Abstract

Effective implementation of modularization demands close collaboration among the various project stakeholders due to the distinct and complex needs of such construction method. In fact, lack of adequate collaboration is one of the main factors impacting modular construction performance. Despite that, no previous study has yet addressed collaboration requirements in modular construction and their cascading failure impact on project performance. This paper fills such a knowledge gap. To this end, the authors followed a multistep research methodology. First, systematic literature analysis was performed to identify the factors impacting collaboration and the impacted modular risks as well as their cause–effect relationships. Second, two surveys were distributed to collect (1) importance weights and failure probabilities for the collaboration factors; and (2) failure probabilities and performance impacts for the modular risks. Third, network analysis was conducted using in- and out-degree centralities to determine the most influential and sensitive aspects in terms of collaboration. Fourth, independent cascade modeling was performed to capture the cascading failure effect of various collaboration aspects on project performance. Ultimately, a total of 25 factors were found to impact collaboration categorized under four themes, including (1) project organization and control, (2) stakeholders’ relationships and characteristics, (3) information sharing, documentation, and technologies, and (4) design and construction planning. Furthermore, 10 modular operation risks were found to be impacted by collaboration in construction projects. Although the most influential factors were related to information sharing, documentation, and technologies, the most sensitive factors fell within the design and construction planning. Most importantly, results show that inadequate collaboration during design and construction planning can lead to 70.6% direct growth in schedule and cost of modularized projects. This paper contributes to the body of knowledge by offering an unprecedented framework that investigates collaboration requirements in modular construction and their interdependencies.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

All data, models, and code generated or used during the study appear in the published article.

References

Abdul Nabi, M., and I. H. El-adaway. 2020. “Modular construction: Determining decision-making factors and future research needs.” J. Manage. Eng. 36 (6): 04020085. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000859.
Abdul Nabi, M., and I. H. El-adaway. 2021. “Understanding the key risks affecting cost and schedule performance of modular construction projects.” J. Manage. Eng. 37 (4): 04021023. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000917.
Abdul Nabi, M., and I. H. El-adaway. 2022. “Understanding disputes in modular construction projects: Key common causes and their associations.” J. Constr. Eng. Manage. 148 (1): 04021184. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002208.
Ahmat, K. 2009. “Graph theory and optimization problems for very large networks.” Preprint, submitted July 17, 2009. https://arxiv.org/abs/0907.3099.
Akroush, N. S., and I. H. El-adaway. 2017. “Utilizing construction leading safety indicators: Case study of Tennessee.” J. Manage. Eng. 33 (5): 06017002. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000546.
Arashpour, M., Y. Bai, G. Aranda-Mena, A. Bab-Hadiashar, R. Hosseini, and P. Kalutara. 2017. “Optimizing decisions in advanced manufacturing of prefabricated products: Theorizing supply chain configurations in off-site construction.” Autom. Constr. 84 (Dec): 146–153. https://doi.org/10.1016/j.autcon.2017.08.032.
Assaad, R., I. H. El-Adaway, and I. S. Abotaleb. 2020. “Predicting project performance in the construction industry.” J. Constr. Eng. Manage. 146 (5): 04020030. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001797.
Atakul, N., and S. Ergonul. 2022. “Exploring architectural design factors affecting building maintainability and strategies to overcome current shortcomings.” J. Perform. Constr. Facil. 36 (6): 04022053. https://doi.org/10.1061/(ASCE)CF.1943-5509.0001770.
Bak, P., C. Tang, and K. Wiesenfeld. 1987. “Self-organized criticality: An explanation of the 1/f noise.” Phys. Rev. Lett. 59 (4): 381. https://doi.org/10.1103/PhysRevLett.59.381.
Banihashemi, S., A. Tabadkani, and M. R. Hosseini. 2018. “Integration of parametric design into modular coordination: A construction waste reduction workflow.” Autom. Constr. 88 (Apr): 1–12. https://doi.org/10.1016/j.autcon.2017.12.026.
Baral, S. S., R. Fries, and Y. Qi. 2023. “Transportation agency and landowner perspectives on snow fence programs.” J. Cold Reg. Eng. 37 (1): 04022014. https://doi.org/10.1061/(ASCE)CR.1943-5495.0000291.
Bedair, O. 2015. “Rational design of pipe racks used for oil sands and petrochemical facilities.” Pract. Period. Struct. Des. Constr. 20 (2): 04014029. https://doi.org/10.1061/(ASCE)SC.1943-5576.0000224.
Bhatia, A. P. S., S. Han, and O. Moselhi. 2022. “A simulation-based statistical method for planning modular construction manufacturing.” J. Inf. Technol. Construct. 27 (Jan): 130–144. https://doi.org/10.36680/j.itcon.2022.007.
Caliandro, A. 2022. “Related entries.” Elgar Encycl. Technol. Polit. 40 (3): 125.
Chen, L., Q. Lu, and X. Zhao. 2020. “Rethinking the construction schedule risk of infrastructure projects based on dialectical systems and network theory.” J. Manage. Eng. 36 (5): 04020066. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000829.
Chen, Y., G. E. Okudan, and D. R. Riley. 2010. “Decision support for construction method selection in concrete buildings: Prefabrication adoption and optimization.” Autom. Constr. 19 (6): 665–675. https://doi.org/10.1016/j.autcon.2010.02.011.
Choi, J., and H. Song. 2014. “Evaluation of the modular method for industrial plant construction projects.” Int. J. Construct. Manage. 14 (3): 171–180. https://doi.org/10.1080/15623599.2014.922728.
Choi, J. O., X. B. Chen, and T. W. Kim. 2019. “Opportunities and challenges of modular methods in dense urban environment.” Int. J. Construct. Manage. 19 (2): 93–105. https://doi.org/10.1080/15623599.2017.1382093.
Cochran, W. G. 1977. Sampling techniques. 3rd ed. New York: Wiley.
Dogan, S. Z., D. Arditi, S. Gunhan, and B. Erbasaranoglu. 2015. “Assessing coordination performance based on centrality in an e-mail communication network.” J. Manage. Eng. 31 (3): 04014047. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000255.
Doo, M., and L. Liu. 2014. “Probabilistic diffusion of social influence with incentives.” IEEE Trans. Serv. Comput. 7 (3): 387–400. https://doi.org/10.1109/TSC.2014.2310216.
Dowsett, R., M. Green, M. Sexton, and C. Harty. 2019. “Projecting at the project level: MMC supply chain integration roadmap for small housebuilders.” Constr. Innovation 19 (2): 193–211. https://doi.org/10.1108/CI-07-2017-0059.
El-adaway, I. H., I. S. Abotaleb, and E. Vechan. 2017. “Social network analysis approach for improved transportation planning.” J. Infrastruct. Syst. 23 (2): 05016004. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000331.
Eldamnhoury, E. S., and A. S. Hanna. 2020. “Investigating vertical integration strategies in modular construction.” In Proc., Construction Research Congress 2020: Project Management and Controls, Materials, and Contracts, 1230–1238. Reston, VA: ASCE.
El Moustaid, F., Z. Thronton, H. Slamani, S. J. Ryan, and L. R. Johnson. 2019. “Understanding the effect of temperature on Bluetongue disease risk in livestock.” bioRxiv. https://doi.org/10.1101/759860.
Emuze, F., and J. J. Smallwood. 2014. “Collaborative working in South African construction: Contractors’ perspectives.” J. Eng. Des. Technol. 12 (3): 294–306. https://doi.org/10.1108/JEDT-08-2010-0057.
Eriksson, H., M. Sandberg, G. Jansson, and J. Lessing. 2021. “Exploring product modularity in residential building areas.” Buildings 11 (7): 281. https://doi.org/10.3390/buildings11070281.
Essiz, O., and I. Koman. 2006. “Designing concrete precast external wall components on multi storey steel stuctures according to modular co-ordination.” Archit. Sci. Rev. 49 (2): 149–155. https://doi.org/10.3763/asre.2006.4920.
Eteifa, S. O., and I. H. El-adaway. 2018. “Using social network analysis to model the interaction between root causes of fatalities in the construction industry.” J. Manage. Eng. 34 (1): 04017045. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000567.
Ezzeddine, A., and B. G. de Soto. 2021. “Connecting teams in modular construction projects using game engine technology.” Autom. Constr. 132 (Dec): 103887. https://doi.org/10.1016/j.autcon.2021.103887.
Fang, C., F. Marle, E. Zio, and J.-C. Bocquet. 2012. “Network theory–based analysis of risk interactions in large engineering projects.” Reliab. Eng. Syst. Saf. 106 (Oct): 1–10. https://doi.org/10.1016/j.ress.2012.04.005.
Fellows, R. F., and A. M. Liu. 2015. Research methods for construction. New York: Wiley.
Goh, E., and M. Loosemore. 2017. “The impacts of industrialization on construction subcontractors: A resource based view.” Construct. Manage. Econ. 35 (5): 288–304. https://doi.org/10.1080/01446193.2016.1253856.
Grudinschi, D., L. Kaljunen, J. Hallikas, and S. Sintonen. 2014. “Performance measurement and performance prediction of cross-sector collaboration: A framework for strategic management of value networks.” In Strategic management of value networks: How to create value in cross-sector collaboration and partnerships. Lappeenranta, Finland: Lappeenranta Univ. of Technology.
Gurmu, A. T., and A. A. Aibinu. 2018. “Survey of management practices enhancing labor productivity in multi-storey building construction projects.” Int. J. Prod. Perform. Manage. 67 (4): 717–735. https://doi.org/10.1108/IJPPM-02-2017-0032.
Hamzeh, F., O. Abdul Ghani, M. B. Saleh Bacha, and Y. Abbas. 2017. “Modular concrete construction: The differing perspectives of designers, manufacturers, and contractors in Lebanon.” Eng. Constr. Archit. Manage. 24 (6): 935–949. https://doi.org/10.1108/ECAM-11-2014-0148.
Han, S., A. Bouferguene, M. Al-Hussein, and U. Hermann. 2017. “3D-based crane evaluation system for mobile crane operation selection on modular-based heavy construction sites.” J. Constr. Eng. Manage. 143 (9): 04017060. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001360.
Han, S. H., S. Hasan, A. Bouferguène, M. Al-Hussein, and J. Kosa. 2015. “Utilization of 3D visualization of mobile crane operations for modular construction on-site assembly.” J. Manage. Eng. 31 (5): 04014080. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000317.
Hassan, R., A. Yosri, M. Ezzeldin, and W. El-Dakhakhni. 2022. “Robustness quantification of transit infrastructure under systemic risks: A hybrid network–analytics approach for resilience planning.” J. Transp. Eng. Part A: Syst. 148 (10): 04022089. https://doi.org/10.1061/JTEPBS.0000705.
Hegazy, T., K. Mostafa, and M. E. Esfahani. 2020. “Hands-on class exercise for efficient planning and execution of modular construction.” J. Civ. Eng. Educ. 146 (3): 05020002. https://doi.org/10.1061/(ASCE)EI.2643-9115.0000012.
Hofman, E., H. Voordijk, and J. Halman. 2009. “Matching supply networks to a modular product architecture in the house-building industry.” Build. Res. Inf. 37 (1): 31–42. https://doi.org/10.1080/09613210802628003.
Hummon, N. P., and P. Doreian. 1990. “Computational methods for social network analysis.” Social Networks 12 (4): 273–288. https://doi.org/10.1016/0378-8733(90)90011-W.
IPRA (Integrated Project Risk Assessment). 2013. “IR181-2-integratedproject risk assessment (IPRA), version 2.0.” Accessed September 13, 2022. https://www.construction-institute.org/resources/knowledgebase/knowledge-areas/risk-analysis-for-international-projects-(best-practice)/topics/rt-181/pubs/ir181-2.
Isaac, S., T. Bock, and Y. Stoliar. 2016. “A methodology for the optimal modularization of building design.” Autom. Constr. 65 (May): 116–124. https://doi.org/10.1016/j.autcon.2015.12.017.
Jaillon, L., and C.-S. Poon. 2010. “Design issues of using prefabrication in Hong Kong building construction.” Construct. Manage. Econ. 28 (10): 1025–1042. https://doi.org/10.1080/01446193.2010.498481.
Jang, S., and G. Lee. 2018. “Process, productivity, and economic analyses of BIM–based multi-trade prefabrication—A case study.” Autom. Constr. 89 (May): 86–98. https://doi.org/10.1016/j.autcon.2017.12.035.
Jin, X., Y. Wu, and C. Jin. 2016. “Research on stock network modeling and risk propagation based on complex network analysis.” In Proc., 2016 49th Hawaii Int. Conf. on System Sciences (HICSS), 1188–1194. New York: IEEE.
Johansen, E., and L. Walter. 2007. “Lean construction: Prospects for the German construction industry.” Lean Constr. J. 3 (1): 19–32.
Jonsson, H., and M. Rudberg. 2015. “Production system classification matrix: Matching product standardization and production-system design.” J. Constr. Eng. Manage. 141 (6): 05015004. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000965.
Kamali, M., and K. Hewage. 2017. “Development of performance criteria for sustainability evaluation of modular versus conventional construction methods.” J. Cleaner Prod. 142 (Jan): 3592–3606. https://doi.org/10.1016/j.jclepro.2016.10.108.
Khalili, A., and D. K. Chua. 2013. “IFC-based framework to move beyond individual building elements toward configuring a higher level of prefabrication.” J. Comput. Civ. Eng. 27 (3): 243–253. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000203.
Khan, A. A., R. Yu, T. Liu, N. Gu, and J. Walsh. 2023. “Volumetric modular construction risks: A comprehensive review and digital-technology-coupled circular mitigation strategies.” Sustainability 15 (8): 7019. https://doi.org/10.3390/su15087019.
Kim, A. A., H. Sadatsafavi, S. D. Anderson, and P. Bishop. 2017. “Preparing for the future of transportation construction: Strategies for state transportation agencies.” J. Manage. Eng. 33 (3): 04016045. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000494.
Kirschke, P., and D. Sietko. 2021. “The function and potential of innovative reinforced concrete prefabrication technologies in achieving residential construction goals in Germany and Poland.” Buildings 11 (11): 533. https://doi.org/10.3390/buildings11110533.
Komurlu, R., and A. Er. 2020. “Evaluation of an OBCE conversion contract in a large-scale oil and gas project.” MATEC Web Conf. 312 (Apr): 02006. https://doi.org/10.1051/matecconf/202031202006.
Lee, C. Y., H. Y. Chong, P. C. Liao, and X. Wang. 2018. “Critical review of social network analysis applications in complex project management.” J. Manage. Eng. 34 (2): 04017061. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000579.
Lee, D., and S. Lee. 2021. “Digital twin for supply chain coordination in modular construction.” Appl. Sci. 11 (13): 5909. https://doi.org/10.3390/app11135909.
Lee, E. W., S. S. Ho, and M. O. Lwin. 2017. “Explicating problematic social network sites use: A review of concepts, theoretical frameworks, and future directions for communication theorizing.” New Media Soc. 19 (2): 308–326. https://doi.org/10.1177/1461444816671891.
Lee, J. B., and E. A. Stohr. 1985. Representing knowledge for portfolio management decision making. New York: New York Univ.
Li, X., W. Lu, F. Xue, L. Wu, R. Zhao, J. Lou, and J. Xu. 2022. “Blockchain-enabled IoT-BIM platform for supply chain management in modular construction.” J. Constr. Eng. Manage. 148 (2): 04021195. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002229.
Liu, M., H. Y. Chong, P. C. Liao, and L. Xu. 2019. “Probabilistic-based cascading failure approach to assessing workplace hazards affecting human error.” J. Manage. Eng. 35 (3): 04019006. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000690.
MBI (Modular Building Institute). 2019. “Combining offsite and site.” Accessed October 24, 2022. https://www.modular.org/htmlPage.aspx?name=Combining_Offsite_and_Site.
Mok, K. Y., G. Q. Shen, R. J. Yang, and C. Z. Li. 2017. “Investigating key challenges in major public engineering projects by a network-theory based analysis of stakeholder concerns: A case study.” Int. J. Project Manage. 35 (1): 78–94. https://doi.org/10.1016/j.ijproman.2016.10.017.
Moreno, J. L. 1960. The sociometry reader. Glencoe, IL: Free Press.
Mossman, A., and S. Sarhan. 2021. “Synchronising off-site fabrication with on-site production in construction.” Constr. Econ. Build. 21 (3): 122–141. https://doi.org/10.5130/AJCEB.v21i3.7638.
O’Connor, J. T., W. J. O’Brien, and J. O. Choi. 2014. “Critical success factors and enablers for optimum and maximum industrial modularization.” J. Constr. Eng. Manage. 140 (6): 04014012. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000842.
O’Connor, J. T., and J. Woo. 2017. “Proactive approach to engineering and design deliverables quality enhancement.” J. Manage. Eng. 33 (4): 04017005. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000508.
Pablo, Z., and K. A. London. 2020. “Stable relationality and dynamic innovation: Two models of collaboration in SME-driven offsite manufacturing supply chains in housing construction.” Eng. Constr. Archit. Manage. 27 (7): 1553–1577. https://doi.org/10.1108/ECAM-07-2019-0346.
Pan, W., D. Parker, and M. Pan. 2023. “Problematic interfaces and prevention strategies in modular construction.” J. Manage. Eng. 39 (2): 05023001. https://doi.org/10.1061/JMENEA.MEENG-5083.
Parker, T., and J. McEachen. 2016. “Cluster head selection in wireless mobile ad hoc networks using spectral graph theory techniques.” In Proc., 2016 49th Hawaii Int. Conf. on System Sciences (HICSS), 5851–5857. New York: IEEE.
Pathak, N., A. Banerjee, and J. Srivastava. 2010. “A generalized linear threshold model for multiple cascades.” In Proc., 2010 IEEE Int. Conf. on Data Mining, 965–970. New York: IEEE.
Patton, M. Q. 1990. Qualitative evaluation and research methods. Newbury Park, CA: SAGE.
Peltokorpi, A., H. Olivieri, A. D. Granja, and O. Seppänen. 2018. “Categorizing modularization strategies to achieve various objectives of building investments.” Construct. Manage. Econ. 36 (1): 32–48. https://doi.org/10.1080/01446193.2017.1353119.
Pereira, E., S. Ahn, S. Han, and S. Abourizk. 2018. “Identification and association of high-priority safety management system factors and accident precursors for proactive safety assessment and control.” J. Manage. Eng. 34 (1): 04017041. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000562.
Pow, J., K. Gayen, L. Elliott, and R. Raeside. 2012. “Understanding complex interactions using social network analysis.” J. Clin. Nurs. 21 (19pt20): 2772–2779. https://doi.org/10.1111/j.1365-2702.2011.04036.x.
Rahimian, F. P., V. Chavdarova, S. Oliver, F. Chamo, and L. P. Amobi. 2019. “OpenBIM-Tango integrated virtual showroom for offsite manufactured production of self-build housing.” Autom. Constr. 102 (Jun): 1–16. https://doi.org/10.1016/j.autcon.2019.02.009.
Rahman, S. H. A., I. R. Endut, N. Faisol, and S. Paydar. 2014. “The importance of collaboration in construction industry from contractors’ perspectives.” Procedia-Soc. Behav. Sci. 129 (May): 414–421. https://doi.org/10.1016/j.sbspro.2014.03.695.
Rahmandad, H., and J. Sterman. 2008. “Heterogeneity and network structure in the dynamics of diffusion: Comparing agent-based and differential equation models.” Manage. Sci. 54 (5): 998–1014. https://doi.org/10.1287/mnsc.1070.0787.
Ramaji, I. J., and A. M. Memari. 2018. “Extending the current model view definition standards to support multi-storey modular building projects.” Archit. Eng. Des. Manage. 14 (1–2): 158–176. https://doi.org/10.1080/17452007.2017.1386083.
Ramirez, J., J. Stadon, and T. Sanchez. 2016. “Media, arts, social sciences, humanities & design (MASH’D) workshop summary.” In Proc., 2016 IEEE Int. Symp. on Mixed and Augmented Reality (ISMAR-Adjunct). New York: IEEE.
Said, H. 2015. “Prefabrication best practices and improvement opportunities for electrical construction.” J. Constr. Eng. Manage. 141 (12): 04015045. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001018.
Schecter, J. G. 2018. “Triton Structural Concrete, Inc. v. City of N.Y.” Accessed September 17, 2018. https://casetext.com/case/triton-structural-concrete-inc-v-city-of-ny.
Shafiee, S., P. Piroozfar, L. Hvam, E. R. Farr, G. Q. Huang, W. Pan, and M. Korell. 2020. “Modularisation strategies in the AEC industry: A comparative analysis.” Archit. Eng. Des. Manage. 16 (4): 270–292. https://doi.org/10.1080/17452007.2020.1735291.
Shakarian, P., A. Bhatnagar, A. Aleali, E. Shaabani, and R. Guo. 2015. Diffusion in social networks, 47–58. Cham, Switzerland: Springer.
Sheffer, D. A. 2011. Innovation in modular industries: Implementing energy-efficient innovations in US buildings. Stanford, CA: Stanford Univ.
Smith, R. E. 2011. Prefab architecture: A guide to modular design and construction. Hoboken, NJ: Wiley.
Srour, F. J., I. Srour, and M. G. Lattouf. 2017. “A survey of absenteeism on construction sites.” Int. J. Manpower 38 (4): 533–547. https://doi.org/10.1108/IJM-08-2015-0135.
Su, G., M. Hastak, X. Deng, and R. Khallaf. 2021. “Risk sharing strategies for IPD projects: Interactional analysis of participants’ decision-making.” J. Manage. Eng. 37 (1): 04020101. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000853.
Sun, Y., J. Wang, J. Wu, W. Shi, D. Ji, X. Wang, and X. Zhao. 2020. “Constraints hindering the development of high-rise modular buildings.” Appl. Sci. 10 (20): 7159. https://doi.org/10.3390/app10207159.
Tam, V. W. Y., and J. J. L. Hao. 2014. “Prefabrication as a mean of minimizing construction waste on site.” Int. J. Construct. Manage. 14 (2): 113–121. https://doi.org/10.1080/15623599.2014.899129.
Tsehayae, A. A., and A. R. Fayek. 2014. “Data-driven approaches to discovering knowledge gaps related to factors affecting construction labor productivity.” In Proc., Construction Research Congress 2014: Construction in a Global Network, 837–846. Reston, VA: ASCE.
van der Ham, M., and R. Opdenakker. 2023. “Overcoming process-related barriers in modular high-rise building projects.” Int. J. Construct. Manage. 23 (10): 1779–1789. https://doi.org/10.1080/15623599.2021.2007593.
Votano, S., and R. Y. Sunindijo. 2014. “Client safety roles in small and medium construction projects in Australia.” J. Constr. Eng. Manage. 140 (9): 04014045. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000899.
Vrijhoef, R. 2011. Supply chain integration in the building industry: The emergence of integrated and repetitive strategies in a fragmented and project-driven industry. Amsterdam, Netherlands: IOS Press.
Vyas, G. S., K. N. Jha, and D. A. Patel. 2019. “Development of green building rating system using AHP and fuzzy integrals: A case of India.” J. Archit. Eng. 25 (2): 04019004. https://doi.org/10.1061/(ASCE)AE.1943-5568.0000346.
Waltman, L., N. J. Van Eck, and E. C. Noyons. 2010. “A unified approach to mapping and clustering of bibliometric networks.” J. Informetrics 4 (4): 629–635. https://doi.org/10.1016/j.joi.2010.07.002.
Wang, M., C. C. Wang, S. Sepasgozar, and S. Zlatanova. 2020. “A systematic review of digital technology adoption in off-site construction: Current status and future direction towards industry 4.0.” Buildings 10 (11): 204. https://doi.org/10.3390/buildings10110204.
Wang, X. G. 2014. “An algorithm for critical nodes problem in social networks based on owen value.” Sci. World J. 2014 (Apr): 414717. https://doi.org/10.1155/2014/414717.
Wang, Y., W. Huang, L. Zong, T. Wang, and D. Yang. 2013. “Influence maximization with limit cost in social network.” Sci. China Inf. Sci. 56 (7): 1–14. https://doi.org/10.1007/s11432-013-4895-5.
Wasserman, S., and K. Faust. 1994. Social network analysis: Methods and applications. New York: Cambridge University Press.
Wong, P. S., C. Zwar, and E. Gharaie. 2017. “Examining the drivers and states of organizational change for greater use of prefabrication in construction projects.” J. Constr. Eng. Manage. 143 (7): 04017020. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001309.
Wu, G., C. Peng, and T. Warren Liao. 2018. “Research on edges immunization strategy for complex network based on SIS-CA model.” Procedia Manuf. 17 (Jan): 1065–1072. https://doi.org/10.1016/j.promfg.2018.10.079.
Wu, L., W. Lu, R. Zhao, J. Xu, X. Li, and F. Xue. 2022. “Using blockchain to improve information sharing accuracy in the onsite assembly of modular construction.” J. Manage. Eng. 38 (3): 04022014. https://doi.org/10.1061/(ASCE)ME.1943-5479.0001029.
Wuni, I. Y., and G. Q. Shen. 2020. “Critical success factors for modular integrated construction projects: A review.” Build. Res. Inf. 48 (7): 763–784. https://doi.org/10.1080/09613218.2019.1669009.
Wuni, I. Y., G. Q. Shen, and R. Osei-Kyei. 2022. “Quantitative evaluation and ranking of the critical success factors for modular integrated construction projects.” Int. J. Construct. Manage. 22 (11): 2108–2120. https://doi.org/10.1080/15623599.2020.1766190.
Yang, R. J., and P. X. Zou. 2014. “Stakeholder-associated risks and their interactions in complex green building projects: A social network model.” Build. Environ. 73 (Mar): 208–222. https://doi.org/10.1016/j.buildenv.2013.12.014.
Yu, T., Q. Man, Y. Wang, G. Q. Shen, J. Hong, J. Zhang, and J. Zhong. 2019. “Evaluating different stakeholder impacts on the occurrence of quality defects in offsite construction projects: A Bayesian-network-based model.” J. Cleaner Prod. 241 (Dec): 118390. https://doi.org/10.1016/j.jclepro.2019.118390.
Zawdie, G. 2012. “Construction innovation through change management.” In Construction innovation and process improvement, 19–44. New York: Wiley.
Zhai, X., R. Reed, and A. Mills. 2014. “Embracing off-site innovation in construction in China to enhance a sustainable built environment in urban housing.” Int. J. Construct. Manage. 14 (3): 123–133. https://doi.org/10.1080/15623599.2014.922727.
Zhang, S., Z. Li, S. Ma, L. Li, and M. Yuan. 2022. “Critical factors influencing interface management of prefabricated building projects: Evidence from China.” Sustainability 14 (9): 5418. https://doi.org/10.3390/su14095418.
Zhang, Y., Z. Lei, S. Han, A. Bouferguene, and M. Al-Hussein. 2020. “Process-oriented framework to improve modular and offsite construction manufacturing performance.” J. Constr. Eng. Manage. 146 (9): 04020116. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001909.
Zhao, Z., D. Chen, L. Wang, and C. Han. 2018. “Credit risk diffusion in supply chain finance: A complex networks perspective.” Sustainability 10 (12): 4608. https://doi.org/10.3390/su10124608.

Information & Authors

Information

Published In

Go to Journal of Management in Engineering
Journal of Management in Engineering
Volume 39Issue 6November 2023

History

Received: Jan 5, 2023
Accepted: Jul 3, 2023
Published online: Sep 6, 2023
Published in print: Nov 1, 2023
Discussion open until: Feb 6, 2024

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Mohamad Abdul Nabi, Aff.M.ASCE [email protected]
Project Control Analyst, Anser Advisory LLC, 311 W Monroe St., Suite 301-302, Chicago, IL 60607; formerly, Ph.D. Candidate, Dept. of Civil, Architectural, and Environmental Engineering, Missouri Univ. of Science and Technology, Rolla, MO 65409. Email: [email protected]
Amr Elsayegh, Aff.M.ASCE [email protected]
Senior Innovation Engineer, McCarthy Building Companies, Inc., 6225 N 24th St. 125, Phoenix, AZ 85016; formerly, Ph.D. Candidate, Dept. of Civil, Architectural, and Environmental Engineering, Missouri Univ. of Science and Technology, Rolla, MO 65409. Email: [email protected]
Hurst-McCarthy Professor of Construction Engineering and Management, Professor of Civil Engineering, and Founding Director of the Missouri Consortium of Construction Innovation, Dept. of Civil, Architectural, and Environmental Engineering, and Dept. of Engineering Management and Systems Engineering, Missouri Univ. of Science and Technology, Rolla, MO 65409 (corresponding author). ORCID: https://orcid.org/0000-0002-7306-6380. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

  • Collaborative Management Framework for Interorganizational Risk in Megaprojects Based on Metanetwork, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-6073, 40, 5, (2024).
  • Quantitative Assessment of the Architect’s Role under US Standard Construction Contracts: A Graph Theory Approach, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-6072, 40, 5, (2024).
  • Unveiling and Evaluating the Collaboration in Engineering Projects through a Two-Layer Information Collaboration Network Model, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-5871, 40, 3, (2024).
  • Construction Waste Reduction in Buildings through Modular and Offsite Construction, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-5828, 40, 4, (2024).
  • Flexible Infrastructure Design: A Real Options Reasoning Approach to Navigating Uncertainty in Large-Scale Projects, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-5678, 40, 3, (2024).
  • Accelerating the Circular Economy Transition: A Construction Value Chain-Structured Portfolio of Strategies and Implementation Insights, Journal of Construction Engineering and Management, 10.1061/JCEMD4.COENG-14550, 150, 8, (2024).

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share