Keeping the Water Moving: Solving Pressure Problems with Multiple Constraints in Stillwater, Oklahoma

Publication: Pipelines 2020

ABSTRACT

The City of Stillwater (City) has experienced explosive growth in the southwest portion of the City’s service area. The service area includes a wide range of development, from areas within the City to a large portion of City owned rural service areas and wholesale customers. This growth combined with prolonged drought led to operational water pressures of 6 pounds per square inch (psi) at customer meters during peak demands of 2011. This area of the city includes more than 9 square miles of land and six different pressure zones due to significant changes in terrain. The City envisioned a delivery program, “Water 2040,” to not only deliver water supply at the required pressure to meet current demands, but also to address the needs of customers through the year 2040. The City’s multiple objectives and constraints were established as: (1) ensure minimum pressure of 45 psi at all locations from 2015 through 2040; (2) limit phasing to $30 million (M) per loan to satisfy a Trust Indenture Limitation, with projected total program cost of $93.2 M; (3) maintain water quality throughout all phases; (4) incorporate risk and resiliency planning while limiting oversizing; (5) meet average day, maximum day, and fire flow (where applicable) requirements; (6) increase system storage from 0.5 million gallons (MG) to 2.5 MG; (7) meet Oklahoma Department of Environmental Quality (DEQ) consent order deadlines for water pressure improvements and unpermitted facilities. To identify the optimal approach for efficiently delivering the Water 2040 Program, the City incorporated all of the objectives and constraints into a decision matrix that was fueled by hydraulic modeling and prioritization. The City identified the phasing and has successfully constructed 3 pump stations, 9 miles of pipe, and 2 elevated water storage tanks to meet the goals of the Water 2040 Program. The program will continue to deliver an additional 7 mi of pipe and a new water treatment plant (WTP) finished water pump station.

Get full access to this article

View all available purchase options and get full access to this chapter.

Information & Authors

Information

Published In

Go to Pipelines 2020
Pipelines 2020
Pages: 221 - 231
Editors: J. Felipe Pulido, OBG, Part of Ramboll and Mark Poppe, Brown and Caldwell
ISBN (Online): 978-0-7844-8321-3

History

Published online: Aug 6, 2020
Published in print: Aug 6, 2020

Permissions

Request permissions for this article.

Authors

Affiliations

Lars B. Ostervold Jr> [email protected]
P.E.
Project Manager, Jacobs, Tulsa, OK. Email: [email protected]
Jennifer Henke [email protected]
P.E.
Lead Hydraulic Engineer, Jacobs, Dallas, TX. Email: [email protected]
William (Bill) Millis [email protected]
P.E.
Director, Water Resources Engineering, City of Stillwater, Stillwater, OK. Email: [email protected]
David Barth [email protected]
P.E.
Project Manager, City of Stillwater, Stillwater, OK. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$90.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$90.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share