Case Studies
Jul 20, 2022

Postaward Construction and Contract Management of Engineering, Procurement, and Construction Hydropower Projects: Two Case Studies from Uganda

Publication: Journal of Management in Engineering
Volume 38, Issue 6

Abstract

The current economic and infrastructural growth in developing countries has triggered the use of multiple forms of alternative contracting methods (ACMs)—including engineering, procurement, and construction (EPC)—in various public sector projects. However, the relative lack of in-depth experience in using EPC contracting methods among public agencies has presented numerous problems. To this end, the goal of this research is to identify the broad postaward construction and contract management (PA-CCM) challenges associated with EPC projects in developing countries using two major infrastructure hydropower projects in Uganda as case studies. A systematic literature review was first conducted to establish a preliminary list of challenges. Afterward, case study data were collected by examining project documentation, conducting site visits, and holding semistructured interviews. The results of this study offered a total of 73 PA-CCM challenges that were categorized into seven different themes. Also, 14 critical lessons learned were identified to better enable stakeholders to mitigate potential problems and promote improved performance for their EPC projects. The outcomes of this paper serve as a pivotal foundation for construction practitioners and future scholars to develop effective mitigation strategies for the challenges associated with EPC contracting methods in developing countries.

Practical Applications

This paper established a comprehensive list of postaward construction and contract management challenges related to engineering, procurement, and construction projects in developing countries. The presented challenges are extracted based on two project case studies and cross-validated with the current literature. Ultimately, lessons learned for industry practitioners to mitigate the key postaward construction and contract management challenges are devised. The outcomes of this paper provide a solid basis for industry practitioners to identify the various postaward construction and contract management challenges in engineering, procurement, and construction projects and subsequently promote effective implementation and enhanced project performance. The latter is achieved by considering the lessons learned and recommendations offered by this paper during the early stages of the project and before the contract award.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

All data used and/or generated during this study are included in the published article.

Acknowledgments

The authors would like to thank Dr. Kebreab Ghebremichael at the University of South Florida, Dr. Sam Kayaga at Loughborough University, Dr. Apollo Tutesigensi at Leeds University, and Ronald Lutaaya at Edinburgh University, and Dr. Benon Abaho at University College London for their support with literature materials. The authors are also grateful to all project stakeholders who devoted their time and effort in contributing by facilitating the contract document review, site visits, and semistructured interviews.

References

Abotaleb, I. S., I. H. El-Adaway, and M. B. Moussa. 2019. “Guidelines for administrating and drafting nonpayment owners’ obligation provisions under design-build contracts.” J. Manage. Eng. 35 (4): 04019010. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000693.
Aldhaheri, M., A. Bakchan, and M. A. Sandhu. 2018. “A structural equation model for enhancing effectiveness of engineering, procurement and construction (EPC) major projects: End-user’s perspective.” Eng. Constr. Archit. Manage. 25 (9): 1226–1252. https://doi.org/10.1108/ECAM-07-2017-0130.
Al-Mhdawi, M. K. S., M. P. Brito, M. Abdul Nabi, I. H. El-Adaway, and B. S. Onggo. 2022. “Capturing the impact of COVID-19 on construction projects in developing countries: A case study of Iraq.” J. Manage. Eng. 38 (1): 05021015. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000991.
Antwi-Afari, M. F., E. Pärn, D.-G. Owusu-Manu, and D. J. Edwards. 2016. “Conceptualization of the absorptive capability paradox in technology transfer projects: A study of the Ghanaian construction industry.” Mindanao J. Sci. Technol. 14 (Jan–Dec): 57–78.
Boadu, E. F., C. C. Wang, and R. Y. Sunindijo. 2020. “Characteristics of the construction industry in developing countries and its implications for health and safety: An exploratory study in Ghana.” Int. J. Environ. Res. Public Health 17 (11): 4110. https://doi.org/10.3390/ijerph17114110.
Brinkmann, S. 2013. Qualitative interviewing: Understanding qualitative research. New York: Oxford University Press.
Buniya, M. K., I. Othman, R. Y. Sunindijo, A. F. Kineber, E. Mussi, and H. Ahmad. 2021. “Barriers to safety program implementation in the construction industry.” Ain Shams Eng. J. 12 (1): 65–72. https://doi.org/10.1016/j.asej.2020.08.002.
Bunni, N. 2005. The FIDIC forms of contract. New York: Wiley.
Chan, A. P. C., D. W. M. Chan, L. C. N. Fan, P. T. I. Lam, and J. F. Y. Yeung. 2008. “Achieving partnering success through an incentive agreement: Lessons learned from an underground railway extension project in Hong Kong.” J. Manage. Eng. 24 (8): 128–137. https://doi.org/10.1061/(ASCE)0742-597X(2008)24:3(128).
CII (Construction Industry Institute). 1999. Exceptional project and methods of improving project performance. Austin, TX: CII.
Creswell, J. W., and V. L. P. Clark. 2011. Designing and conducting mixed methods research. 2nd ed. Thousand Oaks, CA: SAGE.
Darvas, P., and R. Palmer. 2014. Demand and supply of skills in Ghana. How can training programs improve employment and productivity?. Washington, DC: World Bank.
de Jong, M., W. P. Henry, and N. Stansbury. 2009. “Eliminating corruption in our engineering/construction industry.” Leadersh. Manage. Eng. 9 (3): 105–111. https://doi.org/10.1061/(ASCE)1532-6748(2009)9:3(105).
Demetracopoulou, V., W. J. O’Brien, and N. Khwaja. 2020. “Lessons learned from selection of project delivery methods in highway projects: The Texas experience.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (1): 04519040. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000340.
Derakhshanalavijeh, R., and J. M. C. Teixeira. 2017. “Cost overrun in construction projects in developing countries, gas-oil industry of Iran as a case study.” J. Civ. Eng. Manage. 23 (1): 125–136. https://doi.org/10.3846/13923730.2014.992467.
Du, L., W. Tang, C. Liu, S. Wang, T. Wang, W. Shen, M. Huang, and Y. Zhou. 2016. “Enhancing engineer–procure–construct project performance by partnering in international markets: Perspective from Chinese construction companies.” Int. J. Project Manage. 34 (1): 30–43. https://doi.org/10.1016/j.ijproman.2015.09.003.
Eisenhardt, K. M. 1989. “Building theories from case study research.” Acad. Manage. Rev. 14 (4): 532–550. https://doi.org/10.2307/258557.
Electricity Regulatory Authority. 2020. “Installed capacity.” Accessed July 3, 2020. https://www.era.or.ug/index.php/stats/generation-statistics/installed-capacity.
Enshassi, A., R. Choudhry, and M. Abualqumboz. 2009. “Quality and safety in the Palestinian construction industry.” Rev. Ing. Constr./J. Constr. Eng. 24 (1): 49–78.
Gad, G. M., B. Davis, P. P. Shrestha, and M. Fathi. 2020. “Legal and contractual issues in lump-sum design-build implementation on large-scale airport projects.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (1): 05019011. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000364.
Gad, G. M., B. Davis, P. P. Shrestha, and P. Harder. 2019. “Lessons learned from progressive design-build implementation on airport projects.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 11 (4): 04519020. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000320.
Ganbat, T., H. Y. Chong, P. C. Liao, and J. Leroy. 2020. “Identification of critical risks in international engineering procurement construction projects of Chinese contractors from the network perspective.” Can. J. Civ. Eng. 47 (12): 1359–1371. https://doi.org/10.1139/cjce-2019-0549.
Ghanbarizadeh, A., J. Heydari, J. Razmi, and A. Bozorgi-Amiri. 2019. “A purchasing portfolio model for the commercial construction industry: A case study in a mega mall.” Prod. Plann. Control 30 (15): 1283–1304. https://doi.org/10.1080/09537287.2019.1612110.
Godwin, W. 2013. International construction contracts: A handbook. New York: Wiley.
Goh, Y. M., and D. Chua. 2013. “Neural network analysis of construction safety management systems: A case study in Singapore.” Construct. Manage. Econ. 31 (5): 460–470. https://doi.org/10.1080/01446193.2013.797095.
Gransberg, D. D., J. E. Koch, and K. R. Molennar. 2006. Preparing for design-build projects. Reston, VA: ASCE.
Gransberg, D. D., and E. Windel. 2008. “Communicating design quality requirements for public sector design/build projects.” J. Manage. Eng. 24 (2): 105–110. https://doi.org/10.1061/(ASCE)0742-597X(2008)24:2(105).
Gunduz, M., and H. A. Elsherbeny. 2020. “Operational framework for managing construction-contract administration practitioners’ perspective through modified delphi method.” J. Constr. Eng. Manage. 146 (3): 04019110. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001768.
Habibi, M., S. Kermanshachi, and B. Rouhanizadeh. 2019. “Identifying and measuring engineering, procurement, and construction (EPC) key performance indicators and management strategies.” Infrastructures 4 (2): 14. https://doi.org/10.3390/infrastructures4020014.
Ham, N., S. Moon, J.-H. Kim, and J.-J. Kim. 2018. “Economic analysis of design errors in BIM-based high-rise construction projects: Case study of Haeundae L project.” J. Constr. Eng. Manage. 144 (6): 05018006. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001498.
Hansen, S., S. F. Rostiyanti, and A. Rif’at. 2020. “Causes, effects, and mitigations framework of contract change orders: Lessons learned from GBK aquatic stadium project.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (1): 05019008. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000341.
Hwang, B.-G., and E.-S. J. Lim. 2013. “Critical success factors for key project players and objectives: Case study of Singapore.” J. Constr. Eng. Manage. 139 (2): 204–215. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000597.
IHA (International Hydropower Association). 2020. “Country profile: Uganda.” Accessed July 3, 2020. https://www.hydropower.org/country-profiles/uganda.
Kabirifar, K., and M. Mojtahedi. 2019. “The impact of engineering, procurement and construction (EPC) phases on project performance: A case of large-scale residential construction project.” Buildings 9 (1): 15. https://doi.org/10.3390/buildings9010015.
Kayastha, G. P. 2014. “Importance of contract administration for timely construction of hydropower projects without disputes.” Hydro Nepal: J. Water Energy Environ. 14 (Oct): 49–51. https://doi.org/10.3126/hn.v14i0.11265.
Ke, H., Z. Cui, K. Govindan, and E. K. Zavadskas. 2015. “The impact of contractual governance and trust on EPC projects in construction supply chain performance.” Eng. Econ. 26 (4): 349–363. https://doi.org/10.5755/j01.ee.26.4.9843.
Ke, Y., S. Wang, A. P. C. Chan, and E. Cheung. 2011. “Understanding the risks in China’s PPP projects: Ranking of their probability and consequence.” Eng. Constr. Archit. Manage. 18 (5): 481–496. https://doi.org/10.1108/09699981111165176.
Khwaja, N., W. J. O’Brien, M. Martinez, B. Sankaran, J. T. O’Connor, and W. B. Hale. 2018. “Innovations in project delivery method selection approach in the Texas Department of Transportation.” J. Manage. Eng. 34 (6): 05018010. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000645.
Kim, M. H., and E. B. Lee. 2019. “A forecast model for the level of engineering maturity impact on contractor’s procurement and construction costs for offshore EPC megaprojects.” Energies 12 (12): 2295. https://doi.org/10.3390/en12122295.
Krippendorff, K. 2004. Content analysis: An introduction to its methodology. Thousand Oaks, CA: SAGE.
Latrubesse, E. M., E. Park, K. Sieh, T. Dang, Y. N. Lin, and S.-H. Yun. 2020. “Dam failure and a catastrophic flood in the Mekong basin (Bolaven Plateau), southern Laos, 2018.” Geomorphology 362 (Aug): 107221. https://doi.org/10.1016/j.geomorph.2020.107221.
Le, Y., M. Shan, A. P. C. Chan, and Y. Hu. 2014. “Investigating the causal relationships between causes of and vulnerabilities to corruption in the Chinese public construction sector.” J. Constr. Eng. Manage. 140 (9): 05014007. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000886.
Lee, C. Y., H. Y. Chong, and X. Wang. 2018. “Enhancing BIM performance in EPC projects through integrative trust-based functional contracting model.” J. Constr. Eng. Manage. 144 (7): 06018002. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001521.
Lee, C.-Y., H.-Y. Chong, Q. Li, and X. Wang. 2020. “Joint contract-function effects on BIM-enabled EPC project performance.” J. Constr. Eng. Manage. 146 (3): 04020008. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001766.
Liker, J. K. 2004. The Toyota way: 14 management principles from the world’s greatest manufacturer. New York: McGraw-Hill.
Liu, J. Y., Q. Xie, B. Xia, and A. Bridge. 2017. “Impact of design risk on the performance of design-build projects.” J. Constr. Eng. Manage. 143 (6): 04017010. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001299.
Love, P. E. D., J. Zhou, J. Matthews, and H. Lou. 2016. “Object oriented modeling: Retrospective systems information model for constructability assessment.” Autom. Constr. 71 (Nov): 359–371. https://doi.org/10.1016/j.autcon.2016.08.032.
Mai, S. H., V. Siphada, J. Wang, V. Mekthanavanh, H. H. Hlaing, and P. Sokliep. 2019. “Evaluating and classifying the impact of individual risk on the delayed EPC hydropower projects in the developing countries of Asia.” Int. J. Risk Assess. Manage. 22 (2): 170–194. https://doi.org/10.1504/IJRAM.2019.101279.
Meiling, J. H., M. Sandberg, and H. Johnsson. 2014. “A study of a plan-do-check-act method used in less industrialized activities: Two cases from industrialized housebuilding.” Construct. Manage. Econ. 32 (1–2): 109–125. https://doi.org/10.1080/01446193.2013.812227.
Migliaccio, G. C., and L. Holm. 2018. Introduction to construction project engineering. London: Routledge.
Molenaar, K. R., A. D. Songer, and M. Barash. 1999. “Public-sector design/build evolution and performance.” J. Manage. Eng. 15 (2): 54–62. https://doi.org/10.1061/(ASCE)0742-597X(1999)15:2(54).
Neuendorf, K. A. 2002. The content analysis guidebook. Thousand Oaks, CA: SAGE.
Ogunrinde, O., I. Okpala, R. A. Ojelabi, O. Oyeyipo, and M. T. Hatamleh. 2022. “Assessing automation readiness of recurring pavement failure in developing countries: Case studies of Nigeria and Jordan.” In Proc., Construction Research Congress 2022, 912–921. Reston, VA: ASCE.
Okere, G. O. 2012. “An investigative study of contract administration practices of general contractors on federal and state DOT projects.” Ph.D. thesis, Dept. of Technology Management, Indiana State Univ. ProQuest LLC.
Ou-Yang, C., and W. L. Chen. 2017. “Applying a risk assessment approach for cost analysis and decision-making: A case study for a basic design engineering project.” J. Chin. Inst. Eng. 40 (5): 378–390. https://doi.org/10.1080/02533839.2017.1335620.
Papajohn, D., and M. El Asmar. 2020. “Percent base design and initial award performance in design–build highway projects.” J. Manage. Eng. 36 (3): 04020008. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000759.
Parchami Jalal, P., S. Nikkhou, and M. Hoseingholi. 2020. “Challenges of the engineering design partnership group in design-build contracts.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (3): 04520028. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000416.
Peckitt, S. J., A. I. Glendon, and R. T. Booth. 2004. Societal influences on safety culture in the construction industry. 1st ed., edited by S. Rowlinson. London: SPON.
Poppo, L., and T. Zenger. 2002. “Do formal contracts and relational governance function as substitutes or complements?” Strategic Manage. J. 23 (8): 707–725. https://doi.org/10.1002/smj.249.
Reuer, J. J., and A. Ariño. 2007. “Strategic alliance contracts: Dimensions and determinants of contractual complexity.” Strategic Manage. J. 28 (3): 313–330. https://doi.org/10.1002/smj.581.
Ribas, J. R., M. E. Arce, F. A. Sohler, and A. Suárez-García. 2019. “Multi-criteria risk assessment: Case study of a large hydroelectric project.” J. Cleaner Prod. 227 (Aug): 237–247. https://doi.org/10.1016/j.jclepro.2019.04.043.
Shen, W., B. Choi, S. Lee, W. Tang, and C. T. Haas. 2018. “How to improve interface management behaviors in EPC projects: Roles of formal practices and social norms.” J. Manage. Eng. 34 (6): 04018032. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000639.
Shen, W., W. Tang, S. Wang, C. F. Duffield, F. K. P. Hui, and R. You. 2017a. “Enhancing trust-based interface management in international engineering-procurement-construction projects.” J. Constr. Eng. Manage. 143 (9): 04017061. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001351.
Shen, W., W. Tang, W. Yu, C. F. Duffield, F. K. P. Hui, Y. Wei, and J. Fang. 2017b. “Causes of contractors’ claims in international engineering-procurement-construction projects.” J. Civ. Eng. Manage. 23 (6): 727–739. https://doi.org/10.3846/13923730.2017.1281839.
Shrestha, P. P., and J. Batista. 2020. “Lessons learned in design-build and construction-manager-at-risk water and wastewater project.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (2): 04520002. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000376.
Son, B. Y., and E. B. Lee. 2019. “Using text mining to estimate schedule delay risk of 13 offshore oil and gas EPC case studies during the bidding process.” Energies 12 (10): 1956. https://doi.org/10.3390/en12101956.
Sullivan, J., M. El Asmar, J. Chalhoub, and H. Obeid. 2017. “Two decades of performance comparisons for design-build, construction manager at risk, and design-bid-build: Quantitative analysis of the state of knowledge on project cost, schedule, and quality.” J. Constr. Eng. Manage. 143 (6): 04017009. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001282.
Sultan, B., and W. Alaghbari. 2021. “Construction industry sustainable development indicator for low-income developing countries: Yemen as a case study.” Int. J. Construct. Manage. 1–8. https://doi.org/10.1080/15623599.2021.1951429.
Suppramaniam, S. U. K., S. Ismail, and S. Suppramaniam. 2018. “Causes of delay in the construction phase of oil and gas projects in Malaysia.” Int. J. Eng. Technol. 7 (2.29): 203–209. https://doi.org/10.14419/ijet.v7i2.29.13318.
Talebi, S., L. Koskela, P. Tzortzopoulos, M. Kagioglou, C. Rausch, F. Elghaish, and M. Poshdar. 2021. “Causes of defects associated with tolerances in construction: A case study.” J. Manage. Eng. 37 (4): 05021005. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000914.
Thomas, H. R., and R. D. Ellis Jr. 2008. Interpreting construction contracts: Fundamental principles for contractors, project managers, and contract administrators. Reston, VA: ASCE.
Thweatt, W. T., and R. J. Long. 2017. EPC contract risk analysis associated with onshore projects in developing countries. Littleton, CO: Long International.
Tinsley, H. E. A., and D. J. Weiss. 1975. “Interrater reliability and agreement of subjective judgments.” J. Couns. Psychol. 22 (4): 358–376. https://psycnet.apa.org/doi/10.1037/h0076640.
Uddin, N. 2005. “Lessons learned: Failure of a hydroelectric power project dam.” J. Perform. Constr. Facil. 19 (1): 69–77. https://doi.org/10.1061/(ASCE)0887-3828(2005)19:1(69).
Wang, S., W. Tang, and Y. Li. 2013. “Relationship between owners’ capabilities and project performance on development of hydropower projects in China.” J. Constr. Eng. Manage. 139 (9): 1168–1178. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000694.
Wang, T., W. Tang, L. Du, C. F. Duffield, and Y. Wei. 2016a. “Relationships among risk management, partnering, and contractor capability in international EPC project delivery.” J. Manage. Eng. 32 (6): 04016017. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000459.
Wang, T., W. Tang, D. Qi, W. Shen, and M. Huang. 2016b. “Enhancing design management by partnering in delivery of international EPC projects: Evidence from Chinese construction companies.” J. Constr. Eng. Manage. 142 (4): 04015099. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001082.
WorldData. 2020. “Energy consumption in Uganda.” Accessed July 3, 2020. https://www.worlddata.info/africa/uganda/energy-consumption.php.
Wu, L., G. Jia, and N. Mackhaphonh. 2019. “Case study on improving the effectiveness of public participation in public infrastructure megaprojects.” J. Constr. Eng. Manage. 145 (4): 05019003. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001623.
Yap, J. B. H., I. N. Chow, and K. Shavarebi. 2019. “Criticality of construction industry problems in developing countries: Analyzing Malaysian projects.” J. Manage. Eng. 35 (5): 04019020. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000709.
Yin, R. K. 2013. Case study research: Design and methods. London: SAGE.
Yuan, Z., Z. Zhang, G. Ni, C. Chen, W. Wang, and J. Hong. 2020. “Cause analysis of hindering on-site lean construction for prefabricated buildings and corresponding organizational capability evaluation.” Adv. Civ. Eng. 2020 (2): 1–16. https://doi.org/10.1155/2020/8876102.
Zhang, S., F. Pan, C. Wang, Y. Sun, and H. Wang. 2017. “BIM-based collaboration platform for the management of EPC projects in hydropower engineering.” J. Constr. Eng. Manage. 143 (12): 04017087. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001403.
Zhu, L., S. O. Cheung, X. Gao, Q. Li, and G. Liu. 2020. “Success DNA of a record-breaking megaproject.” J. Constr. Eng. Manage. 146 (8): 05020009. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001878.

Information & Authors

Information

Published In

Go to Journal of Management in Engineering
Journal of Management in Engineering
Volume 38Issue 6November 2022

History

Received: Jan 24, 2022
Accepted: May 20, 2022
Published online: Jul 20, 2022
Published in print: Nov 1, 2022
Discussion open until: Dec 20, 2022

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Harrison E. Mutikanga [email protected]
Chief Executive Officer, Uganda Electricity Generation Company Limited, Plot 6-9 Okot Close Bukoto, P.O. Box 75831, Kampala, Uganda. Email: [email protected]
Mohamad Abdul Nabi, S.M.ASCE [email protected]
Ph.D. Candidate, Dept. of Civil, Architectural, and Environmental Engineering, Missouri Univ. of Science and Technology, Rolla, MO 65409. Email: [email protected]
Gasser G. Ali, S.M.ASCE [email protected]
Ph.D. Candidate, Dept. of Civil, Architectural, and Environmental Engineering, Missouri Univ. of Science and Technology, 218 Butler-Carlton Hall, 1401 N. Pine St., Rolla, MO 65409. Email: [email protected]
Hurst-McCarthy Professor of Construction Engineering and Management, Professor of Civil Engineering, and Founding Director of Missouri Consortium for Construction Innovation, Dept. of Civil, Architectural, and Environmental Engineering and Dept. of Engineering Management and Systems Engineering, Missouri Univ. of Science and Technology, Rolla, MO 65409 (corresponding author). ORCID: https://orcid.org/0000-0002-7306-6380. Email: [email protected]
Aubrie Caldwell [email protected]
Undergraduate Student, Dept. of Civil, Architectural, and Environmental Engineering, Missouri Univ. of Science and Technology, 215 Butler-Carlton Hall, 1401 N. Pine St., Rolla, MO 65409. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

  • Forensic Investigations of Concrete Degradation: Case Study of a Hydropower Project, Journal of Performance of Constructed Facilities, 10.1061/JPCFEV.CFENG-4566, 38, 1, (2024).
  • Multifunctional Analysis of Construction Contracts Using a Machine Learning Approach, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-5604, 40, 2, (2024).
  • Comprehensive Understanding of Factors Impacting Competitive Construction Bidding, Journal of Construction Engineering and Management, 10.1061/JCEMD4.COENG-14090, 150, 4, (2024).
  • Data-Driven Analysis of Progressive Design Build in Water and Wastewater Infrastructure Projects, Journal of Construction Engineering and Management, 10.1061/JCEMD4.COENG-13824, 150, 1, (2024).
  • Performance of Chinese International Contractors in Sub-Saharan Africa: Evidence from Uganda, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-5167, 39, 3, (2023).
  • A Contingency Model of Strategic Responses to the Institutional Challenges in Emerging Countries: Evidence and Findings from Least Developed Countries, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-5102, 39, 4, (2023).

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share