Delay in Reconstruction Projects: Analysis of Highly Damaged versus Minimally Damaged Infrastructure
Publication: International Conference on Transportation and Development 2021
ABSTRACT
The increased number and intensity of extreme events means that transport infrastructure (FRSs) is being affected more often. The chaotic and dynamic nature of a post-disaster environment leads to serious time delays in their reconstruction, and this research aims to determine the key factors that contribute to the delays, as well as to classify them as highly or minimally damaged systems. A structured survey that consisted of identified potential FRSs was designed and distributed to professionals who were involved in completing similar reconstruction projects. After collecting and analyzing the data, the results revealed that effective coordination is critical to complete a project with minimum schedule delays in both highly and minimally damaged reconstruction projects. The results also demonstrated that ineffective information management as well as ineffective logistics management cause serious delays in reconstruction of transport infrastructure after disasters. The results clearly showed that when the transportation infrastructure experiences minimum damage, less traffic disruption usually occurs through reconstruction procedure compared with highly damaged reconstruction projects. The outcomes of this study can help project managers effectively manage the timeline of a reconstruction project and substantially mitigate delays.
Get full access to this article
View all available purchase options and get full access to this chapter.
REFERENCES
Almufti, I., and Willford, M. (2013). REDi™ rating system: Resilience-based earthquake design initiative for the next generation of buildings.
Chang, Y., Wilkinson, S., and Brunsdon, D. (2011). “An integrated approach: managing resources for post-disaster reconstruction.” Dis. 35(4), 739–65.
Choudhary, M. A., and Mehmood, K. (2013). “Causes of Success and Failure of Post Disaster Reconstruction Projects–A Case Study of Post 2005 Earthquake in Northern Pakistan.” Planet@Risk, 1(1).
Davis, K. (2016). “A method to measure success dimensions relating to individual stakeholder groups.” Int. J. Pro. Manage. 34(3), 480-493.
Freeman, P. K. (2007). “Allocation of post-disaster reconstruction financing to housing.” Build. Res. Inf. 32(5), 37–41.
Habibi, M., Kermanshachi, S., and Safapour, E. (2018). “Engineering, procurement and construction cost and schedule performance leading indicators: state-of-the-art review.” Pro. Construction Research Congress (CRC), 2018.
Habibi, M., Kermanshachi, S., and Rouhanizadeh, B. (2019). “Identifying and Measuring Engineering, Procurement, and Construction (EPC) Key Performance Indicators and Management Strategies.” Inf. 4(2), p.14.
Hidayat, B., and Egbu, C. (2010). “A literature review of the role of project management in post-disaster reconstruction.” Pro. 26th Annual ARCOM Conference, Association of Researchers in Construction Management, Leeds.
Ika, L. A., Diallo, A., and Thuillier, D. (2012). “Critical success factors for World Bank projects: An empirical investigation.” Int. J. Pro. Manage. 30(1), 105–116.
Jha, A. K., and Duyne, J. E. (2010). Safer homes, stronger communities: A handbook for reconstructing after natural disasters. World Bank Publications.
King, A., Middleton, D., Brown, C., Johnson, D., and Johal, S. (2014). “Insurance: Its role in recovery from the 2010-2011 Canterbury Earthquake Sequence.” Ear. Spe. 30(1), 475-491.
Mallela, J., and Sadasivam, S. (2011). Work zone road user costs— Concepts and applications. Federal Highway Administration, U.S. Dept. of Transportation, Washington, DC, 2011.
Nipa, T. J., and Kermanshachi, S. (2020). “Identification of the Resilience Dimensions and Determination of their Relationships in Critical Transportation Infrastructures.” Pro. ASCE Construction Research Congress (CRC), Arizona, US, March 8-10, 2020.
Pamidimukkala, A., Kermanshachi, S., and Karthick, S. (2020). “Impact of Natural Disasters on Construction Projects: Strategies to Prevent Cost and Schedule Overruns in Reconstruction projects.” Pro. Creative Construction Conference (CCC), June 28-July 1, 2020.
Pamidimukkala, A., Kermanshachi, S., and Safapour, E. (2020). “Challenges in Post-Disaster Housing Reconstruction: Analysis of Urban Vs. Rural Communities.” Pro. Creative Construction Conference (CCC), June 28-July 1, 2020.
Rouhanizadeh, B., and Kermanshachi, S. (2020). “Reconstruction of Critical and Interdependent Infrastructures due to Catastrophic Natural Disasters: Lessons Learned,” Pro. ASCE Construction Research Congress (CRC), Arizona, US, March 8-10, 2020.
Rouhanizadeh, B., and Kermanshachi, S. (2020). “Post-Disaster Reconstruction of Transportation Infrastructures: Lessons Learned.” Sus. Cit. Soc. 63, 102505. https://doi.org/10.1016/j.scs.2020.102505.
Rouhanizadeh, B., Kermanshachi, S., and Dhamangaonkar, V. (2019). “Identification and Categorization of Policy and Legal Barriers to Long-Term Timely Post-Disaster Reconstruction,” J. Leg. Aff. Dis. Res. Eng. Con. 11(3):04519014.
Safapour, Elnaz. (2020). A Decision-Support System for Success of Post-Hurricane Reconstruction of Transportation Infrastructures. Doctoral Dissertation, University of Texas at Arlington, September 2020.
Safapour, E., and Kermanshachi, S. (2019). “Investigation of the Challenges and Their Best Practices for Post-Disaster Reconstruction Safety: Educational Approach for Construction Hazards.” Pro. Transportation Research Board 99th Annual Conference, Washington D.C., 2019 (No. 20-05161).
Safapour, E., and Kermanshachi, S. (2020). “Identification and Categorization of Factors Affecting Duration of Post-Disaster Reconstruction of Interdependent Transportation Systems.” Pro. ASCE Construction Research Congress (CRC), Arizona, US, March 8-10, 2020.
Safapour, E., Kermanshachi, S., and Nipa, T. J. (2020). “Schedule Performance Analysis of Infrastructure Reconstruction Projects Due to Extreme Events.” Pro. Creative Construction Conference (CCC), June 28-July 1, 2020.
Safapour, E., Kermanshachi, S., and Nipa, T. J. (2020). “A Damaged-Based Analysis of Rework in Reconstruction of Infrastructure Projects Due to Natural Disasters.” Pro. Creative Construction Conference (CCC), June 28-July 1, 2020.
Safapour, E., Kermanshachi, S., and Nipa, T. J. (2020). “Analysis of Cost performance Indicators in Reconstruction Projects: A Comparative Study of Low Vs High Level Damages.” Pro. Creative Construction Conference (CCC), June 28-July 1, 2020.
Silva, S. K., Warnakulasuriya, B. N. F., and Arachchige, B. J. H. (2019). “A Scale for Measuring Perceived Construction Project Success–Sri Lankan Perspective.” Stu. Bus. Eco. 14(1), 245-258.
Viswanathan, S. K., Tripathi, K. K., and Jha, K. N. (2019). “Influence of risk mitigation measures on international construction project success criteria–a survey of Indian experiences.” Con. Manage. Eco. 1-16.
Information & Authors
Information
Published In
Copyright
© 2021 American Society of Civil Engineers.
History
Published online: Jun 4, 2021
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.
Cited by
- Behzad Rouhanizadeh, Sharareh Kermanshachi, Investigation of Causal Relationships among Factors Affecting Post-Disaster Reconstruction Process: Adoption of Social Network Analysis (SNA) Method, Construction Research Congress 2022, 10.1061/9780784483954.008, (69-79), (2022).
- Elnaz Safapour, Sharareh Kermanshachi, Key Components in Schedule Development of Post-Disaster Reconstruction Projects, Construction Research Congress 2022, 10.1061/9780784483954.006, (48-56), (2022).