Technical Papers
Apr 27, 2022

A Proactive Risk Assessment Framework to Maximize Schedule Benefits of Modularization in Construction Projects

Publication: Journal of Construction Engineering and Management
Volume 148, Issue 7

Abstract

Various studies developed models and decision support tools to assess the feasibility and optimize the use of modularization. However, none has explored the schedule benefits of modular construction. This paper fills this knowledge gap. To this end, the authors completed the following: (1) analyzed the criticalities of the various modular risk factors on potential schedule savings using data collected from 48 industry professionals, (2) investigated the schedule savings associated with the use of modularization using data collected from 68 modular construction projects, and (3) developed an interrelated assessment model to calculate the schedule savings of using modularization. The provided model was verified using extreme conditions, surprised behavior tests, and sensitivity analysis. Also, it was validated by industry experts. The results show that design and engineering issues, regulatory and organizational matters, and resources and technology aspects are among the top parameters affecting schedule savings of modularized construction projects. This research adds to the body of knowledge by developing a decision-making benchmark that can assist project stakeholders in making proactive decisions, suitable mitigating strategies, and early corrective actions to ensure maximized capitalization on the schedule benefits of modularization in the construction industry.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

All data, models, and code generated or used during the study appear in the published article.

References

Abdul Nabi, M., and I. H. El-adaway. 2020. “Modular construction: Determining decision-making factors and future research needs.” J. Manage. Eng. 36 (6): 04020085. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000859.
Abdul Nabi, M., and I. H. El-adaway. 2021. “Understanding the key risks affecting cost and schedule performance of modular construction projects.” J. Manage. Eng. 37 (4): 04021023. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000917.
Abotaleb, I. S., I. H. El-adaway, M. W. Ibrahim, A. S. Hanna, and J. S. Russell. 2020. “Developing a rating score for out-of-sequence construction.” J. Manage. Eng. 36 (3): 04020013. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000765.
AbouRizk, S. M., and D. W. Halpin. 1992. “Statistical properties of construction duration data.” J. Constr. Eng. Manage. 118 (3): 525–544. https://doi.org/10.1061/(ASCE)0733-9364(1992)118:3(525).
Altaf, M. S., A. Bouferguene, H. Liu, M. Al-Hussein, and H. Yu. 2018. “Integrated production planning and control system for a panelized home prefabrication facility using simulation and RFID.” Autom. Constr. 85 (Jan): 369–383. https://doi.org/10.1016/j.autcon.2017.09.009.
Arashpour, M., B. Abbasi, M. Arashpour, M. R. Hosseini, and R. Yang. 2017. “Integrated management of on-site, coordination and off-site uncertainty: Theorizing risk analysis within a hybrid project setting.” Int. J. Project Manage. 35 (4): 647–655. https://doi.org/10.1016/j.ijproman.2017.02.016.
Arif, M., and C. Egbu. 2010. “Making a case for offsite construction in China.” Eng. Constr. Archit. Manage. 17 (6): 536–548. https://doi.org/10.1108/09699981011090170.
Assaad, R., I. H. El-adaway, and I. S. Abotaleb. 2020. “Predicting project performance in the construction industry.” J. Constr. Eng. Manage. 146 (5): 04020030. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001797.
Attalla, M., T. Hegazy, and R. Haas. 2003. “Reconstruction of the building infrastructure: two performance prediction models.” J. Infrastruct. Syst. 9 (1): 26–34. https://doi.org/10.1061/(ASCE)1076-0342(2003)9:1(26).
Babar, S., M. J. Thaheem, and B. Ayub. 2017. “Estimated cost at completion: Integrating risk into earned value management.” J. Constr. Eng. Manage. 143 (3): 04016104. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001245.
Baqerin, M. H., Y. Shafahi, and H. Kashani. 2016. “Application of Weibull analysis to evaluate and forecast schedule performance in repetitive projects.” J. Constr. Eng. Manage. 142 (2): 04015058. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001040.
Bartlett, J. E., J. W. Kotrlik, and C. C. Higgins. 2001. “Organizational research: Determining appropriate sample size in survey research.” Bus. Educ. Index 191: 43–50.
Bertram, N., S. Fuchs, J. Mischke, R. Palter, G. Strube, and J. Woetzel. 2019. “Modular construction: From projects to products.” In Capital projects and infrastructure, 1–34. Rosemont, IL: McKinsey and Company.
Boyadzhieva-Georgieva, S. 2014. “A method for choosing a project’s planned value curve by integrating earned value and risk management.” Econ. Altern. 2: 89–97.
Carriker, M., and S. Langar. 2014. Factors affecting large scale modular construction projects, 8. Windsor, ON, Canada: Associated Schools of Construction.
Chatterjee, C., E. Flugman, F. Jiang, P. Mozumder, and A. G. Chowdhury. 2019. “Insights from a stated preference experiment of Florida residents: Role of information and incentives in hurricane risk mitigation.” Nat. Hazards Rev. 20 (1): 04018029. https://doi.org/10.1061/(ASCE)NH.1527-6996.0000316.
Choi, J., and H. Song. 2014. “Evaluation of the modular method for industrial plant construction projects.” Int. J. Constr. Manage. 14 (3): 171–180. https://doi.org/10.1080/15623599.2014.922728.
Choi, J. O., J. T. O’Connor, and T. W. Kim. 2016. “Recipes for cost and schedule successes in industrial modular projects: Qualitative comparative analysis.” J. Constr. Eng. Manage. 142 (10): 04016055. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001171.
Choi, J. O., J. T. O’Connor, Y. H. Kwak, and B. K. Shrestha. 2019. “Modularization business case analysis model for industrial projects.” J. Manage. Eng. 35 (3): 04019004. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000683.
Choi, J. O., B. K. Shrestha, Y. H. Kwak, and J. S. Shane. 2020. “Innovative technologies and management approaches for facility design standardization and modularization of capital projects.” J. Manage. Eng. 36 (5): 04020042. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000805.
CII (Construction Industry Institute). 2011. Transforming modular construction for the competitive advantage through the adaptation of shipbuilding production processes to construction. Austin, TX: Univ. of Texas at Austin.
CII (Construction Industry Institute). 2014. Industrial modularization: Five solution elements. Austin, TX: CII.
Cochran, W. G. 1977. Sampling techniques. 3rd ed. New York: Wiley.
Dutta, S., and J. M. C. Kishen. 2020. “Mesoscale analysis of fatigue damage through aggregate–mortar bond cracks in cementitious composites.” J. Eng. Mech. 146 (2): 04019126. https://doi.org/10.1061/(ASCE)EM.1943-7889.0001706.
Enshassi, M. S. A., S. Walbridge, J. S. West, and C. T. Haas. 2019. “Integrated risk management framework for tolerance-based mitigation strategy decision support in modular construction projects.” J. Manage. Eng. 35 (4): 05019004. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000698.
Enshassi, M. S. A., S. Walbridge, J. S. West, and C. T. Haas. 2020. “Dynamic and proactive risk-based methodology for managing excessive geometric variability issues in modular construction projects using Bayesian theory.” J. Constr. Eng. Manage. 146 (2): 04019096. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001747.
Fellows, R. F., and A. M. Liu. 2015. Research methods for construction. New York: Wiley.
Fisher, D. J., and M. J. Skibniewski. 1992. Computerized decision support for modularization of industrial construction. Austin, TX: Univ. of Texas at Austin.
Geisser, S., and W. O. Johnson. 2006. Modes of parametric statistical inference. New York: Wiley.
Gupta, U. G. 1991. Validating and verifying knowledge-based systems. New York: IEEE.
Haddad, K., and A. Rahman. 2011. “Selection of the best fit flood frequency distribution and parameter estimation procedure: A case study for Tasmania in Australia.” Stochastic Environ. Res. Risk Assess. 25 (3): 415–428. https://doi.org/10.1007/s00477-010-0412-1.
Hatamleh, M. T., M. Hiyassat, G. J. Sweis, and R. J. Sweis. 2018. “Factors affecting the accuracy of cost estimate: Case of Jordan.” Eng. Constr. Archit. Manage. 25 (1): 113–131. https://doi.org/10.1108/ECAM-10-2016-0232.
Heravi, G., and A. Jafari. 2014. “Cost of quality evaluation in mass-housing projects in developing countries.” J. Constr. Eng. Manage. 140 (5): 04014004. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000837.
Hong, T., K. Cho, C. Hyun, and S. Han. 2011. “Simulation-based schedule estimation model for ACS-based core wall construction of high-rise building.” J. Constr. Eng. Manage. 137 (6): 393–402. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000300.
Hu, Y., A. P. Chan, Y. Le, Y. Xu, and M. Shan. 2016. “Developing a program organization performance index for delivering construction megaprojects in China: Fuzzy synthetic evaluation analysis.” J. Manage. Eng. 32 (4): 05016007. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000432.
Hwang, B.-G., M. Shan, and K.-Y. Looi. 2018. “Knowledge-based decision support system for prefabricated prefinished volumetric construction.” Autom. Constr. 94 (Oct): 168–178. https://doi.org/10.1016/j.autcon.2018.06.016.
Idowu, O. S., and K. C. Lam. 2020. “Conceptual quantities estimation using bootstrapped support vector regression models.” J. Constr. Eng. Manage. 146 (4): 04020018. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001780.
IPRA (Integrated Project Risk Assessment). 2013. “IR181-2-integratedproject risk assessment (IPRA), version 2.0.” Accessed September 13, 2020. https://www.construction-institute.org/resources/knowledgebase/knowledge-areas/risk-analysis-for-international-projects-(best-practice)/topics/rt-181/pubs/ir181-2.
Isaac, S., T. Bock, and Y. Stoliar. 2016. “A methodology for the optimal modularization of building design.” Autom. Constr. 65 (May): 116–124. https://doi.org/10.1016/j.autcon.2015.12.017.
Isidore, L. J., and W. E. Back. 2001. “Probabilistic optimal-cost scheduling.” J. Constr. Eng. Manage. 127 (6): 431–437. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:6(431).
Jaillon, L., and C.-S. Poon. 2010. “Design issues of using prefabrication in Hong Kong building construction.” Construct. Manage. Econ. 28 (10): 1025–1042. https://doi.org/10.1080/01446193.2010.498481.
Jang, S., and G. Lee. 2018. “Process, productivity, and economic analyses of BIM–based multi-trade prefabrication—A case study.” Autom. Constr. 89 (May): 86–98. https://doi.org/10.1016/j.autcon.2017.12.035.
Jarkas, A. M. 2016. “Predicting contract duration for building construction: Is Bromilow’s time-cost model a panacea?” J. Manage. Eng. 32 (1): 05015004. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000394.
Kakar, A. S., A. Hasan, and K. N. Jha. 2020. “Schedule success factors in construction projects in a war-affected region.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (3): 05020008. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000417.
Kamali, M., and K. Hewage. 2017. “Development of performance criteria for sustainability evaluation of modular versus conventional construction methods.” J. Cleaner Prod. 142 (Jan): 3592–3606. https://doi.org/10.1016/j.jclepro.2016.10.108.
Keizur, A. E., and W. J. Roberds. 2021. “Evolution of risk-based cost and schedule estimates for North American infrastructure projects: What have we learned?” In Proc., Int. Conf. on Transportation and Development 2021, 145–156. Reston, VA: ASCE.
Khalili, A., and D. K. Chua. 2013. “IFC-based framework to move beyond individual building elements toward configuring a higher level of prefabrication.” J. Comput. Civ. Eng. 27 (3): 243–253. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000203.
Koch, C. 2012. “Contested overruns and performance of offshore wind power plants.” Construct. Manage. Econ. 30 (8): 609–622. https://doi.org/10.1080/01446193.2012.687830.
Laio, F., G. Di Baldassarre, and A. Montanari. 2009. “Model selection techniques for the frequency analysis of hydrological extremes.” Water Resour. Res. 45 (7): W07416. https://doi.org/10.1029/2007WR006666.
Larsson, J., P. E. Eriksson, T. Olofsson, and P. Simonsson. 2014. “Industrialized construction in the Swedish infrastructure sector: Core elements and barriers.” Construct. Manage. Econ. 32 (1–2): 83–96. https://doi.org/10.1080/01446193.2013.833666.
Lee, J., and H. Hyun. 2019. “Multiple modular building construction project scheduling using genetic algorithms.” J. Constr. Eng. Manage. 145 (1): 04018116. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001585.
Lee, S. H., S. R. Thomas, and R. L. Tucker. 2004. “Effective practice utilization using performance prediction software.” J. Constr. Eng. Manage. 130 (4): 576–585. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:4(576).
Leon, H., H. Osman, M. Georgy, and M. Elsaid. 2018. “System dynamics approach for forecasting performance of construction projects.” J. Manage. Eng. 34 (1): 04017049. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000575.
Li, N., D. Fang, and Y. Sun. 2016. “Cognitive psychological approach for risk assessment in construction projects.” J. Manage. Eng. 32 (2): 04015037. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000397.
Li, Y., K. Lu, and Y. Lu. 2017. “Project schedule forecasting for skyscrapers.” J. Manage. Eng. 33 (3): 05016023. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000498.
Ling, F. Y., S. P. Low, S. Wang, and T. Egbelakin. 2008. “Models for predicting project performance in China using project management practices adopted by foreign AEC firms.” J. Constr. Eng. Manage. 134 (12): 983–990. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:12(983).
Ling, F. Y. Y., S. L. Chan, E. Chong, and L. P. Ee. 2004. “Predicting performance of design-build and design-bid-build projects.” J. Constr. Eng. Manage. 130 (1): 75–83. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:1(75).
Liu, J., and M. Lu. 2019. “Robust dual-level optimization framework for resource-constrained multiproject scheduling for a prefabrication facility in construction.” J. Comput. Civ. Eng. 33 (2): 04018067. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000816.
Manfreda, K. L., M. Bosnjak, J. Berzelak, I. Haas, and V. Vehovar. 2008. “Web surveys versus other survey modes: A meta-analysis comparing response rates.” Int. J. Market Res. 50 (1): 79–104. https://doi.org/10.1177/147078530805000107.
Marle, F., and L. A. Vidal. 2016. Managing complex, high-risk projects. London: Springer.
Moghadam, M., A. Alwisy, and M. Al-Hussein. 2012. “Integrated BIM/lean base production line schedule model for modular construction manufacturing.” In Proc., Construction Research Congress 2012, 1271–1280. Reston, VA: ASCE.
Mortaji, S. T. H., R. Noorossana, and M. Bagherpour. 2015. “Project completion time and cost prediction using change point analysis.” J. Manage. Eng. 31 (5): 04014086. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000329.
Murtaza, M. B., and D. J. Fisher. 1994. “Neuromodex—Neural network system for modular construction decision making.” J. Comput. Civ. Eng. 8 (2): 221–233. https://doi.org/10.1061/(ASCE)0887-3801(1994)8:2(221).
Nadim, W., and J. S. Goulding. 2011. “Offsite production: A model for building down barriers: A European construction industry perspective.” Eng. Constr. Archit. Manage. 18 (1): 82–101. https://doi.org/10.1108/09699981111098702.
Nair, R. S., and R. Agrawal. 2021. “An integrated approach of conventional and deep learning method for underwater image enhancement.” In Proc., Soft Computing for Intelligent Systems, 177–194. Singapore: Springer.
Nasir, M. K., and B. H. W. Hadikusumo. 2019. “System dynamics model of contractual relationships between owner and contractor in construction projects.” J. Manage. Eng. 35 (1): 04018052. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000666.
NIST/SEMATECH. 2018. “e-handbook of statistical methods.” Accessed December 12, 2020. https://www.itl.nist.gov/div898/handbook/.
O’Connor, J. T., W. J. O’Brien, and J. O. Choi. 2014. “Critical success factors and enablers for optimum and maximum industrial modularization.” J. Constr. Eng. Manage. 140 (6): 04014012. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000842.
O’Connor, J. T., W. J. O’Brien, and J. O. Choi. 2015. “Standardization strategy for modular industrial plants.” J. Constr. Eng. Manage. 141 (9): 04015026. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001001.
Palisade. 2019. “RISK for risk analysis.” Accessed November 17, 2020. http://www.palisade.com/risk/.
Pan, W., and R. Sidwell. 2011. “Demystifying the cost barriers to offsite construction in the UK.” Construct. Manage. Econ. 29 (11): 1081–1099. https://doi.org/10.1080/01446193.2011.637938.
Patel, D. A., and K. N. Jha. 2016. “Structural equation modeling for relationship-based determinants of safety performance in construction projects.” J. Manage. Eng. 32 (6): 05016017. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000457.
Peng, Y., Y. Shi, H. Yan, and J. Zhang. 2020. “Multivariate frequency analysis of annual maxima suspended sediment concentrations and floods in the Jinsha River, China.” J. Hydrol. Eng. 25 (9): 05020029. https://doi.org/10.1061/(ASCE)HE.1943-5584.0001977.
Rahman, M. M. 2014. “Barriers of implementing modern methods of construction.” J. Manage. Eng. 30 (1): 69–77. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000173.
Rajsekhar, D., V. P. Singh, and A. K. Mishra. 2015. “Hydrologic drought atlas for Texas.” J. Hydrol. Eng. 20 (7): 05014023. https://doi.org/10.1061/(ASCE)HE.1943-5584.0001074.
Rausch, C., M. Nahangi, C. Haas, and W. Liang. 2019. “Monte Carlo simulation for tolerance analysis in prefabrication and offsite construction.” Autom. Constr. 103 (Jul): 300–314. https://doi.org/10.1016/j.autcon.2019.03.026.
Said, H. 2015. “Prefabrication best practices and improvement opportunities for electrical construction.” J. Constr. Eng. Manage. 141 (12): 04015045. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001018.
Sakka, Z. I., and S. M. El-Sayegh. 2007. “Float consumption impact on cost and schedule in the construction industry.” J. Constr. Eng. Manage. 133 (2): 124–130. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:2(124).
Santos, J. R. A. 1999. “Cronbach’s alpha: A tool for assessing the reliability of scales.” J. Extension 37 (2): 1–5.
Shahtaheri, M., C. T. Haas, and T. Salimi. 2016. “A stochastic simulation approach for the integration of risk and uncertainty into megaproject cost and schedule estimates.” In Proc., Construction Research Congress 2016, 607–615. Reston, VA: ASCE.
Shen, L. Y., G. W. C. Wu, and C. S. K. Ng. 2001. “Risk assessment for construction joint ventures in China.” J. Constr. Eng. Manage. 127 (1): 76–81. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:1(76).
Song, J., W. R. Fagerlund, C. T. Haas, C. B. Tatum, and J. A. Vanegas. 2005. “Considering prework on industrial projects.” J. Constr. Eng. Manage. 131 (6): 723–733. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:6(723).
Taghaddos, H., U. Hermann, S. AbouRizk, and Y. Mohamed. 2014. “Simulation-based multiagent approach for scheduling modular construction.” J. Comput. Civ. Eng. 28 (2): 263–274. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000262.
Tam, V., K. Le, and H. Le. 2008. “Using Gaussian and hyperbolic distributions for quality improvement in construction: Case study approach.” J. Constr. Eng. Manage. 134 (7): 555–561. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:7(555).
Tam, V. W. Y., and J. J. L. Hao. 2014. “Prefabrication as a mean of minimizing construction waste on site.” Int. J. Constr. Manage. 14 (2): 113–121. https://doi.org/10.1080/15623599.2014.899129.
Tan, Y., L. Shen, L. Craig, W. Lu, and M. C. H. Yam. 2014. “Critical success factors for building maintenance business: A Hong Kong case study.” Facilities 32 (5–6): 208–225. https://doi.org/10.1108/F-08-2012-0062.
Tatum, C. B., J. A. Vanegas, and J. M. Williams. 1987. Constructability improvement using prefabrication, preassembly, and modularization. Austin, TX: Construction Industry Institute.
Uslu, B., S. K. Sinha, S. Ge, and R. Yadav. 2013. “A validation and verification framework for robust drinking water pipeline model prediction models.” In Proc., Pipelines 2013: Pipelines and trenchless construction and renewals—A global perspective, 1246–1256. Reston, VA: ASCE.
Velamati, S. 2012. “Feasibility, benefits and challenges of modular construction in high rise development in the United States: A developer’s perspective.” Ph.D. dissertation, Center for Real Estate Program in Real Estate Development, Massachusetts Institute of Technology.
Vose, D. 1996. Quantitative risk analysis: A guide to Monte Carlo simulation modelling. Chichester, UK: Wiley.
Wang, Z. Z., and B. Shi. 2013. “Decision making and economic analysis for accelerated bridge construction.” Appl. Mech. Mater. 423–426: 2178–2183.
Wong, P. S. P., C. Zwar, and E. Gharaie. 2017. “Examining the drivers and states of organizational change for greater use of prefabrication in construction projects.” J. Constr. Eng. Manage. 143 (7): 04017020. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001309.
Wu, C.-L., D.-P. Fang, P.-C. Liao, J.-W. Xue, Y. Li, and T. Wang. 2015. “Perception of corporate social responsibility: The case of Chinese international contractors.” J. Cleaner Prod. 107 (Nov): 185–194. https://doi.org/10.1016/j.jclepro.2015.04.143.
Zhang, Y., and I. Flood. 2014. “Planning and scheduling prefabrication construction projects using dependency structure matrix (DSM).” In Computing in Civil and Building Engineering, 1457–1464. Reston, VA: ASCE.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 148Issue 7July 2022

History

Received: Oct 26, 2021
Accepted: Mar 7, 2022
Published online: Apr 27, 2022
Published in print: Jul 1, 2022
Discussion open until: Sep 27, 2022

Permissions

Request permissions for this article.

Authors

Affiliations

Mohamad Abdul Nabi, S.M.ASCE [email protected]
Ph.D. Candidate, Dept. of Civil, Architectural, and Environmental Engineering, Missouri Univ. of Science and Technology, Rolla, MO 65409. Email: [email protected]
Hurst-McCarthy Professor of Construction Engineering and Management, Professor of Civil Engineering, and Founding Director of the Missouri Consortium of Construction Innovation, Dept. of Civil, Architectural, and Environmental Engineering and Dept. of Engineering Management and Systems Engineering, Missouri Univ. of Science and Technology, Rolla, MO 65409 (corresponding author). ORCID: https://orcid.org/0000-0002-7306-6380. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

  • Quantifying the Impact of Technology Utilization on Schedule and Cost Performance in Construction Projects, Journal of Construction Engineering and Management, 10.1061/JCEMD4.COENG-14679, 150, 8, (2024).
  • Studying Contribution of Associated Stakeholders in Risk Control of Modularized Construction under Different Project Delivery Methods: A Graph-Restricted Cooperative Games Approach, Computing in Civil Engineering 2023, 10.1061/9780784485231.027, (221-230), (2024).

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share