ABSTRACT

This study investigates the increasing risks faced by engineering procurement construction (EPC) projects due to their expanding scale and growing technical complexity. With a focus on the general contractor’s viewpoint, a comprehensive literature review is conducted to enhance risk management in EPC contracts. Utilizing the risk chain theory as a foundation, the Delphi method is employed to identify potential risks. Building upon this analysis, a risk chain model specifically tailored for housing EPC projects is developed using structural equation modeling (SEM). Through this approach, 10 critical risk chains for general contractors are identified and summarized, offering practical guidance for effectively mitigating risks.

Get full access to this article

View all available purchase options and get full access to this chapter.

REFERENCES

Chen, Y., and Yang, B.C. (2010). “Research on EPC project bidding decision based on fuzzy risk evaluation.” Journal of Northwest Agriculture and Forestry University of Science and Technology (Social Science Edition), 11(04), 72-77. (in Chinese).
Chen, J.S. (2020). “A practical guide to risk management in EPC projects.” Machinery Industry Press, Beijing. (in Chinese).
Nasir, D., McCabe, B., and Hartono, L. (2003). “Evaluating risk in the construction-schedule model (ERIC-S): Construction schedule risk model.” Journal of Construction Engineering and Management-Asce, 129(5), 518-527.
Dang, J.J. (2009). “Strengthening project cost management of construction enterprises to improve enterprise economic efficiency.” Science and Technology Information, 192(15), 171. (in Chinese).
Fang, Y. (2021). Identification and Evaluation of Safety Risk in Real Estate Project Construction. Anhui University of Construction, Anhui, China, 1-64. (in Chinese).
Gong, W.J. (2020). Research on Cost Risks of General Contractors under EPC Model. Yangzhou University, Yangzhou, China, 1-78. (in Chinese).
Hu, Z.D., Tang, S., and Yang, M.J. (2021). “Risk evaluation of BIM technology application in EPC projects.” Engineering Economics, 31(04), 68-73. (in Chinese).
Jiang, Y. (2021). “Analysis of execution risk and countermeasures for high-rise building projects.” Jiangxi Building Materials, 270(07), 123-124 (in Chinese).
Leng, X.Y. (2021). “Introduction to cost overrun risk management in general contracting projects.” Nonferrous Equipment, 198(01), 84-86. (in Chinese).
Li, J.X. (2021). “Cost risk management of EPC projects.” Engineering Construction and Design, 458(12), 204-205+208. (in Chinese).
Li, Y. (2014). “Risk management of engineering changes and claims.” Journal of Shanxi University of Finance and Economics, 36(S1), 77. (in Chinese).
Liang, Z.F. (2010). Chain Risk Analysis and Assessment of Investment Construction Project Clusters and Its Simulation Research. Wuhan University, Wuhan, China. (in Chinese).
Liu, J.C., Chen, Q., and Zhao, Q.W. (2020). “Research on key measures for safety management of assembled building construction.” Project Management Technology, 18(04), 130-134. (in Chinese).
Liu, Y., and Yang, Z.X. (2020). “Comparative study on risk factors of domestic and foreign engineering construction EPC mode.” Construction Economics, 41(S2), 132-135. (in Chinese).
Lou, H.J. (2010). “Identification of risk factors in international EPC projects.” Concrete and Cement Products, 176(06), 18-21. (in Chinese).
Lu, Q.Y. (2016). Research and Establishment of a Functional Department Performance Evaluation Index System in a Tertiary Hospital. Beijing University of Traditional Chinese Medicine, Beijing, China. (in Chinese).
National Bureau of Statistics of the People’s Republic of China. (2021). China Statistical Yearbook 2021 in English and Chinese. China Statistics Press, Beijing, (in Chinese).
Oekmen, O., and Oeztas, A. (2008). “Construction Project Network Evaluation with Correlated Schedule Risk Analysis Model.” Journal of Construction Engineering & Management, 134(1), 49-63.
Preacher, K.J., and Hayes, A.F. (2008). “Asymptotic and resampling strategies for assessing and comparing indirect effects in multiple mediator models.” Behavior research methods, 40(3), 879-91.
Qiu, J.P. (2021). Research on Design Risk Management of a Medical University Project under EPC Model. Lanzhou Jiaotong University, Lanzhou, China. (in Chinese).
Shen, T., Nagai, Y., and Gao, C. (2019). “Design of building construction safety prediction model based on optimized BP neural network algorithm.” Soft Computing, 24(11), 7839-7850.
Shen, Y., and Tang, D.S. (2017). “Risk analysis and management of overseas power EPC turnkey projects.” Enterprise Management, (S1), 124-125. (in Chinese).
Song, S.X. (2016). Research on Risk Management of PPP Projects Based on Construction Enterprise Participants. Shanghai Jiaotong University, Shanghai, China. (in Chinese).
Su, Z.J., Yang, Z., and Shi, J. (2010). “Cost overrun risk analysis and response for international EPC project materials.” International Economic Cooperation, 293(05), 48-52. (in Chinese).
Sun, P. (2013). “Cost risk assessment model for EPC turnkey projects.” Science and Technology Perspectives, (03), 67-68. (in Chinese).
Tang, X. (2021). “Safety Risk Management Strategy for High-rise Housing Construction.” Engineering Construction and Design, 467(21), 228-230. (in Chinese).
Wang, J.Q. (2017). Schedule Risk Management of Construction General Contractors. University of Science and Technology Suzhou, Suzhou, China. (in Chinese).
Wang, Z.H. (2020). Risk Management for General Contractors under EPC Model. Tianjin University of Science and Technology, Tianjin, China. (in Chinese).
Wu, M.L. (2010). Operation and application of structural equation modeling AMOS, Chongqing University Press, Chongqing (in Chinese).
Xiong, J.X., Song, X.Q., and Bo, Y.M. (2021). “Construction of evaluation index system for sustainable development of medical association–Based on Delphi method.” Health Economics Research, 38(03), 59-62. (in Chinese).
Yu, H.L., and Chen, J.L. (2021). “SEM-based risk chain study of green building projects under EPC model.” Science and Technology Management Research, 41(17), 199-205. (in Chinese).
Yu, J.H. (2021). “Introduction to project construction data management using system thinking in the information age.” Zhujiang Water Transport, 537(17), 95-96. (in Chinese).
Yuan, M.G. (2019). “Research on risk analysis and claim strategy of highway projects under EPC contract model.” Construction Technology Development, 46(17), 116-117. (in Chinese).
Zeng, H., Geng, H., and Li, H. (2013). Engineering project risk management. China Construction Industry Press, Beijing. (in Chinese).
Zhang, G.T. (2013). Research on Contract Risk Management of General Contracting Enterprises. Dalian University of Technolog, Dalian, China. (in Chinese).
Zhang, J.X., and Guo, H.F. (2020). “Study on the risk of EPC general contracting water conservancy project contract led by design enterprises - Based on set-pair analysis method.” Construction Economics, 41(S2), 136-139. (in Chinese).
Zhang, K.S. (2011). Study on Risk Management of Domestic EPC Mode Consortium General Contractor. Southwest Jiaotong University, Chengdu, China. (in Chinese).
Zhang, W., Zhu, S., Zhang, X., and Zhao, T. (2020). “Identification of critical causes of construction accidents in China using a model based on system thinking and case analysis.” Safety Science, 121(C), 606-618.
Zhao, H.Q. (2007). “Discussion on construction coordination of general contracting unit.” Shanxi Architecture, 290(05), 210-211. (in Chinese).
Zhao, Q.W. (2013). “Study on the risk management of metro based on the construction general contracting model. Journal of Railway Engineering, 30(07), 100-105. (in Chinese).
Zhao, Y.J., Sun, C.L., Fu, R.X., and Liu, Y.C. (2021). “Cost overrun risk evaluation of epc metro projects based on interaction matrix.” Project Management Technology, 19(12), 29-33. (in Chinese).
Zhao, Y.M. (2009). Research on Risk Management of Communication Construction Projects Under EPC Model. Beijing University of Posts and Telecommunications, Beijing, China. (in Chinese).
Zhao, Z., Zhang, M., and Zheng, L.J. (2019). “Risk network analysis of EPC projects based on ISM model.” Friends of Accounting, 620(20), 147-152. (in Chinese).
Zhu, J.X. (2019). “Research on the application of risk matrix in construction potential quality defect risk management (TIS) service.” Housing and Real Estate, 537(15), 11-12. (in Chinese).

Information & Authors

Information

Published In

Go to ICCREM 2023
ICCREM 2023
Pages: 923 - 937

History

Published online: Nov 30, 2023

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Hongliang Yu [email protected]
Professor, Zhejiang Univ. College of Civil Engineering and Architecture, Hangzhou, China. Email: [email protected]
Zhejiang Univ. College of Civil Engineering and Architecture, Hangzhou, China. Email: [email protected]
Quanbiao Xu [email protected]
Professor, Architectural Design and Research Institute of Zhejiang Univ. Co., Ltd., Hangzhou, China (corresponding author). Email: [email protected]
Professor, Architectural Design and Research Institute of Zhejiang Univ. Co., Ltd., Hangzhou, China. Email: [email protected]
Jingjing Wang [email protected]
Professor, Architectural Design and Research Institute of Zhejiang Univ. Co., Ltd., Hangzhou, China. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$242.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$242.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share