Pipelines 2020
Keeping the Water Moving: Solving Pressure Problems with Multiple Constraints in Stillwater, Oklahoma
Publication: Pipelines 2020
ABSTRACT
The City of Stillwater (City) has experienced explosive growth in the southwest portion of the City’s service area. The service area includes a wide range of development, from areas within the City to a large portion of City owned rural service areas and wholesale customers. This growth combined with prolonged drought led to operational water pressures of 6 pounds per square inch (psi) at customer meters during peak demands of 2011. This area of the city includes more than 9 square miles of land and six different pressure zones due to significant changes in terrain. The City envisioned a delivery program, “Water 2040,” to not only deliver water supply at the required pressure to meet current demands, but also to address the needs of customers through the year 2040. The City’s multiple objectives and constraints were established as: (1) ensure minimum pressure of 45 psi at all locations from 2015 through 2040; (2) limit phasing to $30 million (M) per loan to satisfy a Trust Indenture Limitation, with projected total program cost of $93.2 M; (3) maintain water quality throughout all phases; (4) incorporate risk and resiliency planning while limiting oversizing; (5) meet average day, maximum day, and fire flow (where applicable) requirements; (6) increase system storage from 0.5 million gallons (MG) to 2.5 MG; (7) meet Oklahoma Department of Environmental Quality (DEQ) consent order deadlines for water pressure improvements and unpermitted facilities. To identify the optimal approach for efficiently delivering the Water 2040 Program, the City incorporated all of the objectives and constraints into a decision matrix that was fueled by hydraulic modeling and prioritization. The City identified the phasing and has successfully constructed 3 pump stations, 9 miles of pipe, and 2 elevated water storage tanks to meet the goals of the Water 2040 Program. The program will continue to deliver an additional 7 mi of pipe and a new water treatment plant (WTP) finished water pump station.
Get full access to this article
View all available purchase options and get full access to this chapter.
Information & Authors
Information
Published In
Pipelines 2020
Pages: 221 - 231
Editors: J. Felipe Pulido, OBG, Part of Ramboll and Mark Poppe, Brown and Caldwell
ISBN (Online): 978-0-7844-8321-3
Copyright
© 2020 American Society of Civil Engineers.
History
Published online: Aug 6, 2020
Published in print: Aug 6, 2020
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.