TECHNICAL PAPERS
Apr 1, 2002

Incorporating Practicability into Genetic Algorithm-Based Time-Cost Optimization

This article has a reply.
VIEW THE REPLY
This article has a reply.
VIEW THE REPLY
Publication: Journal of Construction Engineering and Management
Volume 128, Issue 2

Abstract

Optimization problems in construction scheduling, such as time-cost optimization, can be effectively solved using genetic algorithms (GAs). This paper presents an approach that makes GA-based time-cost optimization viable for real world problems. Practicability is incorporated through the integration of a project management system to the GA system. The approach takes advantage of the powerful scheduling functionality of the project management system in evaluating project completion dates during optimization. The approach ensures that all scheduling parameters, including activity relationships, lags, calendars, constraints, resources, and progress, are considered in determining the project completion date, thus allowing comprehensive and realistic evaluations to be made during optimization.

Get full access to this article

View all available purchase options and get full access to this article.

References

Chan, W. T., Chua, D. K. H., and Kannan, G., (1996). “Construction resource scheduling with genetic algorithms.” J. Constr. Eng. Manage., 122(2), 125–132.
Hunter, A. (1995). SUGAL programming manual, Sunderland, U.K.
Hunter, A. (1996). SUGAL user manual, Sunderland, U.K.
Li, H., and Love, P.(1997). “Using improved genetic algorithms to facilitate time-cost optimization.” J. Constr. Eng. Manage., 123(3), 233–237.
Primavera Project Planner (P3) planning and control guide. (1996a). Primavera Systems, Philadelphia.
Primavera Project Planner (P3) reference manual. (1996b). Primavera Systems, Philadelphia.
Satyanarayana, K., Rajeev, S., Kalidindi, S., and Kalyanaraman, V. (1993). “Optimum resource allocation in construction projects using genetic algorithms.” Proc., 3rd Int. Conf. on the Application of AI to Civil and Structural Engineering, Edinburgh, U.K., 17–19.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 128Issue 2April 2002
Pages: 139 - 143

History

Received: May 19, 2000
Accepted: Jun 15, 2001
Published online: Apr 1, 2002
Published in print: Apr 2002

Permissions

Request permissions for this article.

Authors

Affiliations

Bryan Christopher Que
Student, Dept. of Civil Engineering, De La Salle Univ., Manila, Philippines.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share