Free access
EDITOR'S NOTE
Aug 13, 2010

Editor’s Note

Publication: Journal of Construction Engineering and Management
Volume 136, Issue 9
 This issue of the ASCE Journal of Construction Engineering and Management includes a case study (“Contemporaneous Time Series and Forecasting Methodologies for Predicting Short-Term Productivity”) and a technical paper (“Cross-Validation of Short-Term Productivity Forecasting Methodologies”) that are related. The author, Dr. Seokyon Hwang, has written these two articles so that the technical paper will be more meaningful to readers if they read the case study, by Hwang and Liang Y. Liu, first. However, the policy for ASCE journals is that technical papers appear first and case studies follow. Rather than make an exception to this policy, the decision was made to print the technical paper before the case study and to use this editor’s note to notify readers that they consider reading the case study first. Please consider reading the case study first, if you choose to read these two related articles.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 136Issue 9September 2010
Pages: 935

History

Received: Jun 15, 2010
Accepted: Jun 15, 2010
Published online: Aug 13, 2010
Published in print: Sep 2010

Permissions

Request permissions for this article.

Authors

Affiliations

Charles T. Jahren

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share