Abstract

The rapid growth of population and increasing complexity of urban infrastructure have led to even greater consideration of new methods of installing and commissioning underground facilities. These facilities and vital artery lines are implemented in various ways, the most important of which is the traditional open-trench and new trenchless technology. Many factors affect the selection of the best method of implementation, and the method and technology of implementation should be determined based on the conditions of the project and area of construction. In the present study, the factors affecting the acceptance and application of trenchless technology and open-trench method in Iran are evaluated using two techniques: analytic hierarchy process (AHP) and analytic network process (ANP), and the results are compared with each other. The statistical population for this research consisted of middle managers, contractors, and engineers from Iran’s supervision and design body. For this purpose, factors such as technology, economic, environmental, project productivity, organizational, executive management, individual, and demographic are identified as effective factors in the evaluation of excavation technology using library studies and consulting with experts. The relevant decision-making model was then prepared via interviews with experts. Eventually, components and criteria affecting excavation technology were prioritized through pairwise comparisons and model solving. The results showed that, in the AHP technique, the principal components, i.e., economic, technology, and executive management factors, and the criteria section, direct cost, social costs, and competitive business environment factors, are ranked first to third. In the ANP technique, the principal components, i.e., economic, technology, project productivity factors, and in the criteria section, the factors of the competitive business environment, environment, and social costs, are ranked first to third. This comparison shows that the existence of dependencies between the principal components is effective in prioritizing the elements.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Some or all data, models, or code that support the findings of this study are available from the corresponding author upon reasonable request.

References

Abukhzam, M., and A. Lee. 2010. Workforce attitude on technology adoption and diffusion school of the built environment. Salford, UK: Univ. of Salford.
Adeleke, A. Q., A. Y. Bahaudin, A. M. Kamaruddeen, J. A. Bamgbade, M. G. Salimon, M. W. A. Khan, and S. Sorooshian. 2018. “The influence of organizational external factors on construction risk management among Nigerian construction companies.” Saf. Health Work 9 (1): 115–124. https://doi.org/10.1016/j.shaw.2017.05.004.
AlamTabriz, A., and A. Bagherzade. 2009. “Combining fuzzy ANP and TOPSIS adjusted for selecting a strategic supplier.” J. Manage. Res. 2 (3): 149–181.
Al-Gahtani, S. S., G. S. Hubona, and J. Wang. 2007. “Information technology (IT) in Saudi Arabia: Culture and the acceptance and use of IT.” Inf. Manage. 44 (8): 681–691. https://doi.org/10.1016/j.im.2007.09.002.
Al-Harbi, K. M. A. S. 2001. “Application of the AHP in project management.” Int. J. Project Manage. 19 (1): 19–27. https://doi.org/10.1016/S0263-7863(99)00038-1.
Al Khalil, M. I. 2002. “Selecting the appropriate project delivery method using AHP.” Int. J. Project Manage. 20 (6): 469–474. https://doi.org/10.1016/S0263-7863(01)00032-1.
Alshare, K. A., and F. B. Alkhateeb. 2008. “Predicting students usage of internet in two emerging economies using an extended technology acceptance model (TAM).” Acad. Educ. Leadersh. J. 12 (2): 109.
Armstrong, C. P., and V. Sambamurthy. 1999. “Information technology assimilation in firms: The influence of senior leadership and IT infrastructures.” Inf. Syst. Res. 10 (4): 304–327. https://doi.org/10.1287/isre.10.4.304.
Asghari Zadeh, E., and N. Nasrollahi. 2008. “Identifying and determining the weight of effective indicators in selecting contractors for construction projects.” [In Persian.] Manage. Res. 1 (2): 105–122.
Ataie, M. 2010. Multi-criteria decision making. [In Persian.] Shahrood, Iran: Shahrood University Press.
Azar, A., and A. Rajabzadeh. 2014. Applied decision MADM approach book. [In Persian.] Tehran, Iran: Negah Danesh.
Bagherinejhad, J., and M. R. Malahi. 2007. “Project management role in technology transfer process.” Manage. Stud. Dev. Evol. 18 (55): 149–172.
Black, B. 2002. “Performance of trenchless techniques for sewer construction in Hong Kong.” HKIE Trans. 9 (1): 51–56. https://doi.org/10.1080/1023697X.2002.10667870.
Bobylev, N. 2011. “Comparative analysis of environmental impacts of selected underground construction technologies using the analytic network process.” Autom. Constr. 20 (8): 1030–1040. https://doi.org/10.1016/j.autcon.2011.04.004.
Boyce, G. M., and E. M. Bried. 1994. “Estimating the social cost savings of trenchless techniques.” No-Dig Eng. 1 (2): 2–5.
Brady, K. C., M. Burtwell, and J. C. Thomson. 2001. Mitigating the disruption caused by utility street works. Crowthorne, UK: TRL Limited.
Chan, S. C. H., and E. W. T. Ngai. 2007. “A qualitative study of information technology adoption: How ten organizations adopted Web-based training.” Inf. Syst. J. 17 (3): 289–315. https://doi.org/10.1111/j.1365-2575.2007.00250.x.
Chao, L.-C., and M. J. Skibniewski. 1994. “Estimating construction productivity: Neural-network-based approach.” J. Comput. Civ. Eng. 8 (2): 234–251. https://doi.org/10.1061/(ASCE)0887-3801(1994)8:2(234).
Chapman, D. N., C. D. F. Rogers, H. J. Burd, P. M. Norris, and G. W. E. Milligan. 2007. “Research needs for new construction using trenchless technologies.” Tunnelling Underground Space Technol. 22 (5–6): 491–502. https://doi.org/10.1016/j.tust.2007.05.003.
Chau, P. Y. K., and K. Y. Tam. 1997. “Factors affecting the adoption of open systems: An exploratory study.” MIS Q. 21 (1): 1–24. https://doi.org/10.2307/249740.
Chenna, R., S. Terala, A. P. Singh, K. Mohan, B. K. Rastogi, and P. K. Ramancharla. 2014. “Vulnerability assessment of buried pipelines: A case study.” Front. Geotech. Eng. 3 (1): 24–33.
Chothe, O. K., and V. S. Kadam. 2016. “Comparative study of traditional method and innovative method for trenchless technology: A review.” Int. Res. J. Eng. Technol. 3 (5): 1104–1106.
Clark, R. H., and K. R. Browning. 1992. “Benefit/cost analysis of trenchless alternatives.” AACE Int. Trans. 2: Q-1.
Cording, E. J., and W. H. Hansmire. 1975. “Displacement around soft ground tunnels—General report.” In Proc., 5th Pan-American Conf. on Soil Mechanics and Foundation Engineering. Tallinn, Estonia: EurekaMag Biomedical Library.
Dabirian, S. 2015. “Modelling of labor productivity in construction industry using system dynamics.” Ph.D. thesis, Dept. of Civil Engineering, Tehran Univ. of Science and Technology.
Daft, R. L. 2015. Organization theory and design. Boston: Cengage Learning.
Dai, J., P. M. Goodrum, and W. F. Maloney. 2009. “Construction craft workers’ perceptions of the factors affecting their productivity.” J. Constr. Eng. Manage. 135 (3): 217–226. https://doi.org/10.1061/(ASCE)0733-9364(2009)135:3(217).
Damanpour, F., and M. Schneider. 2009. “Characteristics of innovation and innovation adoption in public organizations: Assessing the role of managers.” J. Public Administration Res. Theory 19 (3): 495–522. https://doi.org/10.1093/jopart/mun021.
Department of Housing, Planning, Commuinty and Local Government. 2011. Santry to east wall pipeline replacement project, river Tolka crossing description and method statement. Dublin, Ireland: Department of Housing, Planning, Community and Local Government.
Dorri, B., and E. Hamzehi. 2010. “Determining the best responding strategy to project risk using ANP technique (Case study: North Azadegan oil field development project).” Ind. Manage. J. 2 (1): 75–92.
El-Abbasy, M. S., T. Zayed, M. Ahmed, H. Alzraiee, and M. Abouhamad. 2013. “Contractor selection model for highway projects using integrated simulation and analytic network process.” J. Constr. Eng. Manage. 139 (7): 755–767. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000647.
Eshtehardian, E., P. Ghodousi, and A. Bejanpour. 2013. “Using ANP and AHP for the supplier selection in the construction and civil engineering companies; case study of Iranian company.” KSCE J. Civ. Eng. 17 (2): 262–270. https://doi.org/10.1007/s12205-013-1141-z.
Faraji Sabokbar, H. A., S. A. Badri, S. H. Motiee Langroodi, and H. Sharafi. 2010. “Measuring the sustainability of rural areas using analytical network process (ANP), case-study: Rural areas of Fasa County.” Hum. Geogr. Res. 42 (2): 135–156.
Fredrickson, J. W. 1986. “The strategic decision process and organizational structure.” Acad. Manage. Rev. 11 (2): 280–297. https://doi.org/10.2307/258460.
Fry, L. W., and J. W. Slocum Jr. 1984. “Technology, structure, and workgroup effectiveness: A test of a contingency model.” Acad. Manage. J. 27 (2): 221–246. https://doi.org/10.2307/255923.
Gao, J., M. Li, and C. Y. Tan. 2013. “A concept model for innovation diffusion in construction industry.” In Proc., Int. Conf. on Innovations in Engineering and Technology (ICIET’2013), 25–26. Bangkok, Thailand: International Institute of Engineers.
Gatignon, H., and T. S. Robertson. 1989. “Technology diffusion: An empirical test of competitive effects.” J. Mark. 53 (1): 35–49. https://doi.org/10.1177/002224298905300104.
Gholamalifard, M., M. Mirzaei, M. Hatamimanesh, A. Riyahi Bakhtiari, and M. Sadeghi. 2014. “Application of rapid impacts assessment matrix and Iranian matrix in environmental impact assessment of municipal solid waste landfill of Shahrekord.” J. Shahrekord Univ. Med. Sci. 16 (1): 31–64.
Gilchrist, A., and E. N. Allouche. 2005. “Quantification of social costs associated with construction projects: State-of-the-art review.” Tunnelling Underground Space Technol. 20 (1): 89–104. https://doi.org/10.1016/j.tust.2004.04.003.
Goodrum, P. M., C. T. Haas, C. Caldas, D. Zhai, J. Yeiser, and D. Homm. 2011. “Model to predict the impact of a technology on construction productivity.” J. Constr. Eng. Manage. 137 (9): 678–688. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000328.
Grover, V., and M. D. Goslar. 1993. “The initiation, adoption, and implementation of telecommunications technologies in US organizations.” J. Manage. Inf. Syst. 10 (1): 141–164. https://doi.org/10.1080/07421222.1993.11517994.
Gupta, B., S. Dasgupta, and A. Gupta. 2008. “Adoption of ICT in a government organization in a developing country: An empirical study.” J. Strategic Inf. Syst. 17 (2): 140–154. https://doi.org/10.1016/j.jsis.2007.12.004.
Haddad, A. H., and M. Kadkhodai Belqur. 2009. “Reconstruction of urban water transmission networks by trenchless method.” [In Persian.] In Proc., 1st National Conf. on Engineering and Management of Infrastructures. Tehran, Iran: Univ. of Tehran.
Harsono, L. D., and L. A. Suryana. 2014. “Factors affecting the use behavior of social media using UTAUT 2 model.” In Proc., 1st Asia-Pacific Conf. on Global Business, Economics, Finance and Social Sciences, 1–14. Jawa Barat, Indonesia: PPM Telkom Univ.
Hay, S. 2014. “A comparative study of trenchless technologies versus traditional open trenching for the replacement of ageing potable water pipelines.” Ph.D. thesis, Dept. of Civil Engineering, Durban Univ. of Technology.
Jannadi, O. A. 2008. “Risks associated with trenching works in Saudi Arabia.” Build. Environ. 43 (5): 776–781. https://doi.org/10.1016/j.buildenv.2007.01.034.
Janvrin, D., J. Bierstaker, and D. J. Lowe. 2008. “An examination of audit information technology use and perceived importance.” Accounting Horiz. 22 (1): 1–21. https://doi.org/10.2308/acch.2008.22.1.1.
Jung, Y. J., and S. K. Sinha. 2007. “Evaluation of trenchless technology methods for municipal infrastructure system.” J. Infrastruct. Syst. 13 (2): 144–156. https://doi.org/10.1061/(ASCE)1076-0342(2007)13:2(144).
Kerzner, H. 2017. Project management: A systems approach to planning, scheduling, and controlling. New York: Wiley.
Knoeri, C., C. R. Binder, and H.-J. Althaus. 2011. “Decisions on recycling: Construction stakeholders’ decisions regarding recycled mineral construction materials.” Resour. Conserv. Recycl. 55 (11): 1039–1050. https://doi.org/10.1016/j.resconrec.2011.05.018.
Kramer, S. R., and G. A. Gary. 2000. “Comparison of trenchless vs. open-cut construction methods for the replacement of a leaking water distribution system.” In Proc., Environmental and Pipeline Engineering 2000, 289–298. Reston, VA: ASCE.
Kuan, K. K. Y., and P. Y. K. Chau. 2001. “A perception-based model for EDI adoption in small businesses using a technology–organization–environment framework.” Inf. Manage. 38 (8): 507–521. https://doi.org/10.1016/S0378-7206(01)00073-8.
Landeta, J. 2006. “Current validity of the Delphi method in social sciences.” Technol. Forecasting Social Change 73 (5): 467–482. https://doi.org/10.1016/j.techfore.2005.09.002.
Leca, E., and B. New. 2007. “Settlements induced by tunneling in soft ground.” Tunnelling Underground Space Technol. 22 (2): 119–149. https://doi.org/10.1016/j.tust.2006.11.001.
Lee, H., M. Najafi, and J. Matthys. 2007. “Cost comparison of pipeline asset replacement: Open-cut and pipe-bursting.” In Proc., Pipelines 2007: Advances and Experiences with Trenchless Pipeline Projects, 1–11. Reston, VA: ASCE.
Lee, M.-C. 2010. “The analytic hierarchy and the network process in multicriteria decision making: Performance evaluation and selecting key performance indicators based on ANP model.” In Vol. 426 of Convergence and hybrid information technologies, 125–148. London: IntechOpen.
Lee, S., J. Yu, and D. Jeong. 2015. “BIM acceptance model in construction organizations.” J. Manage. Eng. 31 (3): 04014048. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000252.
Liao, S.-K., and K.-L. Chang. 2009. “Select televised sportscasters for Olympic games by analytic network process.” Manage. Decis. 47 (1): 14–23. https://doi.org/10.1108/00251740910929678.
Lu, S.-T., C.-W. Lin, and P.-H. Ko. 2007. “Application of analytic network process (ANP) in assessing construction risk of urban bridge project.” In Proc., 2nd Int. Conf. on Innovative Computing, Information and Control (ICICIC 2007), 169. New York: IEEE.
Ma, B., and M. Najafi. 2008. “Development and applications of trenchless technology in China.” Tunnelling Underground Space Technol. 23 (4): 476–480. https://doi.org/10.1016/j.tust.2007.08.003.
Makulsawatudom, A., M. Emsley, and K. Sinthawanarong. 2004. “Critical factors influencing construction productivity in Thailand.” J. KMITNB 14 (3): 1–6.
Matthews, J. C., and E. N. Allouche. 2012. “Fully automated decision support system for assessing the suitability of trenchless technologies.” J. Pipeline Syst. Eng. Pract. 3 (2): 55–64. https://doi.org/10.1061/(ASCE)PS.1949-1204.0000095.
Matthews, J. C., E. N. Allouche, and R. L. Sterling. 2015. “Social cost impact assessment of pipeline infrastructure projects.” Environ. Impact Assess. Rev. 50 (Jan): 196–202. https://doi.org/10.1016/j.eiar.2014.10.001.
McKim, R. 1995. “Domestic sewer lateral replacement—A new method.” In Proc., NASTT No-Dig’95 Conf. and Exhibition. Bothell, WA: North American Society For Trenchless Technology.
McKim, R. A. 1997. “Selection method for trenchless technologies.” J. Infrastruct. Syst. 3 (3): 119–125. https://doi.org/10.1061/(ASCE)1076-0342(1997)3:3(119).
Moselhi, O., and Z. Khan. 2010. “Analysis of labour productivity of formwork operations in building construction.” Constr. Innovation 10 (3): 286–303. https://doi.org/10.1108/14714171011060088.
Movahedi, M., A. Ahmadvand, S. Aliyari, and F. Namjooyan. 2015. “The role of effective individual, organizational and managerial factors on adopting information technology in Iranian State organizations.” [In Persian] Res. Hum. Resour. Manage. 7 (3): 1–28.
Muntean, O.-L., L. Drăgut, N. Baciu, T. Man, L. Buzilă, and I. Ferencik. 2008. “Environmental impact assessment as a tool for environmental restoration: The case study of Copşa-Mică area, Romania.” In Use of landscape sciences for the assessment of environmental security, 461–474. New York: Springer.
Najafi, M. 2005. Trenchless technology: Pipeline and utility design, construction, and renewal. New York: McGraw-Hill.
Najafi, M. 2013. Trenchless technology: Planning, equipment, and methods. New York: McGraw Hill.
Nastaran, M., V. Ghasemi, and S. Hadizadeh. 2013. “Assessment of indices of social sustainability by using analytic network process (ANP).” J. Appl. Sociol. 24 (3): 155–173.
Olson, M. P., S. T. Ariaratnam, and J. S. Lueke. 2016. “Jacking force and productivity analysis of pilot tube microtunneling installations.” J. Pipeline Syst. Eng. Pract. 7 (1): 04015018. https://doi.org/10.1061/(ASCE)PS.1949-1204.0000215.
Premkumar, G., and M. Roberts. 1999. “Adoption of new information technologies in rural small businesses.” Omega 27 (4): 467–484. https://doi.org/10.1016/S0305-0483(98)00071-1.
Ramen, M., B. Jugurnath, and P. Ramhit. 2015. “UTR-CTOE: A new paradigm explaining CAATs adoption.” J. Mod. Accounting Auditing 11 (12): 615–631.
Rehan, R., and M. Knight. 2007. Do trenchless pipeline construction methods reduce greenhouse gas emissions?. Waterloo, ON: Univ. of Waterloo.
Robbins, S. P. 1983. Organization theory: The structure and design of organizations. Hoboken, NJ: Prentice-Hall.
Rogers, E. M. 1983. Diffusion of innovation. New York: Free Press, Division of Macmillan Publishing.
Rosli, K., P. H. P. Yeow, and E.-G. Siew. 2012. “Computer-assisted auditing tools acceptance using I-Toe: A new paradigm.” Computer 7 (1): 15.
Saaty, T. L. 1990. “How to make a decision: The analytic hierarchy process.” Eur. J. Oper. Res. 48 (1): 9–26. https://doi.org/10.1016/0377-2217(90)90057-I.
Saaty, T. L. 1996. Decision making with dependence and feedback: The analytic network process. Pittsburgh: RWS Publications.
Saaty, T. L. 2004. “Fundamentals of the analytic network process—Dependence and feedback in decision-making with a single network.” J. Syst. Sci. Syst. Eng. 13 (2): 129–157. https://doi.org/10.1007/s11518-006-0158-y.
Saaty, T. L. 2007. “The analytic hierarchy and analytic network measurement processes: Applications to decisions under risk.” Eur. J. Pure Appl. Math. 1 (1): 122–196. https://doi.org/10.29020/nybg.ejpam.v1i1.6.
Sabherwal, R., and W. R. King. 1995. “An empirical taxonomy of the decision-making processes concerning strategic applications of information systems.” J. Manage. Inf. Syst. 11 (4): 177–214. https://doi.org/10.1080/07421222.1995.11518064.
Saied, S. A. M., P. Moarefvand, and J. Shahrivar Ghozollou. 2012. “A cost comparison among different method of urban sewage tunnel drilling.” [In Persian.] In Proc., 4th Iranian Mining Engineering Conf. Tehran, Iran: Tehran Univ.
Salah, M., S. A. Samra, and O. Hosny. 2016. “Analytical hierarchy process decision support system (AHP-DSS) for trenchless technology.” In Proc., ISARC Proc., Int. Symp. on Automation and Robotics in Construction, 1. International Association for Automation and Robotics in Construction Publications.
Sargent, K., P. Hyland, and S. Sawang. 2012. “Factors influencing the adoption of information technology in a construction business.” Australas. J. Constr. Econ. Build. 12 (2): 72.
Sarkis, J., and R. P. Sundarraj. 2006. “Evaluation of enterprise information technologies: A decision model for high-level consideration of strategic and operational issues.” IEEE Trans. Syst. Man Cybern. Part C Appl. Rev. 36 (2): 260–273. https://doi.org/10.1109/TSMCC.2004.843245.
Scupola, A. 2003. “The adoption of Internet commerce by SMEs in the south of Italy: An environmental, technological and organizational perspective.” J. Global Inf. Technol. Manage. 6 (1): 52–71. https://doi.org/10.1080/1097198X.2003.10856343.
Sepasgozaar, S. M. E., S. Shirowzhan, and C. C. Wang. 2017. “A scanner technology acceptance model for construction projects.” Procedia Eng. 180 (Jan): 1237–1246. https://doi.org/10.1016/j.proeng.2017.04.285.
Sepasgozar, S. M. E., and L. E. Bernold. 2013. “Factors influencing the decision of technology adoption in construction.” In Proc., ICSDEC 2012: Developing the Frontier of Sustainable Design, Engineering, and Construction, 654–661. Reston, VA: ASCE.
Shapira, A., and M. Goldenberg. 2005. “AHP-based equipment selection model for construction projects.” J. Constr. Eng. Manage. 131 (12): 1263–1273. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:12(1263).
Skibniewski, M. J., and L.-C. Chao. 1992. “Evaluation of advanced construction technology with AHP method.” J. Constr. Eng. Manage. 118 (3): 577–593. https://doi.org/10.1061/(ASCE)0733-9364(1992)118:3(577).
Sólnes, J. 2003. “Environmental quality indexing of large industrial development alternatives using AHP.” Environ. Impact Assess. Rev. 23 (3): 283–303. https://doi.org/10.1016/S0195-9255(03)00004-0.
Soltani, A., and E. Z. Marandi. 2011. “Hospital site selection using two-stage fuzzy multi-criteria decision making process.” J. Urban Environ. Eng. 5 (1): 32–43. https://doi.org/10.4090/juee.2011.v5n1.032043.
Tan, K. S., W. L. Teo, and K. P. Lai. 2011. “The applicability of information technology governance in the Malaysian SMEs.” J. Innovation Manage. Small Medium 2011: 1–10. https://doi.org/10.5171/2011.220894.
Tarafdar, M., and S. D. Vaidya. 2006. “Challenges in the adoption of E-commerce technologies in India: The role of organizational factors.” Int. J. Inf. Manage. 26 (6): 428–441. https://doi.org/10.1016/j.ijinfomgt.2006.08.001.
Thong, J. Y. L. 1999. “An integrated model of information systems adoption in small businesses.” J. Manage. Inf. Syst. 15 (4): 187–214. https://doi.org/10.1080/07421222.1999.11518227.
Tornatzky, L., and M. Fleischer. 1990. The process of technology innovation, 165. Lexington, MA: Lexington Books.
UNEP International Environmental Technology Centre. 2001. Trenchless technology systems: An environmentally sound approach for underground services: An introductory guide for decision-makers. Osaka, Japan: United Nations Environment Programme International Environmental Technology Centre.
Vaidya, O. S., and S. Kumar. 2006. “Analytic hierarchy process: An overview of applications.” Eur. J. Oper. Res. Sci. Res 4 (1): 1–29.
Venkatesh, V., M. G. Morris, G. B. Davis, and F. D. Davis. 2003. “User acceptance of information technology: Toward a unified view.” MIS Q. 27 (3): 425–478. https://doi.org/10.2307/30036540.
Wankhade, R. L., and A. B. Landage. 2013. “Non-destructive testing of concrete structures in Karad region.” Procedia Eng. 51 (Jan): 8–18. https://doi.org/10.1016/j.proeng.2013.01.005.
Wey, W.-M., and K.-Y. Wu. 2007. “Using ANP priorities with goal programming in resource allocation in transportation.” Math. Comput. Modell. 46 (7–8): 985–1000. https://doi.org/10.1016/j.mcm.2007.03.017.
Wong, J., H. Li, and J. Lai. 2008. “Evaluating the system intelligence of the intelligent building systems: Part 1: Development of key intelligent indicators and conceptual analytical framework.” Autom. Constr. 17 (3): 284–302. https://doi.org/10.1016/j.autcon.2007.06.002.
Woodroffe, N. J., and S. T. Ariaratnam. 2008. “Cost and risk evaluation for horizontal directional drilling versus open cut in an urban environment.” Pract. Period. Struct. Des. Constr. 13 (2): 85–92. https://doi.org/10.1061/(ASCE)1084-0680(2008)13:2(85).
Xueqing, W., L. Bingsheng, E. N. Allouche, and L. Xiaoyan. 2008. “Practical bid evaluation method considering social costs in urban infrastructure projects.” In Proc., 2008 4th IEEE Int. Conf. on Management of Innovation and Technology, 617–622. New York: IEEE.
Yedla, S., and R. M. Shrestha. 2003. “Multi-criteria approach for the selection of alternative options for environmentally sustainable transport system in Delhi.” Transp. Res. Part A Policy Pract. 37 (8): 717–729.
Zaneldin, E. K. 2007. “Trenchless construction: An emerging technology in United Arab Emirates.” Tunnelling Underground Space Technol. 22 (1): 96–105. https://doi.org/10.1016/j.tust.2006.04.001.
Zebardast, E. 2013. “Constructing a social vulnerability index to earthquake hazards using a hybrid factor analysis and analytic network process (F’ANP) model.” Nat. Hazards 65 (3): 1331–1359. https://doi.org/10.1007/s11069-012-0412-1.
Zebardast, E. 2014. “Application of F’ANP in urban planning.” Honar-Ha-Ye-Ziba: Memary Va Shahrsazi 19 (2): 23–38.
Zhu, K., S. Dong, S. X. Xu, and K. L. Kraemer. 2006. “Innovation diffusion in global contexts: Determinants of post-adoption digital transformation of European companies.” Eur. J. Inf. Syst. 15 (6): 601–616. https://doi.org/10.1057/palgrave.ejis.3000650.
Zhu, K., K. Kraemer, and S. Xu. 2002. “A cross-country study of electronic business adoption using the technology-organization-environment framework.” In Proc., ICIS 2002 Proc., 31. Los Angeles: Univ. of California.
Zhu, K., K. Kraemer, and S. Xu. 2003. “Electronic business adoption by European firms: A cross-country assessment of the facilitators and inhibitors.” Eur. J. Inf. Syst. 12 (4): 251–268. https://doi.org/10.1057/palgrave.ejis.3000475.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 150Issue 1January 2024

History

Received: Feb 16, 2023
Accepted: Aug 25, 2023
Published online: Oct 25, 2023
Published in print: Jan 1, 2024
Discussion open until: Mar 25, 2024

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Seyyed Hamed Afzali Borujeni [email protected]
Ph.D. Student, Dept. of Civil Engineering, Najafabad Branch, Islamic Azad Univ., Najafabad, Iran. Email: [email protected]
Mohammadreza Zare [email protected]
Assistant Professor, Dept. of Civil Engineering, Najafabad Branch, Islamic Azad Univ., Najafabad, Iran. Email: [email protected]
Leyla Adelzade Saadabadi [email protected]
Assistant Professor, Dept. of Civil Engineering, Najafabad Branch, Islamic Azad Univ., Najafabad, Iran (corresponding author). Email: [email protected]; [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share