Research on Improving the Integrity of Joints in Prefabricated Building Components
Publication: ICCREM 2022
ABSTRACT
Under the background of China’s green development and dual-carbon strategy, someone has rapidly promoted prefabricated buildings. Prefabricated building has the advantages of short construction period, energy saving and emission reduction, noise reduction, green construction, and so on. Therefore, the assembly rate increases year by year, but the integrity of the joints cannot be guaranteed, which indirectly reduces the thermal insulation and sound insulation performance of the building, and may even reduce the seismic performance, so it is very important to control the joint connection of the prefabricated building. In this paper, dry connection and wet connection are studied and analyzed. From the point of view of green construction, the weight of each index is calculated by the AHP method, and finally the connection mode is selected for different construction conditions.
Get full access to this article
View all available purchase options and get full access to this chapter.
REFERENCES
Cai, S. H., Zhang, Z. Y., Zhang, P., Zhu, D., and Zheng, F. S. (2009). “Priority decision model of small reservoirs reinforcing project based on AHP-TOPSIS.” Journal of Yangzhou University (Natural Science Edition), 12(01), 71–75. (in Chinese).
Deng, X., Li, J. M., Zeng, H. J., Chen, J. Y., and Zhao, J. F. (2012). “Research on computation methods of AHP weight vector and its applications.” Mathematics in Practice and Theory, 42(7), 93–100. (in Chinese).
Jiang, B. Y., and Liu, S. Y. (2020). “The study of BIM technology applications in green prefabricated buildings.” Journal of Human Settlements in West China, 35(06), 10–16. (in Chinese).
Lacerda, M. M. S., Silva, T. J. D., Alva, G. M. S., and Lima, M. C. V. D. (2018). “Influence of the vertical grouting in the interface between corbel and beam in beam-to-column connections of precast concrete structures: An experimental analysis.” Engineering Structures, 172, 201–213.
Li, H. X., Zhang, P., and Zhang, Y. (2019). “Summary of research on wet connection mode of prefabricated building joints.” Science and Technology Wind, (06), 97–98. (in Chinese).
Liu, H. T., Yan, Q. S., and Du, X. L. (2017). “Study of seismic performance of reinforced concrete frame beam-column joints connected with grouted sleeves.” Journal of Building Structures, 38(09), 54–61. (in Chinese).
Ou, T. A., Pan, R. W., and He, Z. (2019). “Dry connection technology and prospect of prefabricated concrete frame structure.” Development Guide to Building Materials, 17(24), 57–60. (in Chinese).
Wang, F., Zhang, M., Chen, J., and Lian, R. (2020). “Study on dry-wet connection method of prefabricated beam-column joints.” Create Living, (06), 84–85. (in Chinese).
Wang, W. L. (2018). “Joint connection mode of prefabricated building structure.” Scientific and Technological Innovation, (25), 129–130. (in Chinese).
Wei, H. L. (2020). “Design practice and problems of prefabricated building.” Construction & Design for Engineering, (24), 10–11. (in Chinese).
Wu, D. (2016). “Summary of the research on the connection mode of the assembled building node.” Chinese & Overseas Architecture, (08), 150–151. (in Chinese).
Information & Authors
Information
Published In
History
Published online: Dec 15, 2022
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.