Investigating the Critical Success Factors of Claims Management in Construction Contracts

Publication: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Volume 15, Issue 2

Abstract

Claims management is an essential process aiming to avoid, mitigate, evaluate, and handle claims that may arise for various reasons. Claims usually bring up a considerable cost burden and can be disruptive, often resulting in myriad issues ranging from delays in project completion to protracted litigation. Claims administration and management can be challenging and time consuming for all parties; however, the parties can benefit from having an effective claims management program. Therefore, it is of utmost importance to manage claims with respect to contractual items. Considering this troublesome process, there is a need to develop effective strategies for construction firms to best manage claims and their potential impacts on the contract. However, a comprehensive and up-to-date list of factors is still in need for many construction companies. To fill this gap, this study proposes a set of critical success factors to best handle the claims, avoid their devastating consequences, and better manage contractual agreements. In this respect, an in-depth literature review was conducted to determine an initial list of variables. The list was refined based on expert opinion to represent the perceptions of industry practitioners. Then a questionnaire was administered to construction professionals having broad experience in construction contract management. The variables were ranked by the respondents of the questionnaire based on the importance and success levels. Factor analysis was conducted in SPSS to categorize the variables. The main factors that arise are human related, organizational, resource related, and project related. This study provides a comprehensive, but not exhaustive, list of variables and their categorization to consider as part of an effective claims management process. The study is expected to guide both policy makers and industry practitioners in terms of reviewing their claims management strategies against potentially devastating claims and revisiting their strategies in construction contract management.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

All data, models, or code that support the findings of this study are available from the corresponding author upon reasonable request.

References

Works Cited

Aibinu, A. A. 2009. “Avoiding and mitigating delay and disruption claims conflict: Role of precontract negotiation.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 1 (1): 47–58. https://doi.org/10.1061/(ASCE)1943-4162(2009)1:1(47).
Aibinu, A. A., and G. O. Jagboro. 2002. “The effects of construction delays on project delivery in Nigerian construction industry.” Int. J. Project Manage. 20 (8): 593–599. https://doi.org/10.1016/S0263-7863(02)00028-5.
Akbari, A., A. Feili, and M. Dashtipour. 2022. “Identifying and prioritizing arising claim’s factors by the combined approach of DEMATEL and ANP method (case study: Urban development and civil organization of shiraz municipality projects).” J. Soft Comput. Civ. Eng. 6 (1): 46–65. https://doi.org/10.22115/SCCE.2022.288877.1328.
Akintoye, A. S., and M. J. MacLeod. 1997. “Risk analysis and management in construction.” Int. J. Project Manage. 15 (1): 31–38. https://doi.org/10.1016/S0263-7863(96)00035-X.
Alaloul, W. S., R. D. Wirahadikusumah, M. W. Hasaniyah, B. A. Tayeh, B. Hasiholan, and P. Kusumaningrum. 2019. “A comprehensive review of disputes prevention and resolution in construction projects.” In Vol. 270 of Proc., MATEC web of Conf., 05012. Bandung, Indonesia: EDP Sciences.
Ali, B., H. Zahoor, A. R. Nasir, A. Maqsoom, R. W. A. Khan, and K. M. Mazher. 2020. “BIM-based claims management system: A centralized information repository for extension of time claims.” Autom. Constr. 110 (Feb): 102937. https://doi.org/10.1016/j.autcon.2019.102937.
Alias, Z., E. M. A. Zawawi, K. Yusof, and N. M. Aris. 2014. “Determining critical success factors of project management practice: A conceptual framework.” Procedia-Social Behav. Sci. 153 (Oct): 61–69. https://doi.org/10.1016/j.sbspro.2014.10.041.
Asuquo, C. F., I. E. Udo, and M. Otali. 2020. “A conceptual framework for managing construction claims in the face of the COVID-19 pandemic in Nigeria.” Supplement, Int. J. Real Estate Stud. 14 (S1): 98–106.
Bakhary, N. A., H. Adnan, and A. Ibrahim. 2015. “A study of construction claim management problems in Malaysia.” Procedia Econ. Finance 23: 63–70. https://doi.org/10.1016/S2212-5671(15)00327-5.
Banihashemi, S., M. R. Hosseini, H. Golizadeh, and S. Sankaran. 2017. “Critical success factors (CSFs) for integration of sustainability into construction project management practices in developing countries.” Int. J. Project Manage. 35 (6): 1103–1119. https://doi.org/10.1016/j.ijproman.2017.01.014.
Banwo, O., K. Parker, and A. Sagoo. 2015. “Principles of contract claims management—A review of the Nigerian construction industry.” In Proc., 2015 Int. Conf. on Industrial Engineering and Operations Management (IEOM), 1–9. New York: IEEE.
Butković, L. L. 2021. “A new framework for ranking critical success factors for international construction projects.” Organ. Technol. Manage. Constr. Int. J. 13 (2): 2505–2520. https://doi.org/10.2478/otmcj-2021-0030.
Chan, A. P., and A. P. Chan. 2004. “Key performance indicators for measuring construction success.” Benchmarking: Int. J. 11 (2): 203–221. https://doi.org/10.1108/14635770410532624.
Chan, A. P. C., D. W. M. Chan, Y. H. Chiang, B. S. Tang, E. H. W. Chan, and K. S. K. Ho. 2004. “Exploring critical success factors for partnering in construction projects.” J. Constr. Eng. Manage. 130 (2): 188–198. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:2(188).
Chan, D. W. M., A. P. C. Chan, P. T. I. Lam, and J. M. W. Wong. 2010. “Identifying the critical success factors for target cost contracts in the construction industry.” J. Facil. Manage. 8 (3): 179–201. https://doi.org/10.1108/14725961011058820.
Chaphalkar, N. B., and S. K. Patil. 2012. “Decision support system for dispute resolution in construction contracts.” KSCE J. Civ. Eng. 16 (4): 499–504. https://doi.org/10.1007/s12205-012-1303-4.
Chen, W. T., and T. T. Chen. 2007. “Critical success factors for construction partnering in Taiwan.” Int. J. Project Manage. 25 (5): 475–484. https://doi.org/10.1016/j.ijproman.2006.12.003.
Cheng, E. W. L., H. Li, and P. E. D. Love. 2000. “Establishment of critical success factors for construction partnering.” J. Manage. Eng. 16 (2): 84–92. https://doi.org/10.1061/(ASCE)0742-597X(2000)16:2(84).
Chua, D. K. H., Y. C. Kog, and P. K. Loh. 1999. “Critical success factors for different project objectives.” J. Constr. Eng. Manage. 125 (3): 142–150. https://doi.org/10.1061/(ASCE)0733-9364(1999)125:3(142).
Damoah, I., A. Ayakwah, and P. Twum. 2022. “Assessing public sector road construction projects’ critical success factors in a developing economy: Definitive stakeholders’ perspective.” J. Project Manage. 7 (1): 23–34. https://doi.org/10.5267/j.jpm.2021.7.003.
Dao, T. N., and P. H. Chen. 2021. “Critical success factors and a contractual framework for construction projects adopting building information modeling in Vietnam.” Int. J. Civ. Eng. 19 (1): 85–102. https://doi.org/10.1007/s40999-020-00542-3.
Demachkieh, F., S. Khalife, M.-A. Abdul-Malak, and F. Hamzeh. 2020. “Considerations for filing global construction claims: Legal perspective.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (3): 05020003. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000393.
Elhag, T., S. Eapen, and T. Ballal. 2020. “Moderating claims and disputes through collaborative procurement.” Constr. Innovation 20 (1): 79–95. https://doi.org/10.1108/CI-02-2019-0020.
El-Saboni, M., G. Aouad, and A. Sabouni. 2009. “Electronic communication systems effects on the success of construction projects in United Arab Emirates.” Adv. Eng. Inf. 23 (1): 130–138. https://doi.org/10.1016/j.aei.2008.07.005.
ENR (Engineering News-Record). 2022. “The top 225 international contractors list.” Accessed September 6, 2022. https://www.enr.com/toplists/2021-Top-250-International-Contractors-Preview.
Enshassi, A., S. Mohamed, and S. El-Ghandour. 2009. “Problems associated with the process of claim management in Palestine: Contractors’ perspective.” Eng. Constr. Archit. Manage. 16 (1): 61–72. https://doi.org/10.1108/09699980910927895.
Field, A. 2013. Discovering statistics using IBM SPSS statistics. London: SAGE.
Gudienė, N., A. Banaitis, and N. Banaitienė. 2013. “Evaluation of critical success factors for construction projects—An empirical study in Lithuania.” Int. J. Strategic Property Manage. 17 (1): 21–31. https://doi.org/10.3846/1648715X.2013.787128.
Guévremont, M., and A. Hammad. 2021. “Ontology for linking delay claims with 4D simulation to analyze effects-causes and responsibilities.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 13 (4): 04521024. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000489.
Gunasekera, V. S., and S. C. Chong. 2018. “Knowledge management critical success factors and project management performance outcomes in major construction organisations in Sri Lanka: A case study.” VINE J. Inf. Knowledge Manage. Syst. 48 (4): 537–558. https://doi.org/10.1108/VJIKMS-06-2018-0051.
Gunduz, M., and M. Almuajebh. 2020. “Critical success factors for sustainable construction project management.” Sustainability 12 (5): 1990. https://doi.org/10.3390/su12051990.
Hair, J. F., W. C. Black, B. J. Babin, R. E. Anderson, and R. Tatham. 2006. Multivariate data analysis. Upper Saddle River, NJ: Pearson.
Hamad, R. J., B. A. Tayeh, and H. A. Al Aisri. 2021. “Critical factors affecting the success of construction projects in Oman.” J. Sustainable Archit. Civ. Eng. 29 (2): 121–138. https://doi.org/10.5755/j01.sace.29.2.29269.
Hansen, S. 2021. “Developing a model of construction contract management competency in a developing country: Quantitative approach.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 13 (4): 04521030. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000504.
Ingle, P. V., and G. Mahesh. 2020. “Construction project performance areas for Indian construction projects.” Int. J. Construct. Manage. 22 (8): 1–12. https://doi.org/10.1080/15623599.2020.1721177.
Jari, A. J., and P. P. Bhangale. 2013. “To study critical factors necessary for a successful construction project.” Int. J. Innovative Technol. Exploring Eng. 2 (5): 331–335.
Kartam, N. A., I. Flood, and P. Koushki. 2000. “Construction safety in Kuwait: Issues, procedures, problems, and recommendations.” Saf. Sci. 36 (3): 163–184. https://doi.org/10.1016/S0925-7535(00)00041-2.
Kleinbaum, D. G., L. L. Kupper, A. Nizam, and E. S. Rosenberg. 2013. Applied regression analysis and other multivariable methods. Boston: Nelson Education.
Mavi, R. K., and C. Standing. 2018. “Critical success factors of sustainable project management in construction: A fuzzy DEMATEL-ANP approach.” J. Cleaner Prod. 194 (Sep): 751–765. https://doi.org/10.1016/j.jclepro.2018.05.120.
Mohamed, H. H., A. H. Ibrahim, and A. A. Soliman. 2014. “Reducing construction disputes through effective claims management.” Am. J. Civ. Eng. Archit. 2 (6): 186–196. https://doi.org/10.12691/ajcea-2-6-2.
Mok, K. Y., G. Q. Shen, and J. Yang. 2015. “Stakeholder management studies in mega construction projects: A review and future directions.” Int. J. Project Manage. 33 (2): 446–457. https://doi.org/10.1016/j.ijproman.2014.08.007.
Nikolić, M., and A. Cerić. 2022. “Classification of key elements of construction project complexity from the contractor perspective.” Buildings 12 (5): 696. https://doi.org/10.3390/buildings12050696.
Ola-awo, W., A. Alayande, G. Olarewaju, and L. Oyewobi. 2021. “Critical success factors for effective internal construction stakeholder management in Nigeria.” Acta Structilia 28 (1): 1–31. https://doi.org/10.18820/24150487/as28i1.1.
Prasad, K. V., V. Vasugi, R. Venkatesan, and N. S. Bhat. 2019. “Critical causes of time overrun in Indian construction projects and mitigation measures.” Int. J. Constr. Educ. Res. 15 (3): 216–238. https://doi.org/10.1080/15578771.2018.1499569.
Qammaz, A. S. B., and R. Y. AlMaian. 2020. “A critical success factors model for effective implementation of risk management process in the construction projects.” J. Eng. Res. 8 (3): 50–70. https://doi.org/10.36909/jer.v8i3.7877.
Rajendran, S., B. Clarke, and R. Andrews. 2012. “Quality management in construction: An expanding role for SH&E professionals.” Prof. Saf. 57 (11): 37–42.
Shaikh, H. H., N. Y. Zainun, and S. H. Khahro. 2020. “Claims in construction projects: A comprehensive literature review.” In Vol. 498 of Proc., IOP Conf. Series: Earth and Environmental Science, 012095. Johor, Malaysia: IOP Publishing.
Shayan, S., K. Pyung Kim, and V. W. Tam. 2022. “Critical success factor analysis for effective risk management at the execution stage of a construction project.” Int. J. Construct. Manage. 22 (3): 379–386. https://doi.org/10.1080/15623599.2019.1624678.
Sobieraj, J., and D. Metelski. 2021. “Quantifying critical success factors (Csfs) in management of investment-construction projects: Insights from Bayesian model averaging.” Buildings 11 (8): 360. https://doi.org/10.3390/buildings11080360.
Teo, E. A. L., and Y. Feng. 2009. “The role of safety climate in predicting safety culture on construction sites.” Archit. Sci. Rev. 52 (1): 5–16. https://doi.org/10.3763/asre.2008.0037.
Thomas, R., and M. Wright. 2020. Construction contract claims. London: Bloomsbury.
Tsiga, Z. D., M. Emes, and A. Smith. 2016. “Critical success factors for the construction industry.” PM World J. 5 (8): 1–12.
Vidogah, W., and I. Ndekugri. 1998. “A review of the role of information technology in construction claims management.” Comput. Ind. 35 (1): 77–85. https://doi.org/10.1016/S0166-3615(97)00085-7.
Wuni, I. Y., and G. Q. Shen. 2022. “Developing critical success factors for integrating circular economy into modular construction projects in Hong Kong.” Sustainable Prod. Consumption 29 (Jan): 574–587. https://doi.org/10.1016/j.spc.2021.11.010.
Xu, H., J. Feng, and S. Li. 2014. “Users-orientated evaluation of building information model in the Chinese construction industry.” Autom. Constr. 39 (Apr): 32–46. https://doi.org/10.1016/j.autcon.2013.12.004.
Yang, J., G. Q. Shen, M. Ho, D. S. Drew, and A. P. Chan. 2009. “Exploring critical success factors for stakeholder management in construction projects.” J. Civ. Eng. Manage. 15 (4): 337–348. https://doi.org/10.3846/1392-3730.2009.15.337-348.
Yu, A. T., and G. Q. Shen. 2015. “Critical success factors of the briefing process for construction projects.” J. Manage. Eng. 31 (3): 04014045. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000242.

Information & Authors

Information

Published In

Go to Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Volume 15Issue 2May 2023

History

Received: Jul 15, 2022
Accepted: Nov 17, 2022
Published online: Dec 30, 2022
Published in print: May 1, 2023
Discussion open until: May 30, 2023

Permissions

Request permissions for this article.

Authors

Affiliations

Emine Gokce Cinko [email protected]
Master’s Student, Construction Management Program, Dept. of Civil Engineering, Gebze Technical Univ., Kocaeli 41400, Turkey. Email: [email protected]
Associate Professor, Dept. of Civil Engineering, Gebze Technical Univ., Kocaeli 41400, Turkey. ORCID: https://orcid.org/0000-0002-8627-6328. Email: [email protected]
Ph.D. Student and Research Assistant, Dept. of Civil Engineering, Gebze Technical Univ., Kocaeli 41400, Turkey. ORCID: https://orcid.org/0000-0001-8785-4882. Email: [email protected]
Assistant Professor, Construction Management Program, Univ. of Wyoming, Laramie, WY 82071 (corresponding author). ORCID: https://orcid.org/0000-0002-9190-2282. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

  • Navigating the Complexity of Dispute Management in Construction: A DEMATEL and Bayesian Network Approach, Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 10.1061/JLADAH.LADR-1143, 17, 1, (2025).
  • Automated Management of Time Extension Claims, Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 10.1061/JLADAH.LADR-1104, 16, 2, (2024).
  • Analyzing the Critical Success Factors Affecting Project Bundling Performance of Infrastructure Projects, Journal of Construction Engineering and Management, 10.1061/JCEMD4.COENG-14824, 150, 9, (2024).

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share