Research on Optimization of Tower Crane Selection Scheme for Prefabricated Building Based on Value Engineering
Publication: ICCREM 2023
ABSTRACT
With the continuous scale of prefabricated buildings, which requires multiple tower cranes to complete the lifting task. The selection of tower cranes is restricted by many factors. This paper first through literature and actual research, to establish the assembly type tower crane selection program process, analysis of the advantages and disadvantages of different types of tower cranes and the scope of application, combined with the actual situation of the project to determine the type of tower crane; then analyze the influence factors of tower crane selection for preliminary selection plan determination, and finally establish a value engineering model to compare the value coefficient to determine the final selection plan. The validity of the method is verified through actual cases, which not only takes into account the construction characteristics of assembled buildings, but also makes cost optimization on the basis of ensuring functionality, and provides a scientific decision basis for tower crane selection.
Get full access to this article
View all available purchase options and get full access to this chapter.
REFERENCES
Alshibani, A., Elassir, H., Al-Najjar, M., and Hamida, H. (2019). “AHP based approach for crane selection of building construction in Saudi Arabia: A case study.” Proceedings of the Annual Conference: Canadian Society for Civil Engineering, Montreal, QC, Canada, 12-15.
Chen, L., Che, Y., Bao, X.C., and Li, J.Y. (2020). “Analysis of influencing factors of type selection and layout of tower crane.” Construction Technique, 49(16), 117-120. (in Chinese).
Chen, S.H., Li, J., and Chen, X.Z. (2022). “Research on optimization of architectural facade design scheme based on value engineering.” Fujian Architecture & Construction, (03), 29-32. (in Chinese).
El-Tourkey, M., Alshibani, A., Mohammed, A., Shash, A., and Tuffaha, F. (2022). “An integrated decision support system for mobile crane selection.” Expert Systems with Applications, 189, 116053.
Fu, Y., Li, R.Y., Liu, G.W., Xu, P.P., and Mao, C. (2019). “Technical and economic research of tower Crane based on value engineering.” Journal of Engineering Management, 33(04), 117-121. (in Chinese).
Hussein, M., and Zayed, T. (2020). “Crane operations and planning in modular integrated construction: Mixed review of literature.” Automation in Construction, 122, 103466.
Ji, X., Shen P., Shen, L.P., Ling, Y., and Lu, X. (2019). “Relationship between unit division of assembled monolithic prefabricated component in residential engineering and selection of tower crane.” Building Technology, 3(05), 45-48+60. (in Chinese).
Li, N. (2021). Research on the Selection and Layout Optimization of Hoisting Machinery for Prefabricated Building Construction. Nanjing Forestry University, Nanjing, China, 1-52. (in Chinese).
Li, N., and Li, X.S. (2020). “Research on type selection of prefabricated construction crane.” Construction Technology, 51(05), 546-549. (in Chinese).
Li, R.Y. (2020). Study on Layout Optimization of Prefabricated Tower Crane. Chongqing University, Chongqing, China, 1-135. (in Chinese).
Lin, J.J. (2021). “Study on Layout Optimization of prefabricated twin tower Cranes.” Chongqing University. (in Chinese).
Liu, M., Huang, C., Wang, J.J., Wang, W.Q., and Zhang, R. (2020). “Selection and layout optimization of tower crane based on mixed integer linear programming.”Journal of Engineering and Management, 37(02), 142-150. (in Chinese).
Liu, P.P. (2016). Study on Construction Cost of Multiple Tower Crane Layout Scheme. Shandong Jianzhu University, Jinan, China, 1-52. (in Chinese).
Marzouk, M., and Abubakr, A. (2016). “Decision support for tower crane selection with building information models and genetic algorithms.” Automation in Construction, 61, 1-15.
Song, Y.G. (2018). “Selection of tower crane for erection and construction of prefabricated concrete structure.” Construction Technology, 49(S1), 41-43. (in Chinese).
Sun, Y.B., Sun, S.H., Li, C.G., Yang, Y.F., Ma, T.L., and Yan, M.W. (2017). “Research on construction technology of tower crane for prefabricated concrete structure.” Construction Technology, 48(08), 809-811. (in Chinese).
Wang, R.D., Zayed, T., Pan, W., Zheng, S., and Tariq, S. (2021). “A system boundary-based critical review on crane selection in building construction.” Automation in Construction, 123, 103520.
Xiang, H., Wu, Y.K., Ma, Q.J., Zhang, H., and Han, L.X. (2017). “Space positioning and selection of tower crane based on BIM technology.” Construction Technique, 46(S2), 1236-1239. (in Chinese).
Zhang, Z., and Pan, W. (2021). “Multi-criteria decision analysis for tower crane layout planning in high-rise modular integrated construction.” Automation in Construction, 127, 103709.
Information & Authors
Information
Published In
History
Published online: Nov 30, 2023
ASCE Technical Topics:
- Bibliographies
- Buildings
- Construction engineering
- Construction equipment
- Construction industry
- Construction management
- Construction methods
- Cranes
- Engineering fundamentals
- Equipment and machinery
- Information management
- Offsite construction
- Project management
- Structural engineering
- Structures (by type)
- Value engineering
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.