Design, Development, and In Situ Testing of Lunar Technologies
Publication: Earth and Space 2022
ABSTRACT
As space agencies again turn their sights to lunar exploration, they will find a dearth of modern technologies at TRL 7–9 for the lunar environment. As a remedy, NASA is enabling new commercial testing services in tandem with commercial partners to provide a path for achieving TRL 8 or 9 through technology demonstrations on the lunar surface, including two from Aegis Aerospace, Inc. Transport to and operation on the Moon require survival of thermal extremes, extended radiation exposure, hard vacuum, pervasive dust, and other lunar peculiarities. In addition to environmental considerations, practical size, weight, and power (SWaP) considerations require systems to balance mass and structure, design electronics and software for power and bandwidth restrictions, and devise intelligent operations and ground systems. In combination with traditional verification and validation, several comprehensive tests are appropriate for lunar operations, including dusty TVAC, orbital demonstrations, and integrated mission lifetime testing at the payload and system levels. However, it is impossible to fully replicate the lunar environment, resulting in residual risk that cannot be fully mitigated with testing in simulated environments. While the lunar environment harbors many unknowns, this paper provides information for successfully designing, developing, and testing the technologies that will be integral to establishing a constant presence on the Moon.
Get full access to this article
View all available purchase options and get full access to this chapter.
REFERENCES
Anand, M., et al. (2012). A brief review of chemical and mineralogical resources on the Moon and likely initial in situ resource utilization (ISRU) applications. Planetary and Space Science, 74, 42–48. Retrieved from https://research.vu.nl/en/ publications/6fc0ee25-76f6-4855-9e77-c3fada1180b4
Ars Technica. (2021). An intuitive machine. Retrieved from https://arstechnica.com/science/2021/05/for-lunar-cargo-delivery-NASA-accepts-risk-in-return-for-low-prices/
Astrobotic. (2018). Peregrine lunar lander payload user’s guide. Retrieved from https://explorers.larc.NASA.gov/2019APSMEX/MO/pdf/Astrobotic\%20-\%20Payload\%20User\%20Guide\%20v3\%202018-10.pdf
Astrobotic. (2021). Lunar delivery: Landers. Retrieved from https://www.astrobotic.com/lunar-delivery/landers/
Boyce, J. M., Giguere, T., Muginis-Mark, P., Glotch, T., & Taylor, G. J. (2018). Geology of mairan middle dome: Its implication to silicic volcanism on the Moon. Planetary and Space Science, 162, 62–72. Retrieved from http://aram.ess.sunysb.edu/tglotch/TDG76.pdf
Chang, K. (2021). On Mars, NASA’s perseverance rover drilled the rocks it came for. Retrieved from https://www.nytimes.com/2021/09/02/science/mars-rover-rocks.html
Clark, S. (2021). Chinese mission returned nearly 4 pounds of lunar samples. Retrieved from https://spaceflightnow.com/2021/01/01/chinese-mission-returned-nearly-4-pounds-of-lunar-samples/
Corda, S. (2017). First flights. In Introduction to aerospace engineering with a flight test perspective (p. 1–97). West Sussex, United Kingdom: Wiley.
Costes, N., Farmer, J. E., & George, E. B. (1972, December). Mobility performance of the lunar roving vehicle: Terrestrial studies - Apollo 15 results (Tech. Rep. No. NASA TR R-401). NASA Marshall Space Flight Center.
David, L. (2019). Chinese rover and lander survive 1st frigid night on Moon’s far side.
ESA. (2021). Chang’e-3. Retrieved from https://earth.esa.int/web/eoportal/ satellite-missions/c-missions/chang-e-3
Firefly. (2021). Lunar lander. Retrieved from https://firefly.com/lunar-lander/
Foust, J. (2021). Intuitive Machines’ first lunar lander mission slips to 2022. Retrieved from https://spacenews.com/intuitive-machines-first-lunar-lander-mission-slips-to-2022/
GSFC. (2021, April). General environmental verification standard (GEVS) for GSFC flight programs and projects (Tech. Rep. No. GSFC-STD-7000b). NASA Goddard Space Flight Center.
Gustafson, R., White1, B., Gustafson, M., & Fournelle, D. J. (2007). Development of high-fidelity lunar regolith simulants with agglutinates. In Lunar and dust regolith simulant workshop. Huntsville, AL.
Henninger, J. H. (1984). Solar absorptance and thermal emittance of some common spacecraft thermal-control coatings. NASA Reference Publication, 1121. Retrieved from https://core.ac.uk/download/pdf/42849156.pdf
Howell, E. (2018). NASA’s Spirit rover: Revealing Mars’ early, wet history. Retrieved from https://www.space.com/18766-spirit-rover.html
Hutchison, C., Zizyte, M., Lanigan, P. E., Guttendorf, D., Wagner, M., Goues, C. L., & Koopman, P. (2018). Robustness testing of autonomy systems. In 40th annual conference on software engineering: Software engineering in practice (pp. 276–285). Gothenburg, Sweden.
Jordan, A. P., et al. (2014). Deep dielectric charging of regolith within the Moon’s permanently shadowed regions. JGR Planets, 119, 1806–1821. Retrieved from https://agupubs.onlinelibrary.wiley.com/doi/full/10.1002/2014JE004648
Krebs, G. (2021). Gunter’s space page. Retrieved from https://space.skyrocket.de
Lucey, P. G., et al. (2014). The global albedo of the Moon at 1064 nm from lola. Journal of Geophysical Research: Planets, 119, 1665–1679. Retrieved from https://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.726.2527&rep=rep1&type= pdf
McKay, D., et al. (1991). The lunar regolith. In Lunar sourcebook (p. 285–356). Cambridge University Press.
Mire, C. (2021). Aegis Aerospace Inc begins work on a lunar surface test facility for government and commercial use. Retrieved from https://meitechinc.com/2021/08/23/aegis-aerospace-inc-begins-work-on-a-lunar-surface-test-facility-for-government-and-commercial-use/
MSFC. (1991, June). General environmental test guidelines for protoflight instruments and experiments (Tech. Rep. No. MSFC-HDBK-670). NASA Marshall Space Flight Center.
Musk, E. (2018). First private passenger on lunar starship mission. Retrieved from https://www.youtube.com/watch?v=zu7WJD8vpAQ
NASA. (2016). Lunar rocks and soils from apollo missions. Retrieved from https://curator.jsc.NASA.gov/lunar/
NASA. (2017). About the space station solar arrays. Retrieved from https://www.nasa.gov/missionpages/station/structure/elements/solar-arrays-about.html
NASA. (2019a). Appendix s: Concept of operations annotated outline. Retrieved from https://www.nasa.gov/seh/appendix-s-concept-of-operations
NASA. (2019b, December). Cross-program design specification for natural environments (Tech. Rep. No. SLS-SPEC-159 Rev G).
NASA. (2019c). Software engineering life-cycle requirements. In NASA software engineering requirements.
NASA. (2020a). Artemis plan: NASA’s lunar exploration program overview. Retrieved from https://www.nasa.gov/sites/default/files/atoms/files/artemis plan-20200921.pdf
NASA. (2020b). Moon investments prepare us for mars. Retrieved from https://www.nasa.gov/sites/default/files/atoms/files/Moon-investments-prepare-us-for-mars.pdf
NASA. (2020c). NASA’s plan for sustained lunar exploration and development. Retrieved from https://www.nasa.gov/sites/default/files/atoms/files/a_sustained_lunar_presence_nspc_report4220final.pdf
NASA. (2021a). Around the Moon with NASA’s first launch of SLS with Orion. Retrieved from https://www.nasa.gov/feature/around-the-Moon-with-NASA-s-first-launch-of-sls-with-orion
NASA. (2021b, September). Classifications and requirements for testing systems and hardware to be exposed to dust in planetary environments (Tech. Rep. No. NASA-STD-1008).
NASA. (2021c). Commercial lunar payload service. Retrieved from https://www.nasa.gov/content/commercial-lunar-payload-services
NASA. (2021d). Fission surface power. Retrieved from https://www.nasa.gov/missionpages/tdm/fission-surface-power
NASA. (2021e). NASA selects Firefly Aerospace for Artemis commercial Moon delivery in 2023. Retrieved from https://www.nasa.gov/press-release/NASA-selects-firefly-aerospace-for-artemis-commercial-Moon-delivery-in-2023
NASA. (2021f). Queqiao. Retrieved from https://nssdc.gsfc.NASA.gov/nmc/spacecraft/display.action?id=QUEQIAO
NASA. (2021g). Viper. Retrieved from https://www.nasa.gov/viper
Niksirat, P., Daca, A., & Skonieczny, K. (2020). The effects of reduced-gravity on planetary rover mobility. The International Journal of Robotics Research, 39(7), 797–811. Retrieved from
Office of Nuclear Energy. (2008). Powering curiosity: Multi-mission radioisotope thermoelectric generators. Retrieved from https://www.energy.gov/ne/articles/powering-curiosity-multi-mission-radioisotope-thermoelectric-generators
Rajagopalan, R. P. (2021). The Artemis accords and global lunar governance. Retrieved from https://www.orfonline.org/research/the-artemis-accords-and-global-lunar-governance/
Reuters. (n.d.). Vulcan rocket launch in 2019 may end U.S. dependence on Russia. Retrieved from shorturl.at/bceEP
Waldron, R. D. (1990). Lunar base power requirements, options growth. In Engineering, construction, and operations in space II. Albuquerque, NM.
Williams, D. R. (2020). Moon fact sheet. Retrieved from https://nssdc.gsfc.NASA.gov/planetary/factsheet/Moonfact.html
Williams, J.-P., Paige, D., Greenhagen, B., & Sefton-Nash, E. (2017). The global surface temperatures of the Moon as measured by the diviner lunar radiometer experiment. Icarus, 283, 300–325. Retrieved from https://www.sciencedirect.com/science/article/pii/S0019103516304869
Witze, A. (2016). Software error doomed Japanese Hitomi spacecraft. Retrieved from https://www.scientificamerican.com/article/ software-error-doomed-japanese-hitomi-spacecraft/
Information & Authors
Information
Published In
History
Published online: Jan 5, 2023
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.