State-of-the-Art Reviews
Mar 27, 2024

A Synthesis of Literature on the Effects of COVID-19 on Construction Industry

Publication: Practice Periodical on Structural Design and Construction
Volume 29, Issue 3

Abstract

The construction industry has always been prone to uncertainties due to its dynamic nature, but the COVID-19 pandemic highlighted the need for a deeper understanding of its present challenges and their implications for the future of the industry. Despite numerous studies conducted on this topic, a comprehensive understanding of the factors stemming from COVID-19 that disrupted the industry is still lacking. This study aims to bridge that knowledge gap by identifying the challenges, categorizing them into four areas (cost overruns, schedule overruns, contractual implications, and health and safety issues), ranking them based on their frequency of occurrence in previous studies, and outlining management strategies to lessen their detrimental impacts on projects. A systematic literature review was conducted, and 284 publications were shortlisted for further review. The review revealed 26 challenges, of which shortage of labor, suspension or slowing of ongoing projects, force majeure confusion, and workplace safety concerns were among the most frequently cited, and offered strategies, such as workforce investment, supplier management, legal consultation, and transparent communication, for managing them. This research provides valuable insights for stakeholders and project managers in the construction sector that will help them comprehend and effectively manage the pandemic-induced challenges.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

All the data, models, or code that support the findings of this study are available from the corresponding author upon reasonable request.

References

Abubakar, M. E., A. Hasan, and K. N. Jha. 2022. “Delays and financial implications of COVID-19 for contractors in irrigation projects.” J. Constr. Eng. Manage. 148 (9): 05022006. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002329.
Adepu, N., S. Kermanshachi, and A. Pamidimukkala. 2022. “Analysis of impact of COVID-19 and other occupational infectious diseases on construction of transportation projects.” In Proc., Int. Conf. on Transportation and Development (ICTD), 166–177. Reston, VA: ASCE. https://doi.org/10.1061/9780784484364.015.
Adepu, N., S. Kermanshachi, A. Pamidimukkala, and K. Loganathan. 2023. “Analysis of the factors affecting construction project cost during COVID-19.” In Proc., Int. Conf. on Transportation and Development, 718–727. Reston, VA: ASCE. https://doi.org/10.1061/9780784484883.062.
Ahmad, T., M. Khan, T. H. Musa, S. Nasir, J. Hui, D. K. Bonilla-Aldana, and A. J. Rodriguez-Morales. 2020. “COVID-19: Zoonotic aspects.” Travel Med. Infect. Dis. 36 (Jul): 101607. https://doi.org/10.1016/j.tmaid.2020.101607.
Akinradewo, O., D. Aghimien, C. Aigbavboa, and M. Onyia. 2022. “Factors influencing the adoption of insurance as a risk treatment tool by contractors in the construction industry.” Int. J. Constr. Manage. 22 (13): 2484–2492. https://doi.org/10.1080/15623599.2020.1797986.
Alhusban, A. A., S. A. Alhusban, and M. A. Alhusban. 2022. “How the COVID 19 pandemic would change the future of architectural design.” J. Eng. Des. Technol. 20 (1): 339–357. https://doi.org/10.1108/JEDT-03-2021-0148.
Aljohani, A., D. Ahiaga-Dagbui, and D. Moore. 2017. “Construction projects cost overrun: What does the literature tell us?” Int. J. Innov. Manage. Technol. 8 (2): 137. https://doi.org/10.18178/ijimt.2017.8.2.717.
Al-Mhdawi, M. K. S., M. Brito, B. S. Onggo, A. Qazi, A. O’Connor, B. M. Ayyub, and A. P. Chan. 2023. “A structural equation model to analyze the effects of COVID-19 pandemic risks on project success: Contractors’ perspectives.” J. Risk Uncertainty Eng. Syst. Part A: Civ. Eng. 9 (3): 05023003. https://doi.org/10.1061/AJRUA6.RUENG-1008.
Alsharef, A., S. Banerjee, S. J. Uddin, A. Albert, and E. Jaselskis. 2021. “Early impacts of the COVID-19 pandemic on the United States construction industry.” Int. J. Environ. Res. Public Health 18 (4): 1559. https://doi.org/10.3390/ijerph18041559.
Amoah, C., and F. Simpeh. 2021. “Implementation challenges of COVID-19 safety measures at construction sites in South Africa.” J. Facil. Manage. 19 (1): 111–128. https://doi.org/10.1108/JFM-08-2020-0061.
Araya, F. 2021. “Modeling the spread of COVID-19 on construction workers: An agent-based approach.” Saf. Sci. 133 (Jun): 105022. https://doi.org/10.1016/j.ssci.2020.105022.
Arthi, V., and J. Parman. 2021. “Disease, downturns, and wellbeing: Economic history and the long-run impacts of COVID-19.” Explorations Econ. Hist. 79 (Apr): 101381. https://doi.org/10.1016/j.eeh.2020.101381.
Assaad, R., and I. H. El-adaway. 2021. “Guidelines for responding to COVID-19 pandemic: Best practices, impacts, and future research directions.” J. Manage. Eng. 37 (3): 06021001. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000906.
Assaad, R. H., I. H. El-Adaway, M. Hastak, and K. LaScola Needy. 2022. “The COVID-19 pandemic: A catalyst and accelerator for offsite construction technologies.” J. Manage. Eng. 38 (6): 04022062. https://doi.org/10.1061/(ASCE)ME.1943-5479.0001091.
Ataei, H., D. Becker, J. R. Hellenbrand, M. S. H. M. Mehany, T. E. Mitchell, and D. M. Ponte. 2021. COVID-19 pandemic impacts on construction projects. Reston, VA: Transportation Research Board.
Atasoy, G., U. Ertaymaz, I. Dikmen, and M. Talat Birgonul. 2022. “Empowering risk communication: Use of visualizations to describe project risks.” J. Constr. Eng. Manage. 148 (5): 04022015. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002265.
Baral, A., Y. Liang, M. Li, M. Gonzalez, M. Shahandashti, and B. Ashuri. 2022. “Impact of COVID-19 on the diversity of the construction workforce.” Nat. Hazards Rev. 23 (3): 04022015. https://doi.org/10.1061/(ASCE)NH.1527-6996.0000560.
Barua, S. 2020. “COVID-19 pandemic and world trade: Some analytical notes.” Accessed April 15, 2020. https://doi.org/10.2139/ssrn.3577627.
Bou Hatoum, M., A. Faisal, H. Nassereddine, and H. Sarvari. 2021. “Analysis of COVID-19 concerns raised by the construction workforce and development of mitigation practices.” Front. Built Environ. 7 (May): 66. https://doi.org/10.3389/fbuil.2021.688495.
Bunni, N. G., and L. B. Bunni. 2022. Risk and insurance in construction. 3rd ed. London: Routledge.
Charlson, J. 2022. “Interpreting contractual rights to COVID-19 remedies: An analysis of cases.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 14 (4): 06522002. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000542.
Chen, J., H. Wang, and R. Y. Zhong. 2021. “A supply chain disruption recovery strategy considering product change under COVID-19.” J. Manuf. Syst. 60 (Jun): 920–927. https://doi.org/10.1016/j.jmsy.2021.04.004.
Chirumbolo, A., A. Callea, and F. Urbini. 2021. “The effect of job insecurity and life uncertainty on everyday consumption and broader life projects during COVID-19 pandemic.” Int. J. Environ. Res. Public Health 18 (10): 5363. https://doi.org/10.3390/ijerph18105363.
Choi, S. D., and J. A. Staley. 2021. “Safety and health implications of COVID-19 on the United States construction industry.” Indus. Syst. Eng. Rev. 9 (1): 56–67. https://doi.org/10.37266/ISER.2021v9i1.pp56-67.
Demachkieh, F., S. Khalife, M. A. Abdul-Malak, and F. Hamzeh. 2020. “Considerations for filing global construction claims: Legal perspective.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (3): 05020003. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000393.
Denny-Smith, G., R. Y. Sunindijo, M. Loosemore, M. Williams, and L. Piggott. 2021. “How construction employment can create social value and assist recovery from COVID-19.” Sustainability 13 (2): 988. https://doi.org/10.3390/su13020988.
Donthu, N., and A. Gustafsson. 2020. “Effects of COVID-19 on business and research.” J. Bus. Res. 117 (Apr): 284–289. https://doi.org/10.1016/j.jbusres.2020.06.008.
Ekanayake, E. M. A. C., G. Q. Shen, M. M. Kumaraswamy, E. K. Owusu, and A. B. Saka. 2021. “Modeling supply chain resilience in industrialized construction: A Hong Kong case.” J. Constr. Eng. Manage. 147 (11): 05021009. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002188.
Gamil, Y., and A. Alhagar. 2020. “The impact of pandemic crisis on the survival of construction industry: A case of COVID-19.” Mediterr. J. Soc. Sci. 11 (4): 122. https://doi.org/10.36941/mjss-2020-0047.
Gammanage, S. H., and Gunarathna. 2022. “Delays and disruptions in the construction industry during the global pandemic.” In Proc., 10th World Construction Symp., edited by Y. G. Sandanayake, S. Gunatilake, and K. G. A. S. Waidyasekara, 326–338. Boca Raton, FL: CRC Press.
Gao, N., and A. Touran. 2020. “Cost overruns and formal risk assessment program in US rail transit projects.” J. Constr. Eng. Manage. 146 (5): 05020004. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001827.
Golan, M. S., L. H. Jernegan, and I. Linkov. 2020. “Trends and applications of resilience analytics in supply chain modeling: Systematic literature review in the context of the COVID-19 pandemic.” Environ. Syst. Decis. 40 (2): 222–243. https://doi.org/10.1007/s10669-020-09777-w.
Hesna, Y., J. Sunaryati, and A. Hidayati. 2021. “COVID-19 pandemic impact: An identification of the cause of cost overrun in construction project.” In Proc., E3S Web of Conf., 01014. London: EDP Sciences.
Ivanov, D. 2022. “Viable supply chain model: Integrating agility, resilience, and sustainability perspectives—lessons from and thinking beyond the COVID-19 pandemic.” Ann. Oper. Res. 319 (1): 1411–1431. https://doi.org/10.1007/s10479-020-03640-6.
Jagannathan, M., V. Nawle, V. Malla, and V. S. K. Delhi. 2022. “Role of case laws in claim management and contracts.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 14 (4): 04522025. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000558.
Januarita, R., and Y. Sumiyati. 2021. “Legal risk management: Can the COVID-19 pandemic be included as a force majeure clause in a contract?” Int. J. Law Manage. 63 (2): 219–238. https://doi.org/10.1108/IJLMA-05-2020-0140.
Jeon, J., S. Padhye, A. Bhattacharyya, H. Cai, and M. Hastak. 2022. “Impact of COVID-19 on the US construction industry as revealed in the Purdue index for construction.” J. Manage. Eng. 38 (1): 04021082. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000995.
Jergeas, G. F., and J. Ruwanpura. 2010. “Why cost and schedule overruns on mega oil sands projects?” Pract. Period. Struct. Des. Constr. 15 (1): 40–43. https://doi.org/10.1061/(ASCE)SC.1943-5576.0000024.
Karlsson, I., J. Rootzén, and F. Johnsson. 2020. “Reaching net-zero carbon emissions in construction supply chains–Analysis of a Swedish road construction project.” Renewable Sustainable Energy Rev. 120 (Aug): 109651. https://doi.org/10.1016/j.rser.2019.109651.
Karthick, S., S. Kermanshachi, and K. Loganathan. 2022a. “Impact of construction workers’ physical health and respiratory issues in hot weather: A pilot study.” In Proc., Transportation Consortium of South-Central States (Tran-SET), 135–145. Reston, VA: ASCE.
Karthick, S., S. Kermanshachi, and K. Loganathan. 2022b. “Occupational fatigue and physical health of construction workers in extreme hot weather.” In Proc., Transportation Consortium of South-Central States (Tran-SET), 259–269. Reston, VA: ASCE.
Karthick, S., S. Kermanshachi, and A. Pamidimukkala. 2022c. “Impact analysis of heat on physical and mental health of construction workforce.” In Proc., Int. Conf. on Transportation and Development (ICTD). Reston, VA: ASCE.
Karthick, S., S. Kermanshachi, B. Rouhanizadeh, and M. Namian. 2021. “Short-and long-term health challenges of transportation workforce due to extreme weather conditions.” In Proc., Transportation Consortium of South-Central States (Tran-SET), 39–51. Reston, VA: ASCE.
Khalef, R., I. H. El-adaway, R. Assaad, and N. Kieta. 2021. “Contract risk management: A comparative study of risk allocation in exculpatory clauses and their legal treatment.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 13 (1): 04520036. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000430.
King, T. L., and A. D. Lamontagne. 2021. “COVID-19 and suicide risk in the construction sector: Preparing for a perfect storm.” Scand. J. Public Health 49 (7): 774–778. https://doi.org/10.1177/1403494821993707.
Kisi, K. P., and T. Sulbaran. 2022. “Construction cost and schedule impacts due to COVID-19.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 14 (4): 04522024. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000565.
Kniffin, K. M., J. Narayanan, F. Anseel, J. Antonakis, S. P. Ashford, A. B. Bakker, and M. V. Vugt. 2021. “COVID-19 and the workplace: Implications, issues, and insights for future research and action.” Am. Psychol. 76 (1): 63. https://doi.org/10.1037/amp0000716.
Koh, D. 2020. “Migrant workers and COVID-19.” Occup. Environ. Med. 77 (9): 634–636. https://doi.org/10.1136/oemed-2020-106626.
Ling, F. Y., Z. Zhang, and A. Y. Yew. 2022. “Impact of COVID-19 pandemic on demand, output, and outcomes of construction projects in Singapore.” J. Manage. Eng. 38 (2): 04021097. https://doi.org/10.1061/(ASCE)ME.1943-5479.0001020.
Lu, I. F., S. J. Guo, and Y. J. Pan. 2011. “Construction project management and insurance program for Taiwan high speed rail project.” Leadersh. Manage. Eng. 11 (1): 45–56. https://doi.org/10.1061/(ASCE)LM.1943-5630.0000088.
Lu, W., L. Wu, J. Xu, and J. Lou. 2022. “Construction E-inspection 2.0 in the COVID-19 pandemic era: A blockchain-based technical solution.” J. Manage. Eng. 38 (4): 04022032. https://doi.org/10.1061/(ASCE)ME.1943-5479.0001063.
Lund, S., J. Manyika, J. Woetzel, E. Barriball, and M. Krishnan. 2020. Risk, resilience, and rebalancing in global value chains. New York: McKinsey Global Institute.
Mahajan, S. 2020. “Impact of COVID-19 on financial health in India: Managing financial health in challenging times.” Accessed April 24, 2020. https://doi.org/10.2139/ssrn.3595351.
Matilla-Santander, N., E. Ahonen, M. Albin, S. Baron, M. Bolíbar, K. Bosmans, and All Members of the PWR Study Consortium. 2021. “COVID-19 and precarious employment: Consequences of the evolving crisis.” Int. J. Health Serv. 51 (2): 226–228. https://doi.org/10.1177/0020731420986694.
Mishra, A., S. R. Das, and J. J. Murray. 2016. “Risk, process maturity, and project performance: An empirical analysis of US federal government technology projects.” Prod. Oper. Manage. 25 (2): 210–232. https://doi.org/10.1111/poms.12513.
Mostafa, B. A. 2021. “Effect of remote working on employees wellbeing and work-life integration during pandemic in Egypt.” Int. Bus. Res. 14 (3): 41–52. https://doi.org/10.5539/ibr.v14n3p41.
Nipa, T. J., and S. Kermanshachi. 2022. “Resilience measurement in highway and roadway infrastructures: Experts’ perspectives.” Prog. Disaster Sci. 14 (Jun): 100230. https://doi.org/10.1016/j.pdisas.2022.100230.
Nipa, T. J., S. Kermanshachi, and S. Karthick. 2022. “Analysis of investment decision-making factors in resilience improvement of transportation infrastructure.” In Proc., Construction Research Congress 2022, 90–100. Reston, VA: ASCE.
Nnaji, C., Z. Jin, and A. Karakhan. 2022. “Safety and health management response to COVID-19 in the construction industry: A perspective of fieldworkers.” Process Saf. Environ. Prot. 159 (Apr): 477–488. https://doi.org/10.1016/j.psep.2022.01.002.
Nyashanu, M., F. Pfende, and M. Ekpenyong. 2020. “Exploring the challenges faced by frontline workers in health and social care amid the COVID-19 pandemic: Experiences of frontline workers in the English Midlands region, UK.” J. Interprofessional Care 34 (5): 655–661. https://doi.org/10.1080/13561820.2020.1792425.
Odeh, A. M., and H. T. Battaineh. 2002. “Causes of construction delay: Traditional contracts.” Int. J. Project Manage. 20 (1): 67–73. https://doi.org/10.1016/S0263-7863(00)00037-5.
Ogunnusi, M., M. Hamma-Adama, H. Salman, and T. Kouider. 2020. “COVID-19 pandemic: The effects and prospects in the construction industry.” Int. J. Real Estate Studies 14 (2).
Omotayo, T. S., B. Awuzie, V. K. Obi, S. Ajayi, L. I. Obi, O. Osobajo, and A. Oke. 2022. “The system dynamics analysis of cost overrun causations in UK rail projects in a COVID-19 epidemic era.” SAGE Open 12 (2): 215824402210979. https://doi.org/10.1177/21582440221097923.
Osman, I., and H. Ataei. 2022. “Studying construction claims due to COVID-19 for road and highway projects.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 14 (1): 06521004. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000517.
Osman, I., H. Ataei, and A. Seyrfar. 2022. “Differing site conditions: Clarifying misunderstandings to reduce costly litigation.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 14 (2): 04522002. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000534.
Pamidimukkala, A., and S. Kermanshachi. 2021. “Impact of COVID-19 on field and office workforce in construction industry.” Project Leadersh. Soc. 2 (Aug) 100018. https://doi.org/10.1016/j.plas.2021.100018.
Pamidimukkala, A., S. Kermanshachi, and T. Jahan Nipa. 2021. “Impacts of COVID-19 on health and safety of workforce in construction industry.” In Proc., Int. Conf. on Transportation and Development (ICTD), 418–430. Reston, VA: ASCE. https://doi.org/10.1061/9780784483541.039.
Pasco, R. F., S. J. Fox, S. C. Johnston, M. Pignone, and L. A. Meyers. 2020. “Estimated association of construction work with risks of COVID-19 infection and hospitalization in Texas.” JAMA Network Open 3 (10): e2026373–e2026373. https://doi.org/10.1001/jamanetworkopen.2020.26373.
Ping Ho, S., R. Dahal, and H. P. Tserng. 2023. “A contingency model of strategic responses to the institutional challenges in emerging countries: Evidence and findings from least developed countries.” J. Manage. Eng. 39 (4): 04023015. https://doi.org/10.1061/JMENEA.MEENG-5102.
Rakshit, D., and A. Paul. 2020. “Impact of COVID-19 on sectors of Indian economy and business survival strategies.” Accessed June 6, 2020. https://doi.org/10.2139/ssrn.3620727.
Rasul, G., A. K. Nepal, A. Hussain, A. Maharjan, S. Joshi, A. Lama, and E. Sharma. 2021. “Socio-economic implications of COVID-19 pandemic in South Asia: Emerging risks and growing challenges.” Front. Sociol. 6 (Jun): 629693. https://doi.org/10.3389/fsoc.2021.629693.
Rouhanizadeh, B., and S. Kermanshachi. 2021a. “Causes of the mental health challenges in construction workers and their impact on labor productivity.” In Proc., Tran-SET 2021, 16–26. Reston, VA: ASCE.
Rouhanizadeh, B., and S. Kermanshachi. 2021b. “Development of a model determining the relationships of the factors delaying reconstruction projects.” In Proc., Int. Conf. on Transportation and Development, 330–340. Reston, VA: ASCE.
Rouhanizadeh, B., S. Kermanshachi, and V. S. Dhamangaonkar. 2019. “Identification and categorization of policy and legal barriers to long-term timely postdisaster reconstruction.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 11 (3): 04519014. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000307.
Safapour, E., and S. Kermanshachi. 2022. “Key components in schedule development of post-disaster reconstruction projects.” In Proc., Construction Research Congress, 48–56. Reston, VA: ASCE.
Sepasgozar, S. M., A. A. Khan, K. Smith, J. G. Romero, X. Shen, S. Shirowzhan, and F. Tahmasebinia. 2023. “BIM and digital twin for developing convergence technologies as future of digital construction.” Buildings 13 (2): 441. https://doi.org/10.3390/buildings13020441.
Sutterby, P., X. Wang, H. X. Li, and Y. Ji. 2023. “The impact of COVID-19 on construction supply chain management: An Australian case study.” Eng. Constr. Archit. Manage. 2023 (Jan): 12. https://doi.org/10.1108/ECAM-10-2021-0942.
Taghinezhad, A., A. Jafari, S. Kermanshachi, and T. Nipa. 2021. “Construction project management dimensions in transportation agencies: Case study of the US Department of Transportation.” Pract. Period. Struct. Des. Constr. 26 (3): 06021002. https://doi.org/10.1061/(ASCE)SC.1943-5576.0000579.
Tardivo, A., A. Carrillo Zanuy, and C. Sánchez Martín. 2021. “COVID-19 impact on transport: A paper from the railways’ systems research perspective.” Transp. Res. Rec. 2675 (5): 367–378. https://doi.org/10.1177/0361198121990674.
Tasnim, Z. E. R. 2020. “Disruption in global Food Supply Chain (FSCs) due to Covid-19 pandemic and impact of digitalization through block chain technology in FSCs management.” Eur. J. Bus. Manage. 12 (17): 73–84.
Thamhain, H. 2013. “Managing risks in complex projects.” Project Manage. J. 44 (2): 20–35. https://doi.org/10.1002/pmj.21325.
Tripathi, O. P., A. Hasan, K. N. Jha, and A. K. Jain. 2023. “Evaluating government contracts for delays, delay damages, and levy of compensation provisions.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 15 (1): 04522032. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000584.
Turner, S. J. 2016. “Insurance issues: Construction claims of a different nature.” In Construction contract claims, changes, and dispute resolution, 411–430. Reston, VA: ASCE. https://doi.org/10.1061/9780784414293.ch16.
Uddin, S. J., A. Albert, M. Tamanna, and A. Alsharef. 2023. “YouTube as a source of information: Early coverage of the COVID-19 pandemic in the context of the construction industry.” Construct. Manage. Econ. 41 (5): 402–427. https://doi.org/10.1080/01446193.2022.2162096.
Vyas, L. 2022. “‘New normal’ at work in a post-COVID world: Work–life balance and labor markets.” Policy Soc. 41 (1): 155–167. https://doi.org/10.1093/polsoc/puab011.
Wickramasingha, S., and G. De Neve. 2022. “The collective working body: Rethinking apparel workers’ health and well-being during the COVID-19 pandemic in Sri Lanka.” Global Labour J. 13 (Sep): 3. https://doi.org/10.15173/glj.v13i3.5082.
Williams, S. N., C. J. Armitage, T. Tampe, and K. Dienes. 2020. “Public perceptions and experiences of social distancing and social isolation during the COVID-19 pandemic: A UK-based focus group study.” BMJ Open 10 (7): e039334. https://doi.org/10.1136/bmjopen-2020-039334.
Xu, Z., A. Elomri, L. Kerbache, and A. El Omri. 2020. “Impacts of COVID-19 on global supply chains: Facts and perspectives.” IEEE Eng. Manage. Rev. 48 (3): 153–166. https://doi.org/10.1109/EMR.2020.3018420.
Yang, Y., A. P. Chan, M. Shan, R. Gao, F. Bao, S. Lyu, and J. Guan. 2021. “Opportunities and challenges for construction health and safety technologies under the COVID-19 pandemic in Chinese construction projects.” Int. J. Environ. Res. Public Health 18 (24): 13038. https://doi.org/10.3390/ijerph182413038.
Zamani, S. H., R. A. Rahman, M. A. Fauzi, and L. M. Yusof. 2021. “Effect of COVID-19 on building construction projects: Impact and response mechanisms.” Earth Environ. Sci. 682 (1): 012049. https://doi.org/10.1088/1755-1315/682/1/012049.

Information & Authors

Information

Published In

Go to Practice Periodical on Structural Design and Construction
Practice Periodical on Structural Design and Construction
Volume 29Issue 3August 2024

History

Published online: Mar 27, 2024
Published in print: Aug 1, 2024
Discussion open until: Aug 27, 2024

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Nikhitha Adepu, S.M.ASCE [email protected]
Ph.D. Student, Dept. of Civil Engineering, Univ. of Texas at Arlington, 425 Nedderman Hall, 416 Yates St., Arlington, TX 76019. Email: [email protected]
Sharareh Kermanshachi, Ph.D., P.E. [email protected]
Associate Professor, Dept. of Civil Engineering, Univ. of Texas at Arlington, 425 Nedderman Hall, 416 Yates St., Arlington, TX 76019 (corresponding author). Email: [email protected]
Apurva Pamidimukkala, S.M.ASCE [email protected]
Ph.D. Student, Dept. of Civil Engineering, Univ. of Texas at Arlington, 425 Nedderman Hall, 416 Yates St., Arlington, TX 76019. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share