Enabling Faster Project Delivery through Use of Construction-Driven Designs

Publication: Construction Research Congress 2022

ABSTRACT

The constant pressure to deliver emergency projects (e.g., emergency rebuild due to natural disasters) and non-emergency projects (e.g., first to market) at a faster rate requires flash tracking, delivery approach characterized by a heightened concurrency between the project phases and the involvement of the key upstream and downstream stakeholders early in the planning and design process. To enable flash tracking, the construction-driven design has evolved as a program delivery process that integrates the building approach with the design process where the contractor has the primary authority over the design approach. In addition to the contractor, the involvement of key project stakeholders such as major subcontractors, major equipment vendors, suppliers, and operations and maintenance personnel, early in the design process becomes essential for the construction-driven design and overall project success. Large domestic and global construction and design firms have been using this approach to facilitate faster project delivery and achieve cost savings. Through use of qualitative research methodologies, this paper defines construction-driven designs, describes its characteristics, and identifies the steps required for successful development and execution of the construction-driven-designs. It assesses the preferred timing and the level of involvement of the key stakeholders in the design and discusses stakeholder experience requirements. Additionally, this paper discusses recent project successes using construction-driven approach such as Tappan-Zee Bridge and St. Anthony Falls Bridge. Ultimately, this research will provide guidelines to owners and contractors wishing to use the construction-driven approach to deliver projects at a faster rate.

Get full access to this article

View all available purchase options and get full access to this chapter.

REFERENCES

Austin, R. B., Pishdad-Bozorgi, P., and de la Garza, J. M. (2016a). “Identifying and Prioritizing Best Practices to Achieve Flash Track Projects.” Journal of Construction Engineering and Management, 142(2), 4015077.
Austin, R. B., Pishdad-Bozorgi, P., and de la Garza, J. M. (2016b). “Successful Delivery of Flash Track Projects.”, Construction Industry Institute, Austin, TX.
Berger, J. (2014). “Skeleton of Tappan Zee Bridge’s Successor Begins to Surface in the Hudson.” The New York Times, <https://www.nytimes.com/2014/09/19/nyregion/new-tappan-zee-bridge-begins-to-take-shape-in-new-york.html>(Apr. 18, 2019).
Berger, J. (2016). “Milestone for New Tappan Zee Bridge: It’s Halfway Done.” The New York Times, <https://www.nytimes.com/2016/08/04/nyregion/tappan-zee-bridge-project-reaches-halfway-point.html>(Apr. 18, 2019).
Berger, J. (2017). “The End for the Tappan Zee Bridge Comes in Pieces, Not With a Boom.” The New York Times, <https://www.nytimes.com/2017/12/25/nyregion/tappan-zee-bridge-new-york-hudson.html>(Apr. 18, 2019).
CII (Construction Industry Institute). (1998). “Reforming Owner, Contractor, Supplier Relationships: A Project Delivery System to Otimize Supplier Roles in EPC Projects.”, Austin, TX.
DeHaven, T. (2009). “Design and Construction of St. Anthony Falls Bridge (I-35),“ Post Tensioning Institute Technical Conferences, Portland, OR, May 4-5, 1–55.
de la Garza, J. M., and Pishdad-Bozorgi, P. (2018). “Workflow Process Model for Flash Track Projects.” Journal of Construction Engineering and Management, 144(6), 1–6.
ENR (Engineering News Record). (2012). “Fluor-Led Venture Wins $3.14B Bid for New Tappan Zee Bridge.” <https://www.enr.com/articles/5298-fluor-led-venture-wins-314b-bid-for-new-tappan-zee-bridge>(Feb. 8, 2018).
Gransberg, D. D. (2013). “Early Contractor Design Involvement to Expedite Delivery of Emergency Highway Projects: Case Studies from Six States.” Transportation Research Record: Journal of the Transportation Research Board, 2347, 19–26.
LaViolette, M. D. (2014). “Tappan Zee Hudson River Crossing.”, (Oct. 2014), 27-29.
Pishdad-Bozorgi, P., Austin, R. B., and de la Garza, J. M. (2016). “Flash Track Practices Distilled via Structured Interviews from EPC Projects.” Construction Reserch Congress, ASCE, Reston, VA, 168–178.
Sofge, E. (2009). “5 Engineering Lessons From the New, Reopened Minnesota Bridge.” Popular Mechanics, <https://www.popularmechanics.com/science/a12507/4285220/>(Mar. 10, 2018).
Song, L., Mohamed, Y., and AbouRizk, S. M. (2009). “Early Contractor Involvement in Design and Its Impact on Construction Schedule Performance.” Journal of Management in Engineering, 25(1), 12–20.

Information & Authors

Information

Published In

Go to Construction Research Congress 2022
Construction Research Congress 2022
Pages: 169 - 178

History

Published online: Mar 7, 2022

Permissions

Request permissions for this article.

Authors

Affiliations

Aleksandra Markovic Graff [email protected]
1Pulte Homes Professor of Practice, Dept. of Building Construction, Virginia Polytechnic Institute and State Univ., Blacksburg, VA. Email: [email protected]
Jesus M. de la Garza [email protected]
2Department Chair, Glenn Dept. of Civil Engineering, Clemson Univ., Clemson, SC. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$226.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$226.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share