Key Dimensions of the Technical Readiness of Small Construction Businesses That Determine Their Intention to Use ICTs
Publication: Journal of Management in Engineering
Volume 38, Issue 6
Abstract
While information communication technologies (ICTs) have the potential to significantly improve construction project outcomes for small builders, their take up is relatively poor as they often face severe resource constraints. Previous construction studies have examined a range of adoption determinants, but there has been no previous research into how much small construction businesses’ readiness to use ICTs predicts their intention to use ICTs—readiness being assessed by reviewing the business management’s beliefs about ICTs, which are argued herein to have an important influence on the use of ICTs. The widely validated technology readiness (TR) model is used to test four hypotheses concerning the relationship between small builders’ readiness and intention to use ICTs in project management. Data from an online survey of 110 small Australian builders were analyzed, with six semi-structured expert interviews later conducted to help validate and interpret the results and provide some context-specific interpretation of the quantitative results. The main finding is that the readiness dimensions of optimism, innovativeness, and insecurity are key determinants of small construction businesses’ intention to use ICTs. Thus, this study shows that the use of ICTs is largely dependent on management’s beliefs about their benefits and the risks involved. This is particularly significant, because small businesses contribute a large proportion of industry output.
Get full access to this article
View all available purchase options and get full access to this article.
Data Availability Statement
Some or all data, models, or code that support the findings of this study are available from the corresponding author upon reasonable request.
References
Abedi, M., M. S. Fathi, and S. Rawai. 2012. “Cloud computing technology for collaborative information system in construction industry.” In Proc., 18th Int. Business Information Management Association Conf. Innovation and Sustainable Competitive Advantage: From Regional Development to World Economies. Istanbul, Turkey: International Business Information Management Association.
Aboelmaged, M. G. 2014. “Predicting e-readiness at firm-level: An analysis of technological, organizational and environmental (TOE) effects on e-maintenance readiness in manufacturing firms.” Int. J. Inf. Manage. 34 (5): 639–651. https://doi.org/10.1016/j.ijinfomgt.2014.05.002.
Adam, V., P. Manu, A. M. Mahamadu, K. Dziekonski, E. Kissi, F. Emuze, and S. Lee. 2021. “Building information modelling (BIM) readiness of construction professionals: The context of the Seychelles construction industry.” J. Eng. Des. Technol. 20 (3): 823–840.
Ahuja, V., J. Yang, and R. Shankar. 2009. “Study of ICT adoption for building project management in the Indian construction industry.” Autom. Constr. 18 (4): 415–423. https://doi.org/10.1016/j.autcon.2008.10.009.
Ahuja, V., J. Yang, and R. Shankar. 2010. “IT-enhanced communication protocols for building project management.” Eng. Constr. Archit. Manage. 17 (2): 159–179. https://doi.org/10.1108/09699981011024678.
Ajzen, I. 1991. “The theory of planned behavior.” Organ. Behav. Hum. Decis. Processes 50 (2): 179–211. https://doi.org/10.1016/0749-5978(91)90020-T.
Ajzen, I., and M. Fishbein. 1980. Understanding attitudes and predicting social behavior. Englewood Cliffs, NJ: Prentice-Hall.
Akunyumu, S., F. D. Fugar, and E. Adinyira. 2021. “An assessment of the readiness of construction firms for international construction joint ventures (ICJVs) using the VERDICT model.” J. Eng. Des. Technol. Preprint, https://doi.org/10.1108/JEDT-04-2021-0198.
Arashpour, M., Y. Bai, G. Aranda-mena, A. Bab-Hadiashar, R. Hosseini, and P. Kalutara. 2017. “Optimizing decisions in advanced manufacturing of prefabricated products: Theorizing supply chain configurations in off-site construction.” Autom. Constr. 84 (Dec): 146–153. https://doi.org/10.1016/j.autcon.2017.08.032.
Arashpour, M., A. Heidarpour, A. Akbar Nezhad, Z. Hosseinifard, N. Chileshe, and R. Hosseini. 2020. “Performance-based control of variability and tolerance in off-site manufacture and assembly: Optimization of penalty on poor production quality.” Construct. Manage. Econ. 38 (6): 502–514. https://doi.org/10.1080/01446193.2019.1616789.
Australian Bureau of Statistics. 2013. Private sector construction industry, Australia, 2011-2012. Canberra, Australia: Australian Bureau of Statistics.
Balaban-Ökten, B., and S. Gundes. 2018. “Knowledge management in small and medium architecture, engineering and construction firms in Turkey.” Electr. J. Knowl. Manage. 16 (2): 155–169.
Baron, R. M., and D. A. Kenny. 1986. “The moderator–mediator variable distinction in social psychological research: Conceptual, strategic, and statistical considerations.” J. Personality Social Psychol. 51 (6): 1173. https://doi.org/10.1037/0022-3514.51.6.1173.
Braglia, M., and M. Frosolini. 2014. “An integrated approach to implement Project management Information Systems within the Extended Enterprise.” Int. J. Project Manage. 32 (1): 18–29. https://doi.org/10.1016/j.ijproman.2012.12.003.
Cavka, H. B., S. Staub-French, and E. A. Poirier. 2017. “Developing owner information requirements for BIM-enabled project delivery and asset management.” Autom. Constr. 83 (Nov): 169–183. https://doi.org/10.1016/j.autcon.2017.08.006.
Chang, S.-I., S.-Y. Hung, D. C. Yen, and P.-J. Lee. 2010. “Critical factors of ERP adoption for small-and medium-sized enterprises: An empirical study.” J. Global Inf. Manage. 18 (3): 82–106. https://doi.org/10.4018/jgim.2010070104.
Chaurasia, S. S., and S. Verma. 2020. “Strategic determinants of big data analytics in the AEC sector: A multi-perspective framework.” Constr. Econ. Build. 20 (4): 63–81. https://doi.org/10.5130/AJCEB.v20i4.6649.
Chris, R. 2016. “Business statistics.” Accessed January 1, 2017. www.parliament.uk/commons-library.
Davis, F. D. 1989. “Perceived usefulness, perceived ease of use, and user acceptance of information technology.” MIS Q. 13 (3): 319–340. https://doi.org/10.2307/249008.
Eze, S. C., and V. C. Chinedu-Eze. 2018. “Examining information and communication technology (ICT) adoption in SMEs.” J. Enterprise Inf. Manage. 31 (Feb): 338–356. https://doi.org/10.1108/JEIM-12-2014-0125.
Forcada, N., M. Casals, X. Roca, and M. Gangolells. 2007. “Adoption of web databases for document management in SMEs of the construction sector in Spain.” Autom. Constr. 16 (4): 411–424. https://doi.org/10.1016/j.autcon.2006.07.011.
Froese, T. M. 2010. “The impact of emerging information technology on project management for construction.” Autom. Constr. 19 (5): 531–538. https://doi.org/10.1016/j.autcon.2009.11.004.
Fulford, R., and C. Standing. 2014. “Construction industry productivity and the potential for collaborative practice.” Int. J. Project Manage. 32 (2): 315–326. https://doi.org/10.1016/j.ijproman.2013.05.007.
Ghobakhloo, M., D. Arias-Aranda, and J. Benitez-Amado. 2011. “Adoption of e-commerce applications in SMEs.” Ind. Manage. Data Syst. 111 (8): 1238–1269. https://doi.org/10.1108/02635571111170785.
Goulding, J. S., and E. C. W. Lou. 2013. “E-readiness in construction: An incongruous paradigm of variables.” Archit. Eng. Des. Manage. 9 (4): 265–280. https://doi.org/10.1080/17452007.2013.775099.
Grandon, E. E., and J. M. Pearson. 2004. “Electronic commerce adoption: An empirical study of small and medium US businesses.” Inf. Manage. 42 (1): 197–216. https://doi.org/10.1016/j.im.2003.12.010.
Hadaya, P., and R. Pellerin. 2010. “Determinants of construction companies’ use of web-based interorganizational information systems.” Supply Chain Manage. Int. J. 15 (5): 371–384. https://doi.org/10.1108/13598541011068305.
Hardie, M., and G. Newell. 2011. “Factors influencing technical innovation in construction SMEs: An Australian perspective.” Eng. Constr. Archit. Manage. 18 (6): 618–636. https://doi.org/10.1108/09699981111180926.
Hwang, B. G., J. Ngo, and J. Z. K. Teo. 2022. “Challenges and strategies for the adoption of smart technologies in the construction industry: The case of Singapore.” J. Manage. Eng. 38 (1): 05021014. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000986.
Ifinedo, P. 2011. “An empirical analysis of factors influencing internet/e-business technologies adoption by SMEs in Canada.” Int. J. Inf. Technol. Decis. Making 10 (4): 731–766. https://doi.org/10.1142/S0219622011004543.
Jang, W., S. K. Lee, and S. H. Han. 2018. “Sustainable performance index for assessing the green technologies in urban infrastructure projects.” J. Manage. Eng. 34 (2): 04017056. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000582.
Jia, J., M. Zhang, and G. Yang. 2022. “Factors influencing BIM integration with emerging technologies: Knowledge coupling perspective.” J. Manage. Eng. 38 (2): 04022001. https://doi.org/10.1061/(ASCE)ME.1943-5479.0001018.
Keith, T. Z. 2019. Multiple regression and beyond: An introduction to multiple regression and structural equation modeling. New York: Routledge.
Kumar, A., and D. Ayedee. 2021. “Technology adoption: A solution for SMEs to overcome problems during COVID-19.” Acad. Market. Stud. J. 25 (1): 1–16.
Lam, P. T. I., F. W. H. Wong, and K. T. C. Tse. 2010. “Effectiveness of ICT for construction information exchange among multidisciplinary project teams.” J. Comput. Civ. Eng. 24 (4): 365–376. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000038.
Li, X., G. Q. Shen, P. Wu, H. Fan, H. Wu, and Y. Teng. 2018. “RBL-PHP: Simulation of lean construction and information technologies for prefabrication housing production.” J. Manage. Eng. 34 (2): 04017053. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000577.
Lin, C.-H., H.-Y. Shih, and P. J. Sher. 2007. “Integrating technology readiness into technology acceptance: The TRAM model.” Psychol. Market. 24 (7): 641–657. https://doi.org/10.1002/mar.20177.
Lopez-Nicolas, C., and P. Soto-Acosta. 2010. “Analyzing ICT adoption and use effects on knowledge creation: An empirical investigation in SMEs.” Int. J. Inf. Manage. 30 (6): 521–528. https://doi.org/10.1016/j.ijinfomgt.2010.03.004.
Lu, Y., Y. Li, M. Skibniewski, Z. Wu, R. Wang, and Y. Le. 2015. “Information and communication technology applications in architecture, engineering, and construction organizations: A 15-year review.” J. Manage. Eng. 31 (1): A4014010. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000319.
Mayr, S., C. Mitter, A. Kücher, and C. Duller. 2021. “Entrepreneur characteristics and differences in reasons for business failure: Evidence from bankrupt Austrian SMEs.” J. Small Bus. Entrepreneurship 33 (5): 539–558. https://doi.org/10.1080/08276331.2020.1786647.
Mohanta, A., and S. Das. 2021. “Causal analysis of slow BIM adoption in Eastern India with a special focus on green building sector.” J. Inst. Eng. Ser. A 103 (Aug): 319–337. https://doi.org/10.1007/s40030-021-00561-w.
Mokhtariani, M., M. H. Sebt, and H. Davoudpour. 2017. “Characteristics of the construction industry from the marketing viewpoint: Challenges and solutions.” Civ. Eng. J. 3 (9): 701–714. https://doi.org/10.21859/cej-03097.
Montgomery, D. C., E. A. Peck, and G. G. Vining. 2021. Introduction to linear regression analysis. New York: Wiley.
Mudalige, D., N. A. Ismail, and M. A. Malek. 2019. “Exploring the role of individual level and firm level dynamic capabilities in SMEs’ internationalization.” J. Int. Entrepreneurship 17 (1): 41–74. https://doi.org/10.1007/s10843-018-0239-2.
Oh, J. C., S. J. Yoon, and N. Chung. 2014. “The role of technology readiness in consumers’ adoption of mobile internet services between South Korea and China.” Int. J. Mobile Commun. 12 (3): 229–248. https://doi.org/10.1504/IJMC.2014.061460.
Parasuraman, A., and C. L. Colby. 2014. “An updated and streamlined technology readiness index: TRI 2.0.” J. Serv. Res. 18 (1): 59–74. https://doi.org/10.1177/1094670514539730.
Peansupap, V., and D. Walker. 2005a. “Exploratory factors influencing information and communication technology diffusion and adoption within Australian construction organizations: A micro analysis.” Constr. Innovation 5 (3): 135–157. https://doi.org/10.1108/14714170510815221.
Peansupap, V., and D. Walker. 2005b. “Factors affecting ICT diffusion: A case study of three large Australian construction contractors.” Eng. Constr. Archit. Manage. 12 (1): 21–37. https://doi.org/10.1108/09699980510576871.
Peansupap, V., and D. H. T. Walker. 2006. “Information communication technology (ICT) implementation constraints: A construction industry perspective.” Eng. Constr. Archit. Manage. 13 (4): 364–379. https://doi.org/10.1108/09699980610680171.
Phung, Q., and N. Tong. 2021. “Developing an organizational readiness framework for BIM implementation in large design companies.” Int. J. Sustainable Constr. Eng. Technol. 12 (3): 57–67.
Productivity Commission. 2013. “Regulator engagement with small business.” In Research report, edited by Productivity Commission. Canberra, Australia: Productivity Commission.
Ramayah, T., M. Jantan, R. M. Roslin, and R. Siron. 2003. “Technology readiness of owners/managers of SME’s.” Int. J. Knowl. Culture Change Manage. 3 (1): 475–486.
Rodgers, C., M. R. Hosseini, N. Chileshe, and R. Rameezdeen. 2015. “Building information modelling (BIM) within the Australian construction related small and medium sized enterprises: Awareness, practices and drivers.” In Proc., 31st Annual Association of Researchers in Construction Management Conf., ARCOM 2015, 691–700. Reading, England: ARCOM.
Ruikar, K., C. J. Anumba, and P. M. Carrillo. 2006. “VERDICT—An e-readiness assessment application for construction companies.” Autom. Constr. 15 (1): 98–110. https://doi.org/10.1016/j.autcon.2005.02.009.
Saka, A. B., and D. W. Chan. 2020. “Profound barriers to building information modelling (BIM) adoption in construction small and medium-sized enterprises (SMEs): An interpretive structural modelling approach.” Constr. Innovation 20 (2): 261–284. https://doi.org/10.1108/CI-09-2019-0087.
Samuelson, O., and B.-C. Björk. 2014. “A longitudinal study of the adoption of IT technology in the Swedish building sector.” Autom. Constr. 37 (Jan): 182–190. https://doi.org/10.1016/j.autcon.2013.10.006.
Scupola, A. 2009. “SME’s e-commerce adoption: Perspectives from Denmark and Australia.” J. Enterprise Inf. Manage. 22 (1–2): 152–166. https://doi.org/10.1108/17410390910932803.
Seens, D. 2015. SME operating performance. Technical Rep. Ottawa: Small Business Branch, Research and Analysis Directorate, Industry Canada.
Sepasgozar, S. M., S. R. Davis, H. Li, and X. Luo. 2018. “Modeling the implementation process for new construction technologies: Thematic analysis based on Australian and US practices.” J. Manage. Eng. 34 (3): 05018005. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000608.
Shelton, J., I. Martek, and C. Chen. 2016. “Implementation of innovative technologies in small-scale construction firms: Five Australian case studies.” Eng. Constr. Archit. Manage. 23 (2): 177–191. https://doi.org/10.1108/ECAM-01-2015-0006.
Siebert, S., and J. Teizer. 2014. “Mobile 3D mapping for surveying earthwork using an Unmanned Aerial Vehicle (UAV).” Autom. Constr. 41 (May): 1–14. https://doi.org/10.1016/j.autcon.2014.01.004.
Soto-Acosta, P., S. Popa, and I. Martinez-Conesa. 2018. “Information technology, knowledge management and environmental dynamism as drivers of innovation ambidexterity: A study in SMEs.” J. Knowl. Manage. 22 (4): 824–849. https://doi.org/10.1108/JKM-10-2017-0448.
Stratman, J. K., and A. V. Roth. 2002. “Enterprise resource planning (ERP) competence constructs: Two-stage multi-item scale development and validation.” Decis. Sci. 33 (4): 601–628. https://doi.org/10.1111/j.1540-5915.2002.tb01658.x.
Temel, S., and S. Durst. 2020. “Knowledge risk prevention strategies for handling new technological innovations in small businesses.” VINE J. Inf. Knowl. Manage. Syst. 51 (4): 655–673. https://doi.org/10.1108/VJIKMS-10-2019-0155.
The Australian Small Business and Family Enterprise Ombudsman. 2020. “Small business counts report (2020).” Accessed June 28, 2022. https://asbfeo.gov.au/sites/default/files/2021-11/ASBFEO%20Small%20Business%20Counts%20Dec%202020%20v2_0.pdf.
Thorpe, D., N. Ryan, and M. B. Charles. 2009. “Innovation and small residential builders: An Australian study.” Constr. Innovation Inf. Process Manage. 9 (2): 184–200. https://doi.org/10.1108/14714170910950821.
Tran, Q., D. Huang, B. Liu, and H. M. Ekram. 2011. “A construction enterprise’s readiness level in implementing e-procurement: A system engineering assessment model.” Syst. Eng. Procedia 2 (Jan): 131–141. https://doi.org/10.1016/j.sepro.2011.10.016.
Van der Vlist, A. J., M. H. Vrolijk, and G. P. M. R. Dewulf. 2014. “On information and communication technology and production cost in construction industry: Evidence from the Netherlands.” Construct. Manage. Econ. 32 (6): 641–651. https://doi.org/10.1080/01446193.2014.911932.
Venkatesh, V., M. G. Morris, G. B. Davis, and F. D. Davis. 2003. “User acceptance of information technology: Toward a unified view.” MIS Q. 27 (2): 425–478. https://doi.org/10.2307/30036540.
Vitkauskaite, E., and R. Gatautis. 2008. “E-procurement perspectives in construction sector SMEs.” J. Civ. Eng. Manage. 14 (4): 287–294. https://doi.org/10.3846/1392-3730.2008.14.28.
Walczuch, R., J. Lemmink, and S. Streukens. 2007. “The effect of service employees’ technology readiness on technology acceptance.” Inf. Manage. 44 (2): 206–215. https://doi.org/10.1016/j.im.2006.12.005.
Yeo, C. J., J. H. Yu, and Y. Kang. 2020. “Quantifying the effectiveness of IoT technologies for accident prevention.” J. Manage. Eng. 36 (5): 04020054. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000825.
Information & Authors
Information
Published In
Copyright
© 2022 American Society of Civil Engineers.
History
Received: Jan 6, 2022
Accepted: May 5, 2022
Published online: Jul 19, 2022
Published in print: Nov 1, 2022
Discussion open until: Dec 19, 2022
ASCE Technical Topics:
- Business management
- Business organizations
- Commercial construction
- Computer networks
- Computing in civil engineering
- Construction engineering
- Construction industry
- Construction management
- Data analysis
- Engineering fundamentals
- Internet
- Methodology (by type)
- Organizations
- Practice and Profession
- Project management
- Research methods (by type)
- Small business
- Validation
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.
Cited by
- Ying Wang, Jinying Xu, Junying Liu, Yunong Li, Turning Pressure into Power: The Configuration Effect of Antecedents on the Digital Transformation of Engineering Enterprises, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-5636, 40, 1, (2024).
- Jianglin Gu, Feng Guo, Promoting Digital Sustainability through Project Digital Responsibility Implementation: An Empirical Analysis, Journal of Construction Engineering and Management, 10.1061/JCEMD4.COENG-13944, 150, 3, (2024).