Layout Optimization of Prefabricated Construction Component Production Line Using Digital Twin Technology
Publication: ICCREM 2023
ABSTRACT
The high cost of prefabricated construction is one of the key factors that hinder its development, and the main reason that leads to the high cost lies in the high production cost of prefabricated components. How to rationally arrange various working areas of precast components production workshop is one of the key problems to be solved to improve the production efficiency. This study combined with the layout characteristics of the prefabricated component workshop to build a three-dimensional visualization virtual environment. The mathematical model of production facility layout in precast component workshop was established and solved by modified genetic algorithm. Through the analysis of production line layout and production conditions based on digital twin management and simulation platform, a more reasonable production line layout scheme was obtained. The application results show that the reasonable workshop layout scheme can improve the production efficiency and reduce the production cost by adjusting the operation load of each process or station.
Get full access to this article
View all available purchase options and get full access to this chapter.
REFERENCES
Braglia M., Zanon S. and Zavanella L. (2003). “Layout design in dynamic environments: Strategies and quantitative indices.” International Journal of Production Research, 41(05), 995-1016.
Wang Y.J., Sun X.D. and Liu Y.Y. (2017). “Layout Planning Optimal Design of Operations and Logistics Management L aboratory Based on SLP. “ Research and Exploration in Laboratory, 36(01), 254-258. (in Chinese).
Matai R. (2015). “Solving multi objective facility layout problem by modified simulated annealing.” Applied Mathematics and Computation, 261, 302-311.
Zhang M., Zhang G.T. and Zhang M. (2020). “Application of SLP Method in Facility Space Layout Planning by Entropy-based Optimization Model.” Journal of Xinjiang University (Natural Science Edition), 37(01), 118-126. (in Chinese).
Deng B. and Lin G.C. (2017). “Workshop Facility Layout Optimization by Using Improved SLP and Genetic Algorithm.” Modular Machine Tool & Automatic Manufacturing Technique, 08, 148-151. (in Chinese).
Xu X.M., Deng Y.Q. and Wu Q.P. (2020). “Research on Layout Optimization of SY Company Based on SLP and Particle Swarm Algorithm.” Mechanical & Electrical Engineering Technology, 49(02), 17-20. (in Chinese).
Wang Y.L., Wang C. and Han Y., et al. (2015). “Intelligent Layout Optimization Design of Ship Pipe.” Journal of Shanghai Jiaotong University, 49(04), 513-518. (in Chinese).
Information & Authors
Information
Published In
History
Published online: Nov 30, 2023
ASCE Technical Topics:
- Algorithms
- Benefit cost ratios
- Business management
- Computer vision and image processing
- Construction costs
- Construction engineering
- Construction industry
- Construction management
- Engineering fundamentals
- Financial management
- Mathematical models
- Mathematics
- Methodology (by type)
- Models (by type)
- Offsite construction
- Practice and Profession
- Project management
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.