Problematic Interfaces and Prevention Strategies in Modular Construction
Publication: Journal of Management in Engineering
Volume 39, Issue 2
Abstract
Modular construction increasingly is used for building projects to improve productivity, quality, and sustainability. However, interfaces between modules and site-based works are complex, and often cause problems that hinder the wide application of the modular approach. This paper investigated problematic interfaces in modular construction and their causes, and developed prevention strategies. The research was carried out through a 1-year participatory case study with a modular building project, coupled with an interview-based survey with leading module suppliers in the United Kimgdom. Wide-ranging problematic interfaces were identified in physical, contractual, and organizational groups from the case study, and their interconnections and complexities were examined using social network analysis. The case study results highlighted the significance of physical problematic interfaces and indicated the centrality of the module supplier in both facing and causing the problematic interfaces, which was echoed by findings from the module supplier survey. Likewise, a variety of causes were identified in the technical, contractual, and organizational aspects, markedly, the lack of management and coordination, and poor communications. Effective communication between the module supplier and installer and all other subcontractors was found to be most critical to preventing problematic interfaces, for which the module supplier should advocate and the principal contractor should coordinate. This research demonstrated the interconnections and complexities of problematic interfaces and their causes in modular construction with empirical evidence, and highlighted the leading role of module suppliers in preventing problematic interfaces. The findings contribute to a better understanding of complex problematic interfaces in modular construction and provide valuable insights into interface management of modular building projects.
Get full access to this article
View all available purchase options and get full access to this article.
Data Availability Statement
Some or all data, models, or code that support the findings of this study are available from the corresponding author upon reasonable request.
Acknowledgments
We acknowledge the dissertation project by Daniel Parker on which this paper builds and develops and the participants in the case study and survey.
References
Abdul Nabi, M., and I. H. El-adaway. 2021. “Understanding the key risks affecting cost and schedule performance of modular construction projects.” J. Manage. Eng. 37 (4): 04021023. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000917.
Ahn, S., S. Shokri, S. Lee, C. T. Haas, and R. C. G. Haas. 2017. “Exploratory study on the effectiveness of interface-management practices in dealing with project complexity in large-scale engineering and construction projects.” J. Manage. Eng. 33 (2): 04016039. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000488.
Alacon, L., and D. Mardones. 1998. Improving the design-construction interface. Guaruja, Brazil: International Group for Lean Construction.
Atkinson, A. 1999. “The role of human error in construction defects.” Struct. Surv. J. 17 (4): 231–236. https://doi.org/10.1108/02630809910303006.
Blismas, N., C. Pasquire, and A. Gibb. 2006. “Benefit evaluation for off-site production in construction.” Sustainability 24 (2): 121–130. https://doi.org/10.1080/01446190500184444.
Borgatti, S. P., M. G. Everett, and L. C. Freeman. 2002. Ucinet for windows: Software for social network analysis. Harvard, MA: Analytic Technologies.
Borgatti, S. P., M. G. Everett, and J. C. Johnson. 2018. Analyzing social networks. 2nd ed. Thousand Oaks, CA: SAGE.
Bryman, A. 2008. Social research methods. 3rd ed. Oxford, UK: Oxford University Press.
Choi, J. O., J. T. O’Connor, Y. H. Kwak, and B. K. Shrestha. 2019. “Modularization business case analysis model for industrial projects.” J. Manage. Eng. 35 (3): 04019004. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000683.
Enshassi, M. S. A., S. Walbridge, J. S. West, and C. T. Haas. 2019. “Integrated risk management framework for tolerance-based mitigation strategy decision support in modular construction projects.” J. Manage. Eng. 35 (4): 05019004. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000698.
Eray, E., C. T. Haas, and D. Rayside. 2021. “Interface health and workload between stakeholders in complex capital projects: Assessment, visualization, and interpretation using SNA.” J. Manage. Eng. 37 (3): 04021006. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000891.
Eray, E., B. Sanchez, and C. Haas. 2019. “Usage of interface management system in adaptive reuse of buildings.” Buildings 9 (5): 105. https://doi.org/10.3390/buildings9050105.
Ferdous, W., Y. Bai, T. D. Ngo, A. Manalo, and P. Mendis. 2019. “New advancements, challenges and opportunities of multi-storey modular buildings—A state-of-the-art review.” Eng. Struct. 183 (Aug): 883–893. https://doi.org/10.1016/j.engstruct.2019.01.061.
Freeman, L. C. 1979. “Centrality in social networks conceptual clarification.” Social Netw. 1 (3): 215–239. https://doi.org/10.1016/0378-8733(78)90021-7.
Ghannad, P., Y. C. Lee, and J. O. Choi. 2020. “Feasibility and implications of the modular construction approach for rapid post-disaster recovery.” Int. J. Industrialized Constr. 1 (1): 64–75. https://doi.org/10.29173/ijic220.
Gibb, A. 1998. Management of the cladding/services interface: A case study. Loughborough, UK: Loughborough Univ.
Gibb, A. 1999. Off-site fabrication: Prefabrication, pre-assembly and modularization. Caithness, UK: Whittles.
Goodier, C., and A. Gibb. 2007. “Future opportunities for offsite in the UK.” Construct. Manage. Econ. 25 (6): 585–595. https://doi.org/10.1080/01446190601071821.
Gorgolewski, M., P. Grubb, and R. Lawson. 2005. Modular construction using light steel framing. Berkshire, UK: The Steel Construction Institute.
Hawker, S., and C. Soanes. 2005. Compact oxford English dictionary of current English. 3rd ed. Oxford, UK: Oxford University Press.
Jackson, P., M. Smith, and R. Thorpe. 2008. Management research. 3rd ed. Thousand Oaks, CA: SAGE.
Lawson, M., R. Ogden, and C. Goodier. 2014. Design in modular construction. Boca Raton, FL: CRC Press.
McCarney, M., C. I. Goodier, and A. Gibb. 2022. “Interface management of offsite bathroom construction: A conceptual model.” Constr. Innovation. https://doi.org/10.1108/CI-11-2021-0221.
Meacham, B. J. 2022. “Fire performance and regulatory considerations with modern methods of construction.” Build. Cities 3 (1). https://doi.org/10.5334/bc.201.
Neale, R., A. Price, and W. Sher. 1993. Prefabricated modules in construction. Bournemouth, UK: Bourne.
Pan, M., and W. Pan. 2019. “Determinants of adoption of robotics in precast concrete production for buildings.” J. Manage. Eng. 35 (5): 05019007. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000706.
Pan, W., A. G. F. Gibb, and A. R. J. Dainty. 2007. “Perspectives of UK housebuilders on the use of offsite modern methods of construction.” Construct. Manage. Econ. 25 (2): 183–194. https://doi.org/10.1080/01446190600827058.
Pan, W., and C. K. Hon. 2020. “Briefing: Modular integrated construction for high-rise buildings.” Proc. Inst. Civ. Eng. Munic. Eng. 173 (2): 64–68. https://doi.org/10.1680/jmuen.18.00028.
Pan, W., Z. Zhang, and Y. Yang. 2020. A glossary of modular integrated construction. Hong Kong: Univ. of Hong Kong.
Park, H. K., and J.-H. Ock. 2016. “Unit modular in-fill construction method for high-rise buildings.” KSCE J. Civ. Eng. 20 (4): 1201–1210. https://doi.org/10.1007/s12205-015-0198-2.
Pavitt, T. C., and A. G. F. Gibb. 2003. “Interface management within construction: In particular, building façade.” J. Constr. Eng. Manage. 129 (1): 8–15. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:1(8).
Price, C., C. I. Goodier, F. Fouchal, and N. Fraser. 2019. “The role of standards in offsite construction: A review of existing practice and future need.” In White paper, BSI. Loughborough, UK: Loughborough Univ.
Prieto, R. 2008. “Foundations, frameworks and lessons learned in program management.” PM World Today J. 10 (5): 1–31.
Rausch, C., C. Edwards, and C. Haas. 2020. “Benchmarking and improving dimensional quality on modular construction projects—A case study.” Int. J. Industrialized Constr. 1 (1): 2–21. https://doi.org/10.29173/ijic212.
RICS (Royal Institution of Chartered Surveyors). 2018. Modern methods of construction—A forward-thinking solution to the housing crisis? London: RICS.
Sha’ar, K. Z., S. A. Assaf, T. Bambang, M. Babsail, and A. A. E. Fattah. 2017. “Design–construction interface problems in large building construction projects.” Int. J. Construct. Manage. 17 (3): 238–250. https://doi.org/10.1080/15623599.2016.1187248.
Shen, W., B. Choi, S. Lee, W. Tang, and C. T. Haas. 2018. “How to improve interface management behaviors in EPC projects: Roles of formal practices and social norms.” J. Manage. Eng. 34 (6): 04018032. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000639.
Srisangeerthanan, S., M. J. Hashemi, P. Rajeev, E. Gad, and S. Fernando. 2020. “Review of performance requirements for inter-module connections in multi-story modular buildings.” J. Build. Eng. 28 (Aug): 101087. https://doi.org/10.1016/j.jobe.2019.101087.
Taylor, M. D. 2020. “A definition and valuation of the UK offsite construction sector: Ten years on.” Int. J. Construct. Manage. 22 (15): 2877–2885. https://doi.org/10.1080/15623599.2020.1829783.
Wang, Z., W. Pan, and Y. Zhang. 2021. “Parametric study on module wall-core system of concrete modular high-rises considering the influence of vertical inter-module connections.” Eng. Struct. 241 (Aug): 112436. https://doi.org/10.1016/j.engstruct.2021.112436.
Woo, J., and J. T. O’Connor. 2021. “Mitigation strategies to prevent engineering design quality defects.” J. Manage. Eng. 37 (3): 04021007. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000898.
Yang, Y., M. Pan, W. Pan, and Z. Zhang. 2021. “Sources of uncertainties in offsite logistics of modular construction for high-rise building projects.” J. Manage. Eng. 37 (3): 04021011. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000905.
Yeganeh, A. A., M. Azizi, and R. Falsafi. 2019. “Root causes of design-construction interface problems in iranian design-build projects.” J. Constr. Eng. Manage. 145 (12): 05019014. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001727.
Zhang, S., Z. Li, S. Ma, L. Li, and M. Yuan. 2022. “Critical factors influencing interface management of prefabricated building projects: Evidence from China.” Sustainability 14 (9): 5418. https://doi.org/10.3390/su14095418.
Information & Authors
Information
Published In
Copyright
© 2023 American Society of Civil Engineers.
History
Received: May 20, 2022
Accepted: Nov 10, 2022
Published online: Jan 2, 2023
Published in print: Mar 1, 2023
Discussion open until: Jun 2, 2023
ASCE Technical Topics:
- Buildings
- Business management
- Case studies
- Construction engineering
- Construction industry
- Construction management
- Engineering fundamentals
- Freight transportation
- Infrastructure
- Logistics
- Methodology (by type)
- Modular structures
- Offsite construction
- Organizations
- Practice and Profession
- Project management
- Research methods (by type)
- Structural engineering
- Structures (by type)
- Supply chain management
- Transportation engineering
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.
Cited by
- Yang Zhang, Wei Pan, Yue Teng, Siwei Chen, Construction Waste Reduction in Buildings through Modular and Offsite Construction, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-5828, 40, 4, (2024).
- Ilias Krystallis, Zine Al Abidine Laraqui Mahi, Francesco Di Maddaloni, Flexible Infrastructure Design: A Real Options Reasoning Approach to Navigating Uncertainty in Large-Scale Projects, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-5678, 40, 3, (2024).
- Wenting Zhan, Wei Pan, Winnie Law, Haipeng Shen, Stakeholders’ Knowledge, Attitudes, and Intentions of Adopting Modular Integrated Construction for Sustainable Development in Hong Kong, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-5642, 40, 2, (2024).
- Tan Tan, Grant Mills, Eleni Papadonikolaki, Exploring Multidimensional Modularity: Strategies to Reduce Complexity in Design Activities, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-5596, 40, 3, (2024).
- Mohamad Abdul Nabi, Amr Elsayegh, Islam H. El-adaway, Understanding Collaboration Requirements for Modular Construction and Their Cascading Failure Impact on Project Performance, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-5440, 39, 6, (2023).