The objective of this paper is to predict the tunnel advance rate in the construction of a several‐mile‐long, small‐diameter (3–3.5 m) tunnel in soft rock. For this purpose, the CYCLONE simulation system is used. Several simulation models are developed to investigate the effect of different variables on the tunnel advance rate. At first the suitable tunneling method, including the tunnel support and material handling system, is selected by reviewing similar projects completed in recent years. Various cycle times and durations, e.g., TBM penetration rate and train travel time, are carefully calculated, based on previous tunneling jobs. After specifying the construction method and duration times, the developed simulation models are described. The impact of each major variable on the tunnel advance rate is studied by sensitivity analysis. These variables include the TBM penetration rate, the train travel time, the number of muck trains, the type of rock, and the rock standup time. Simulation models quantify the effect of each of these variables on the tunnel advance rate.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
Asai, T. (1986). “Scheduling of the main collider tunnel of the SSC project by the CYCLONE simulation system,” report presented to the Dept. of Civil Engineering of the University of Colorado at Boulder, Colo., in partial fulfillment of the requirements for the Degree of Master of Science.
2.
Ball, G. J. (1981). “Rock tunneling for a rail transit system.” Proc. Rapid Excavation and Tunneling Conf., ASCE, Vol. 1.
3.
Budd, T. H., and Heinz, D. J. (1983). “Milwaukee's northeast side relief sewer system.” Proc. Rapid Excavation and Tunneling Conf., ASCE, Vol. 2, pp. 952–961.
4.
Cannon, D. E. (1967). “Record tunnel excavation with boring machines.” Civ. Engrg., ASCE, 37(8), 45–48.
5.
David, A. D., and Bradford, P. B. (1975). “Fifty‐year highlights of tunnel equipment.” J. Constr. Div., ASCE, Vol. 101(2), 265–280.
6.
Deere, D. U. (1978). “Current tunnel design, construction and research in the U.S.” Tunneling under difficult conditions, I. Kitamura, ed., Pergamon Press, Oxford, England, 61–66.
7.
Dietl, B., and Tarkoy, J. P. (1973). “A study of rock hardness and tunnel boring machine advance rates in Manhattan schist.” Tunneling Tech. Newsletter, U.S. National Committee on Tunneling Technology, Sep., 4–9.
8.
Faddick, R. R., and Martin, J. W. (1974). “Pneumatic‐hydraulic material transport system for the rapid excavation of machine‐bored tunnels.” Proc. Rapid Excavation and Tunneling Conf., ASCE, Vol. 1, 729–745.
9.
Halpin, D. W. (1973). “An investigation of the use of simulation networks for modeling construction operations,” thesis presented to the University of Illinois at Urbana, Ill., in partial fulfillment of the requirements for the degree of Doctor of Philosophy.
10.
Halpin, D. W. (1984). MicroCYCLONE user's manual for IBM‐PC computer. Georgia Institute of Technology, Atlanta, Ga.
11.
Halpin, D. W., and Woodhead, R. W. (1976). Design of construction and process operations. John Wiley and Sons, Inc., New York, N.Y.
12.
Irons, J., and Westfall, D. (1972). “Rock tunnels recently completed in Chicago.” Proc. Rapid Excavation and Tunneling Conf., ASCE, Vol. 2, 1063–1076.
13.
Jenkins, G. F., and Hobden, P. S., (1972). “Tunneling Toronto Canada.” Proc. Rapid Excavation and Tunneling Conf., ASCE, Vol. 2, 1017–1034.
14.
Lluch, J., and Halpin, D. W. (1982). “Construction operations and microcomputers.” J. Constr. Div., ASCE, Vol. 108(1), 129–146.
15.
“Machine team makes short work of a long tunnel.” (1971). Constr. Methods and Equipment, 53(1), 62–63.
16.
Martin, D. (1982). “Austrian tunnelers give Jarva a first in Europe.” Tunnels and tunneling, 14(1), 25–28.
17.
Martin, D. (1983). “Colorado foothills tunnel turns on the tape in Denver.” Tunnels and tunneling, 15(3), 20–21.
18.
Martin, D. (1985). “Power tunnel pushes TBM to its limits.” Tunnels and tunneling, 17(10), 47–49.
19.
Martin, D. (1986). “Tirolean TBM scores several ‘first’.” Tunnels and tunneling, 18(5), 20–23.
20.
Martin, T. E. (1979). “Tunnels and shafts, Roosevelt Road to Ogden Avenue.” Proc. Rapid Excavation and Tunneling Conf., ASCE, Vol. 2, 1635–1647.
21.
McCusker, T. G., and Dietl, B. (1979). “Small diameter tunnel in Manhattan schist.” Proc. Rapid Excavation and Tunneling Conf., ASCE, Vol. 1.
22.
Mixon, E. D., and Kennedy, D. J. (1979). “Chicago sewer system, tunnels and shafts—Addison to Wilmette.” Proc. Rapid Excavation and Tunneling Conf., ASCE, Vol. 2.
23.
Nelson, P. N., et al. (1984). “Tunnel boring machine performance study,” Report No. UMTA‐MA‐06‐0100‐84‐1, U.S. Dept. of Transportation, Urban Mass Transportation Admin., Washington, D.C.
24.
Fillip, Nestor M. (1974). “Material handling considerations in bored tunnels.” Proc. Rapid Excavation and Tunneling Conf., ASCE, Vol. 1, 457–479.
25.
Nunnally, S. W. (1977). Managing Construction Equipment. Prentice‐Hall, Inc., Englewood Cliffs, N.J.
26.
Parker, A. D., Barrie, D. S., and Snyder, R. M. (1984). Planning and estimating heavy construction. McGraw‐Hill Book Co., New York, N.Y.
27.
Peterson, E., and Frobenius, P. (1971). “Soft‐ground tunneling technology on the BART project.” Civ. Engrg., ASCE, 41(10), 72–76.
28.
Peurifoy, R. L., and Ledbetter, W. B. (1985). Construction planning, equipment and methods. McGraw‐Hill Book Co., New York, N.Y.
29.
“Precast segment lined bored tunnel.” (1977). Calif. Builder and Engr., September 23.
30.
Richardson, H. W., and Mayo, R. S. (1980). Practical tunnel driving. Printed by Robert S. Mayo, Lancaster, Pa.
31.
Riggs, L. S. (1980). “Simulation of construction operations.” J. Tech. Councils of ASCE, 106(TC1).
32.
Sture, S., Diekmann, J. E., and Yousef, A. (1985). SSC civil engineering task group report. Department of Civil Engineering, University of Colorado, Boulder, Colo.
33.
Super conducting super collider tunnel diameter working paper. (1984). Parsons, Brinckerhoff, Quade, and Douglas, Inc., New York, N.Y.
34.
Tardif, L. M. (1986). “Belting‐up to keep pace with speeding TBM.” Tunnel and Tunneling, 18(9), 21–24.
35.
Thon, J. G. (1982). “Tunnel boring machines.” Tunnel engineering handbook, Van Nostrand Reinhold Company, New York, N.Y.
36.
Wagner, D. L. (1979). “Modern tunneling with a tunnel boring machine.” Proc. Rapid Excavation and Tunneling Conf., ASCE, Vol. 1, 584–600.
37.
Wallis, S. (1983). “A modified TBM cuts through the rough and the smooth.” Tunnels and tunneling, 15(6), 56–58.
38.
Wallis, S. (1984). “TBM conquers Mosvik's hard rock.” Tunnels and tunneling, 16(4), 28–29.
39.
Wallis, S. (1984). “The tunnel that chose its own machine.” Tunnels and tunneling, 16(10), 43–46.
40.
Wallis, S. (1986). “Free flow for Hamburg's deep sewer siphon.” Tunnels and tunneling, 18(4), 35–38.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 113Issue 4December 1987
Pages: 554 - 568

History

Published online: Dec 1, 1987
Published in print: Dec 1987

Permissions

Request permissions for this article.

Authors

Affiliations

Ali Touran, Associate Member, ASCE
Asst. Prof., Dept. of Civ. Engrg., Northeastern Univ., Boston, MA 02115
Toshiyuki Asai
Engr., Taisei Constr. Co., Tokyo, Japan

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share