Reducing Variability to Improve Performance as a Lean Construction Principle
This article has a reply.
VIEW THE REPLYPublication: Journal of Construction Engineering and Management
Volume 128, Issue 2
Abstract
Variability is common on construction projects and must be managed effectively. New management thinking, like that of lean production, has suggested that better labor and cost performance can be achieved by reducing output variability. Efforts to utilize lean thinking in construction, so far, have generated limited evidence to support this claim. This paper investigates the relationship between variability and project performance to test the notion that reducing output variability will result in improved labor performance. Using productivity data from concrete formwork activities on multiple projects, various measures of output variability are tested against construction performance. It is shown that variability in output is inevitable and that there is little correlation between output variability and project performance, but that variability in labor productivity is closely correlated to project performance. It is concluded that lean improvement initiatives should be redirected to adaptable workforce management capabilities to reduce variability in labor productivity instead of output in order to improve project performance.
Get full access to this article
View all available purchase options and get full access to this article.
References
Ballard, G., and Howell, G. (1994). “Implementing lean construction: stabilizing work flow.” Proc., 2nd Annual Conf. of the Int. Group for Lean Construction, Santiago, Chile.
Ballard, G., and Howell, G. (1995). “Towards construction JIT.” Proc., 11th Annual ARCOM Conf., Association of Researchers in Construction Management, Reading, U.K., 338–346.
Ballard, G., and Howell, G.(1998). “Shielding production: an essential step in production control,” J. Constr. Eng. Manage., 124(1), 11–17.
Handa, V. K., and Rivers, D.(1983). “Downgrading construction incidents.” J. Constr. Eng. Manage., 109(2), 190–205.
Horman, M. J. (2000). “Process dynamics: buffer management in building project operations.” PhD thesis, Univ. of Melbourne, Melbourne, Australia.
Horman, M. J., and Kenley, R.(1998). “Process dynamics: identifying a strategy for the deployment of buffers in building projects.” Int. J. Logistics: Res. Appl., 1(3), 221–237.
Horner, R. M. W., and Talhouni, B. T. (1998). Effects of accelerated working, delays and disruption on labour productivity, The Chartered Institute of Building, London.
Howell, G., Laufer, A., and Ballard, G.(1993). “Interaction between subcycles: one key to improved methods.” J. Constr. Eng. Manage., 119(4), 714–728.
Howell, G., and Ballard, G. (1994). “Implementing lean construction: reducing inflow variation.” Proc., 2nd Annual Conf. of the Int. Group for Lean Construction, Santiago, Chile.
Koskela, L. (1992). “Application of the new production philosophy to construction.” Tech. Rep. No. 72, Center for Integrated Facility Engineering, Stanford Univ., Stanford, Calif.
Ohno, T. (1988). Toyota production system: beyond large-scale production, Productivity, Portland, Ore.
Sanders, S. R., and Thomas, H. R.(1991). “Factors affecting masonry-labor productivity.” J. Constr. Eng. Manage., 117(4), 626–644.
Sweis, G. J. (2000). “Impact of conversion technology on productivity in masonry construction.” PhD thesis, Northwestern Univ., Evanston, Ill.
Thomas, H. R.(1991). “Labor productivity and work sampling: the bottom line.” J. Constr. Eng. Manage., 117(3), 423–444.
Thomas, H. R. (2000). “Principles of construction labor productivity measurement and processing.” Rep. No. 2K14, Pennsylvania Transportation Institute, University Park, Pa.
Thomas, H. R., Maloney, W. F., Horner, R. M. W., Smith, G. R., Handa, V. K., and Sanders, S. R.(1990). “Modeling construction labor productivity.” J. Constr. Eng. Manage., 116(4), 705–726.
Thomas, H. R., Riley, D. R., and Sanvido, V. E.(1999). “Loss of labor productivity due to delivery methods and weather.” J. Constr. Eng. Manage., 125(1), 39–46.
Thomas, H. R., and Sanvido, V. E.(2000). “Role of the fabricator in labor productivity.” J. Constr. Eng. Manage., 126(5), 358–365.
Thomas, H. R., Sanvido, V. E., and Sanders, S. R.(1989). “Impact of material management on productivity—a case study.” J. Constr. Eng. Manage., 115(3), 370–384.
Thomas, H. R., and Smith, G. R. (1990). “Loss of construction labor productivity due to inefficiencies and disruptions: the weight of expert opinion.” Rep. No. 9019, Pennsylvania Transportation Institute, University Park, Pa.
Thomas, H. R., and Zavřski, I. (1998). “Theoretical model for international benchmarking of labor productivity.” Rep. No. 9913, Pennsylvania Transportation Institute, University Park, Pa.
Thomas, H. R., and Zavřski, I.(1999). “Construction baseline productivity: theory and practice.” J. Constr. Eng. Manage., 125(5), 295–303.
Tommelein, I. D.(1998). “Pull-driven scheduling for pipe-spool installation: simulation of lean construction technique.” J. Constr. Eng. Manage., 124(4), 279–288.
Tommelein, I. D., Riley, D. R., and Howell, G. A.(1999). “Parade game: impact of work flow variability on trade performance.” J. Constr. Eng. Manage., 125(5), 304–310.
Womack, J. P., and Jones, D. T. (1996). Lean thinking: banish waste and create wealth in your corporation, Simon and Shuster, New York.
Information & Authors
Information
Published In
Copyright
Copyright © 2002 American Society of Civil Engineers.
History
Received: Feb 9, 2001
Accepted: Apr 24, 2001
Published online: Apr 1, 2002
Published in print: Apr 2002
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.