the application of BIM by investigating the effects of BIM capability imbalance on opportunistic behavior and its boundary conditions, which helps to provide a better understanding of the opportunistic risk brought by BIM. This study also enriches the existing literature of information technology application and governance, as it provides empirical evidence in a construction project context for the moderating role of technology application scope and trust. Moreover, this research offers managerial suggestions for parties involved in BIM-enabled construction projects to better govern such projects by choosing partners with balanced BIM capability, determining an appropriate scope for BIM application, and implementing trust mechanisms.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

All data, models, or code that support the findings of this study are available from the corresponding author upon reasonable request.

Acknowledgments

This study received support from the National Natural Science Foundation of China (NSFC) under Grants Nos. 72031008 and 71901161. The authors thank the NSFC for its financial support and are grateful to all the respondents and interviewees who participated in the survey.

References

Achrol, R. S., and G. T. Gundlach. 1999. “Legal and social safeguards against opportunism in exchange.” J. Retail. 75 (1): 107–124. https://doi.org/10.1016/S0022-4359(99)80006-2.
Anderson, E. 1988. “Transaction costs as determinants of opportunism in integrated and independent sales forces.” J. Econ. Behav. Organ. 9 (3): 247–264. https://doi.org/10.1016/0167-2681(88)90036-4.
Azhar, S., A. Nadeem, J. Y. N. Mok, and B. H. Y. Leung. 2008. “Building information modeling (BIM): A new paradigm for visual interactive modeling and simulation for construction projects.” In Proc., 1st Int. Conf. on Construction in Developing Countries, 435–446. Greenville, NC: East Carolina Univ.
Bharadwaj, A. S. 2000. “A resource-based perspective on information technology capability and firm performance: An empirical investigation.” MIS Q. 24 (1): 169–196. https://doi.org/10.2307/3250983.
Boukendour, S. 2007. “Preventing post-contractual opportunism by an option to switch from one contract to another.” Construct. Manage. Econ. 25 (7): 723–727. https://doi.org/10.1080/01446190701392994.
Cao, D., H. Li, and G. Wang. 2014. “Impacts of isomorphic pressures on BIM adoption in construction projects.” J. Constr. Eng. Manage. 140 (12): 04014056. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000903.
Cao, D., H. Li, and G. Wang. 2017a. “Impacts of building information modeling (BIM) implementation on design and construction performance: A resource dependence theory perspective.” Front. Eng. Manage. 4 (1): 20. https://doi.org/10.15302/J-FEM-2017010.
Cao, D., H. Li, G. Wang, and T. Huang. 2017b. “Identifying and contextualising the motivations for BIM implementation in construction projects: An empirical study in China.” Int. J. Project Manage. 35 (4): 658–669. https://doi.org/10.1016/j.ijproman.2016.02.002.
Cao, D., H. Li, G. Wang, X. Luo, and D. Tan. 2018. “Relationship network structure and organizational competitiveness: Evidence from BIM implementation practices in the construction industry.” J. Manage. Eng. 34 (3): 04018005. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000600.
Chang, C.-Y. 2013. “Understanding the hold-up problem in the management of megaprojects: The case of the channel tunnel rail link project.” Int. J. Project Manage. 31 (4): 628–637. https://doi.org/10.1016/j.ijproman.2012.10.012.
Che Ibrahim, C. K. I., N. A. Mohamad Sabri, S. Belayutham, and A. Mahamadu. 2019. “Exploring behavioural factors for information sharing in BIM projects in the Malaysian construction industry.” Built Environ. Project Asset Manage. 9 (1): 15–28. https://doi.org/10.1108/BEPAM-02-2018-0042.
Cheung, S. O., and T. W. Yiu. 2006. “Are construction disputes inevitable?” IEEE Trans. Eng. Manage. 53 (3): 456–470. https://doi.org/10.1109/TEM.2006.877445.
Cohen, J. R., L. Holder-Webb, D. J. Sharp, and L. W. Pant. 2007. “The effects of perceived fairness on opportunistic behavior.” Contemp. Acc. Res. 24 (4): 1119–1138. https://doi.org/10.1506/car.24.4.3.
Cortina, J. M. 1993. “What is coefficient alpha? An examination of theory and applications.” J. Appl. Psychol. 78 (1): 98–104. https://doi.org/10.1037/0021-9010.78.1.98.
Covin, J. G., and D. P. Slevin. 1991. “A conceptual model of entrepreneurship as firm behavior.” Entrep. Theory Pract. 16 (1): 7–26. https://doi.org/10.1177/104225879101600102.
Dang, T., and H.-J. Bargstädt. 2016. “4D relationships: The missing link in 4D scheduling.” J. Constr. Eng. Manage. 142 (2): 04015072. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001007.
Das, T. K. 2004. “Time-span and risk of partner opportunism in strategic alliances.” J. Manage. Psychol. 19 (8): 744–759. https://doi.org/10.1108/02683940410568239.
Das, T. K., and N. Rahman. 2010. “Determinants of partner opportunism in strategic alliances: A conceptual framework.” J. Bus. Psychol. 25 (1): 55–74. https://doi.org/10.1007/s10869-009-9132-2.
Dhanaraj, C., and A. Parkhe. 2006. “Orchestrating innovation networks.” Acad. Manage. Rev. 31 (3): 659–669. https://doi.org/10.5465/amr.2006.21318923.
Dossick, C. S., and G. Neff. 2010. “Organizational divisions in BIM-enabled commercial construction.” J. Constr. Eng. Manage. 136 (4): 459–467. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000109.
Dyer, J. H., and W. Chu. 2003. “The role of trustworthiness in reducing transaction costs and improving performance: Empirical evidence from the United States, Japan, and Korea.” Organ. Sci. 14 (1): 57–68. https://doi.org/10.1287/orsc.14.1.57.12806.
Eastman, C., P. Teicholtz, R. Sacks, and K. Liston. 2012. BIM handbook: A guide to building information modeling for owners, managers, designers, engineers and contractors. New York: Wiley.
Fornell, C., and D. F. Larcker. 1981. “Evaluating structural equation models with unobservable variables and measurement error.” J. Marketing Res. 18 (1): 39. https://doi.org/10.1177/002224378101800104.
Forsythe, P., S. Sankaran, and C. Biesenthal. 2015. “How far can BIM reduce information asymmetry in the Australian construction context?” Project Manage. J. 46 (3): 75–87. https://doi.org/10.1002/pmj.21504.
Franz, B., R. Leicht, K. Molenaar, and J. Messner. 2017. “Impact of team integration and group cohesion on project delivery performance.” J. Constr. Eng. Manage. 143 (1): 04016088. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001219.
Givon, M. M., and Z. Shapira. 1984. “Response to rating scales: A theoretical model and its application to the number of categories problem.” J. Marketing Res. 21 (4): 410–419. https://doi.org/10.1177/002224378402100406.
Hartmann, T., J. Gao, and M. Fischer. 2008. “Areas of application for 3D and 4D models on construction projects.” J. Constr. Eng. Manage. 134 (10): 776–785. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:10(776).
Hawkins, T. G., T. L. Pohlen, and V. R. Prybutok. 2013. “Buyer opportunism in business-to-business exchange.” Ind. Marketing Manage. 42 (8): 1266–1278. https://doi.org/10.1016/j.indmarman.2013.05.022.
Jap, S. D., and S. Ganesan. 2000. “Control mechanisms and the relationship life cycle: Implications for safeguarding specific investments and developing commitment.” J. Marketing Res. 37 (2): 227–245. https://doi.org/10.1509/jmkr.37.2.227.18735.
Jin, R. Y., C. Hancock, L. Tang, C. Chen, D. Wanatowski, and L. Yang. 2017. “Empirical study of BIM implementation-based perceptions among Chinese practitioners.” J. Manage. Eng. 33 (5): 04017025. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000538.
Jin, X.-H., and G. Zhang. 2011. “Modelling optimal risk allocation in PPP projects using artificial neural networks.” Int. J. Project Manage. 29 (5): 591–603. https://doi.org/10.1016/j.ijproman.2010.07.011.
Joshi, A., S. Kale, S. Chandel, and D. Pal. 2015. “Likert scale: Explored and explained.” Br. J. Appl. Sci. Technol. 7 (4): 396–403. https://doi.org/10.9734/BJAST/2015/14975.
Kadefors, A. 2004. “Trust in project relationships—Inside the black box.” Int. J. Project Manage. 22 (3): 175–182. https://doi.org/10.1016/S0263-7863(03)00031-0.
Korczynski, M. 1994. “Low trust and opportunism in action.” J. Ind. Stud. 1 (2): 43–64. https://doi.org/10.1080/13662719400000003.
Kumar, N., L. K. Scheer, and J.-B. E. M. Steenkamp. 1995. “The effects of perceived interdependence on dealer attitudes.” J. Marketing Res. 32 (3): 348–356. https://doi.org/10.1177/002224379503200309.
Lado, A. A., R. R. Dant, and A. G. Tekleab. 2008. “Trust-opportunism paradox, relationalism, and performance in interfirm relationships: Evidence from the retail industry.” Strategic Manage. J. 29 (4): 401–423. https://doi.org/10.1002/smj.667.
Lee, C.-Y., and H.-Y. Chong. 2021. “Influence of prior ties on trust and contract functions for BIM-enabled EPC megaproject performance.” J. Constr. Eng. Manage. 147 (7): 04021057. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002076.
Lee, C.-Y., H.-Y. Chong, Q. Li, and X. Wang. 2020. “Joint contract–function effects on BIM-enabled EPC project performance.” J. Constr. Eng. Manage. 146 (3): 04020008. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001766.
Liu, Y., S. van Nederveen, and M. Hertogh. 2017. “Understanding effects of BIM on collaborative design and construction: An empirical study in China.” Int. J. Project Manage. 35 (4): 686–698. https://doi.org/10.1016/j.ijproman.2016.06.007.
Lu, P., S. Guo, L. Qian, P. He, and X. Xu. 2015. “The effectiveness of contractual and relational governances in construction projects in China.” Int. J. Project Manage. 33 (1): 212–222. https://doi.org/10.1016/j.ijproman.2014.03.004.
Lu, P., L. Qian, Z. Chu, and X. Xu. 2016a. “Role of opportunism and trust in construction projects: Empirical evidence from China.” J. Manage. Eng. 32 (2): 05015007. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000401.
Lu, W., J. Xu, and J. Söderlund. 2020. “Exploring the effects of building information modeling on projects: Longitudinal social network analysis.” J. Constr. Eng. Manage. 146 (5): 04020037. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001823.
Lu, W., L. Zhang, and L. Zhang. 2016b. “Effect of contract completeness on contractors’ opportunistic behavior and the moderating role of interdependence.” J. Constr. Eng. Manage. 142 (6): 04016004. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001110.
Luo, J., and J.-J. Meyer. 2017. “A formal account of opportunism based on the situation calculus.” AI Soc. 32 (4): 527–542. https://doi.org/10.1007/s00146-016-0665-4.
Luo, Y. 2006. “Opportunism in inter-firm exchanges in emerging markets.” Manage. Organ. Rev. 2 (1): 121–147. https://doi.org/10.1111/j.1740-8784.2006.00032.x.
Luo, Y., Y. Liu, Q. Yang, V. Maksimov, and J. Hou. 2015. “Improving performance and reducing cost in buyer–supplier relationships: The role of justice in curtailing opportunism.” J. Bus. Res. 68 (3): 607–615. https://doi.org/10.1016/j.jbusres.2014.08.011.
Ma, P., S. Zhang, Y. Hua, and J. Zhang. 2020a. “Behavioral perspective on BIM postadoption in construction organizations.” J. Manage. Eng. 36 (1): 04019036. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000729.
Ma, X., A. P. C. Chan, Y. Li, B. Zhang, and F. Xiong. 2020b. “Critical strategies for enhancing BIM implementation in AEC projects: Perspectives from Chinese practitioners.” J. Constr. Eng. Manage. 146 (2): 05019019. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001748.
Mahamadu, A. M., L. Mahdjoubi, and C. A. Booth. 2017. “Critical BIM qualification criteria for construction pre-qualification and selection.” Archit. Eng. Des. Manage. 13 (5): 326–343. https://doi.org/10.1080/17452007.2017.1296812.
Mahamadu, A.-M., L. Mahdjoubi, C. Booth, P. Manu, and E. Manu. 2019. “Building information modelling (BIM) capability and delivery success on construction projects.” Constr. Innov. 19 (2): 170–192. https://doi.org/10.1108/CI-03-2018-0016.
Malhotra, D., and F. Lumineau. 2011. “Trust and collaboration in the aftermath of conflict: The effects of contract structure.” Acad. Manage. J. 54 (5): 981–998. https://doi.org/10.5465/amj.2009.0683.
Messner, J., C. Anumba, C. Dubler, S. Goodman, R. Kreider, R. Leicht, C. Saluja, and N. Zikic. 2021. “BIM project execution planning guide, version 3.0—Under development.” In Computer integrated construction research program. State College, PA: Pennsylvania State Univ.
Mishra, A., A. Chandrasekaran, and A. MacCormack. 2015. “Collaboration in multi-partner R&D projects: The impact of partnering scale and scope.” J. Oper. Manage. 33–34 (1): 1–14. https://doi.org/10.1016/j.jom.2014.09.008.
Nunlee, M. P. 2005. “The control of intra-channel opportunism through the use of inter-channel communication.” Ind. Marketing Manage. 34 (5): 515–525. https://doi.org/10.1016/j.indmarman.2004.09.010.
Orr, R. J., and W. R. Scott. 2008. “Institutional exceptions on global projects: A process model.” J. Int. Bus. Stud. 39 (4): 562–588. https://doi.org/10.1057/palgrave.jibs.8400370.
Parkhe, A. 1993. “Strategic alliance structuring: A game theoretic and transaction cost examination of interfirm cooperation.” Acad. Manage. J. 36 (4): 794–829. https://doi.org/10.2307/256759.
Podsakoff, P. M., S. B. MacKenzie, J.-Y. Lee, and N. P. Podsakoff. 2003. “Common method biases in behavioral research: A critical review of the literature and recommended remedies.” J. Appl. Psychol. 88 (5): 879–903. https://doi.org/10.1037/0021-9010.88.5.879.
Poppo, L., K. Z. Zhou, and J. J. Li. 2016. “When can you trust ‘trust’? Calculative trust, relational trust, and supplier performance.” Strategic Manage. J. 37 (4): 724–741. https://doi.org/10.1002/smj.2374.
Redmond, A., A. Hore, M. Alshawi, and R. West. 2012. “Exploring how information exchanges can be enhanced through Cloud BIM.” Autom. Constr. 24 (Jul): 175–183. https://doi.org/10.1016/j.autcon.2012.02.003.
Rousseau, D. M., S. B. Sitkin, R. S. Burt, and C. Camerer. 1998. “Not so different after all: A cross-discipline view of trust.” Acad. Manage. Rev. 23 (3): 393–404. https://doi.org/10.5465/amr.1998.926617.
Schepker, D. J., W. Y. Oh, A. Martynov, and L. Poppo. 2014. “The many futures of contracts: Moving beyond structure and safeguarding to coordination and adaptation.” J. Manage. 40 (1): 193–225. https://doi.org/10.1177/0149206313491289.
Shek-Pui Wong, P., and S.-O. Cheung. 2004. “Trust in construction partnering: Views from parties of the partnering dance.” Int. J. Project Manage. 22 (6): 437–446. https://doi.org/10.1016/j.ijproman.2004.01.001.
Shi, C., Y. Chen, J. You, and H. Yao. 2018. “Asset specificity and contractors’ opportunistic behavior: Moderating roles of contract and trust.” J. Manage. Eng. 34 (5): 04018026. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000632.
Shou, W., J. Wang, X. Wang, and H. Y. Chong. 2015. “A comparative review of building information modelling implementation in building and infrastructure industries.” Arch. Comput. Methods Eng. 22 (2): 291–308. https://doi.org/10.1007/s11831-014-9125-9.
Succar, B., W. Sher, and A. Williams. 2013. “An integrated approach to BIM competency assessment, acquisition and application.” Autom. Constr. 35 (Nov): 174–189. https://doi.org/10.1016/j.autcon.2013.05.016.
Tang, X., H. Y. Chong, and W. Zhang. 2019. “Relationship between BIM implementation and performance of OSM projects.” J. Manage. Eng. 35 (5): 04019019. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000704.
Wang, D., H. Fu, and S. Fang. 2019a. “The efficacy of trust for the governance of uncertainty and opportunism in megaprojects: The moderating role of contractual control.” Eng. Constr. Archit. Manage. 27 (1): 150–167. https://doi.org/10.1108/ECAM-09-2018-0409.
Wang, E. T. G., and H.-L. Wei. 2007. “Interorganizational governance value creation: Coordinating for information visibility and flexibility in supply chains*: Interorganizational governance value creation.” Decis. Sci. 38 (4): 647–674. https://doi.org/10.1111/j.1540-5915.2007.00173.x.
Wang, H., and X. Meng. 2021. “BIM-supported knowledge management: Potentials and expectations.” J. Manage. Eng. 37 (4): 04021032. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000934.
Wang, X., and Z. Yang. 2013. “Inter-firm opportunism: A meta-analytic review and assessment of its antecedents and effect on performance.” J. Bus. Ind. Marketing 28 (2): 137–146. https://doi.org/10.1108/08858621311295272.
Wang, Y., Y. Chen, W. Wang, Y. Chen, and M. Jin. 2019b. “Revisiting the relationship between contract governance and contractors’ opportunistic behavior in construction projects.” IEEE Trans. Eng. Manage. https://doi.org/10.1109/TEM.2019.2945551.
Williamson, O. E. 1975. Market and hierarchies: Analysis and antitrust implications (a study in the economics of internal organization). New York: Free Press.
Williamson, O. E. 1985. The economic institutions of capitalism: Firms, markets, relational contracting. New York: Free Press.
Xiang, P., J. Zhou, X. Zhou, and K. Ye. 2012. “Construction project risk management based on the view of asymmetric information.” J. Constr. Eng. Manage. 138 (11): 1303–1311. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000548.
Xiao, J., K. Xie, and Q. Hu. 2013. “Inter-firm IT governance in power-imbalanced buyer-supplier dyads: Exploring how it works and why it lasts.” Eur. J. Inf. Syst. 22 (5): 512–528. https://doi.org/10.1057/ejis.2012.40.
Yan, L., and L. Zhang. 2020. “Interplay of contractual governance and trust in improving construction project performance: Dynamic perspective.” J. Manage. Eng. 36 (4): 04020029. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000791.
Yang, N., Y. Song, Y. Zhang, and J. Wang. 2020. “Dark side of joint R&D collaborations: Dependence asymmetry and opportunism.” J. Bus. Ind. Marketing 35 (4): 741–755. https://doi.org/10.1108/JBIM-11-2018-0354.
Zaghloul, R., and F. Hartman. 2003. “Construction contracts: The cost of mistrust.” Int. J. Project Manage. 21 (6): 419–424. https://doi.org/10.1016/S0263-7863(02)00082-0.
Zhang, L., S. Huang, C. Tian, and H. Guo. 2020. “How do relational contracting norms affect IPD teamwork effectiveness? A social capital perspective.” Project Manage. J. 51 (5): 538–555. https://doi.org/10.1177/8756972820911241.
Zhang, S. B., Y. F. Fu, Y. Gao, and X. D. Zheng. 2016. “Influence of trust and contract on dispute negotiation behavioral strategy in construction subcontracting.” J. Manage. Eng. 32 (4): 04016001. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000427.
Zheng, L., W. Lu, K. Chen, K. W. Chau, and Y. Niu. 2017. “Benefit sharing for BIM implementation: Tackling the moral hazard dilemma in inter-firm cooperation.” Int. J. Project Manage. 35 (3): 393–405. https://doi.org/10.1016/j.ijproman.2017.01.006.
Zollo, M., J. J. Reuer, and H. Singh. 2002. “Interorganizational routines and performance in strategic alliances.” Organ. Sci. 13 (6): 701–713. https://doi.org/10.1287/orsc.13.6.701.503.

Information & Authors

Information

Published In

Go to Journal of Management in Engineering
Journal of Management in Engineering
Volume 38Issue 3May 2022

History

Received: Aug 19, 2021
Accepted: Dec 2, 2021
Published online: Jan 31, 2022
Published in print: May 1, 2022
Discussion open until: Jun 30, 2022

Permissions

Request permissions for this article.

Authors

Affiliations

Assistant Professor, College of Management and Economics, Tianjin Univ., Tianjin 300072, PR China (corresponding author). Email: [email protected]
Postgraduate, College of Management and Economics, Tianjin Univ., Tianjin 300072, PR China. Email: [email protected]
Shuibo Zhang [email protected]
Professor, College of Management and Economics, Tianjin Univ., Tianjin 300072, PR China. Email: [email protected]
Jinyue Zhang [email protected]
Associate Professor, College of Management and Economics, Tianjin Univ., Tianjin 300072, PR China. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

  • Exploring the Relationship between CSR Reporting and Corporate Misconduct, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-5960, 40, 5, (2024).
  • Understanding the Double-Edged Sword Effect of Contract Flexibility on Contractor’s Opportunistic Behavior in Construction Project: Moderating Role of BIM Application Degree, Journal of Construction Engineering and Management, 10.1061/JCEMD4.COENG-14552, 150, 10, (2024).
  • Factors Influencing the Acceptance of BIM-Based Automated Code Compliance Checking in the AEC Industry in China, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-5344, 39, 6, (2023).
  • Performance of Chinese International Contractors in Sub-Saharan Africa: Evidence from Uganda, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-5167, 39, 3, (2023).
  • Smart Contract Implementation in Building Information Modeling–Enabled Projects: Approach to Contract Administration, Journal of Construction Engineering and Management, 10.1061/JCEMD4.COENG-13216, 149, 5, (2023).
  • Research on the BIM Application Mechanism of Engineering-Procurement-Construction Projects Based on a Tripartite Evolutionary Game, Journal of Construction Engineering and Management, 10.1061/JCEMD4.COENG-12052, 149, 3, (2023).

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share