International Conference on Construction and Real Estate Management 2020
Study on Reasonable Investment Income Interval of Sewage Treatment PPP Projects
Publication: ICCREM 2020: Intelligent Construction and Sustainable Buildings
ABSTRACT
Aiming at the problems of social capital in PPP projects, such as many factors affecting investment returns, low level of investment returns, and high investment risk, and this paper takes sewage treatment PPP projects as the research object. Through analyzing the influencing factors of social capital investment return, chooses capital asset pricing theory (CAPM) as the research method, and combines weighted average capital cost method (WACC) to construct a calculation model of reasonable investment income interval of sewage treatment PPP project. What’s more, this paper further utilizes these wage treatment industry economy economic data to measure the reasonable investment income range of PPP projects. The application of this model reduces the risk of project investment and provides a reference for the calculation of reasonable investment return interval of other types of PPP projects.
Get full access to this article
View all available purchase options and get full access to this chapter.
REFERENCES
Chen, W.J. (2016). Research on Government Guarantee Level of Infrastructure PPP Project. Hunan University, Hunan, China. (in Chinese).
Jiang, Z.L., Liao, J.Y. and Peng, Z.X. (2018). “Study on the determination and adjustment decision-making of reasonable income of highway PPP project.” Highway Engineering, 43(1), 240-243. (in Chinese).
Lan, F. (2010). Benchmark Return Rate of Reclaimed Water Industry Based on WACC and Fama-French Three-factor Model. Xi’an University of Architecture and Technology, Shanxi, China. (in Chinese).
Qiu, Q.L., Jian, Y.H. and Bian, L.M. (2014). “Study on government subsidies for water BOT project from the perspective of risk.” Journal of Wuhan University of Technology, 38(2), 465-468. (in Chinese).
Shahaboddin, S., Dalibor, P. and Nor, B.A. and Abdullah, G. (2014). “Adaptive neuro-fuzzy generalization of wind turbine wake added turbulence models.” Renewable and Sustainable Energy Reviews, 36(1), 270-276.
Wang, H.Q., Li, H. and Cheng, M. (2015). “Pricing research on PPP project of public infrastructure-application of pricing model based on sewage treatment project.” Price Theory and Practice, (11), 141-143. (in Chinese).
Wang, J.B. and Wang, S.J. (2014). “Study on benchmark return rate of coal-water slurry industry based on CAPM model.” Friends of Accounting, (6), 71-75. (in Chinese).
Wang, J.N. (2018). Study on the Fiscal Subsidy Policy of Reasonable Return on PPP Project Investment in Water Industry. Central University of Finance and Economics, Beijing, China. (in Chinese).
Zhang, C.M. (2013). Research on Automated Stock Exchange Based on Arbitrage Pricing. Tianjin University, Tianjin, China. (in Chinese).
Information & Authors
Information
Published In
ICCREM 2020: Intelligent Construction and Sustainable Buildings
Pages: 513 - 521
Editors: Yaowu Wang, Ph.D., Harbin Institute of Technology, Thomas Olofsson, Ph.D., Luleå University of Technology, and Geoffrey Q. P. Shen, Ph.D., Hong Kong Polytechnic University
ISBN (Online): 978-0-7844-8323-7
Copyright
© 2020 American Society of Civil Engineers.
History
Published online: Oct 14, 2020
Published in print: Oct 14, 2020
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.