Chapter
Dec 15, 2022

Research on Key Factors of Cost of Prefabricated Building EPC Project Based on SNA

Publication: ICCREM 2022

ABSTRACT

From the perspective of the whole process cost of the assembly project, considering the front and integration characteristics of the key aspects of the project under the EPC model, a list of factors for cost control for prefabricated building EPC projects is established from four dimensions including design, procurement, construction, information technology, and environment. And then based on the social network analysis (SNA) method a cost factor network model is constructed, and quantitative analysis for cost factors is implemented from the point of network integrity and node centrality. Empirical research shows that this method reveals the invisible coupling relationship between the cost factors of prefabricated building EPC projects, which quantifying influencing factor characteristics and effectively identifying key elements. The research results can be used as a reference for the cost control of prefabricated building EPC projects.

Get full access to this article

View all available purchase options and get full access to this chapter.

REFERENCES

Jeffrey, M., and Barral, D. L. (2016). “A construction procurement method to achieve sustainability in modular construction.” Procedia Engineering, 145, 1362–1369.
Khodeir, L. M., and Ghandour, A. E. (2019). “Examining the role of value management in controlling cost overrun application on residential construction projects in Egypt.” Ain Shams Engineering Journal, 10(3), 121–130.
Liu, G. Q., Qi, Y., and Ji, Y. B. (2019). “Identification and evaluation of factors affecting the construction cost of prefabricated buildings under EPC mode research on price standards.” Construction Economy, 4005, 86–92. (in Chinese).
Liu, H., and Feng, X. (2021). “Research on the key influencing factors of private capital participation in PPP projects-based on the perspective of SNA.” Accounting Friends, (10), 81–85. (in Chinese).
Memon, I., Abdul, R., and Abdullah, M. (2010). “Factors affecting construction cost in mara large construction project: Perspective of project management consultant.” International Journal of Sustainable Construction Engineering & Technology, 1, 41–54.
Qu, X. X., and Guo, Y. B. (2021). “Analysis of influencing factors of project cultural differences based on SNA method.” Engineering Construction, 53(01), 1–6. (in Chinese).
Zeng, X. (2020a). “Cost management measures for EPC engineering general contracting projects.” China Collective Economy, (36), 33–35. (in Chinese).
Zeng, X. Z. (2020b). “Cost management risks and countermeasures of housing construction EPC projects.” Policy Research & Exploration, (05), 40. (in Chinese).
Zhang, J. S., and Jiang, Y. L. (2021). “Research on influencing factors of worker management of prefabricated projects based on SNA.” Project Management Technology, 19(10), 28–32. (in Chinese).

Information & Authors

Information

Published In

Go to ICCREM 2022
ICCREM 2022
Pages: 382 - 390

History

Published online: Dec 15, 2022

Permissions

Request permissions for this article.

Authors

Affiliations

Tiankang Deng [email protected]
1Postgraduate, School of Civil Engineering and Architecture, Wuhan Univ. of Technology, Wuhan, China. Email: [email protected]
Xiangzhong Tang [email protected]
2Associate Professor, School of Civil Engineering and Architecture, Wuhan Univ. of Technology, Wuhan, China. Email: [email protected]
Liying Wang [email protected]
3Postgraduate, School of Civil Engineering and Architecture, Wuhan Univ. of Technology, Wuhan, China. Email: [email protected]
Zhipeng Gao [email protected]
4Senior Economist, China Construction Seventh Engineering Bureau, Wuhan, China. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$190.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$190.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share