Cost Analysis of a Mass Timber Building Project: Comparison of Budgeted and Actual Construction Cost
Publication: Construction Research Congress 2022
ABSTRACT
Mass timber is considered as a sustainable alternative to traditional building materials such as concrete and steel. However, due to a lack of sufficient mass timber construction projects, the US construction practitioners are not familiar with the cost details of mass timber buildings. Cost is an important parameter of any construction project, and the availability of adequate cost information from previous projects helps to tackle cost-related challenges associated with building construction. This study presents comprehensive cost information of a tall mass timber building construction located in Canada. The methodology of the study was developed by comparing the budgeted construction cost of the building to the actual construction cost of the building. The budgeted cost was estimated before commencing the construction, and the actual construction cost was calculated after the completion of all construction activities. The outcomes of the study show that the actual construction cost of the building was 1.2% ($473,758) higher than the budgeted cost, including a schedule delay of five months due to failures of elevators and storefront trades. Metalworks, furnishing, and utility activities were found higher for actual cost compared to budgeted cost. Contrarily, the cost of engineered wood and plastic, exterior improvement, and installation of mechanical facilities were found lower in actual construction cost. The actual construction cost also incorporated change orders that cost an additional $2,155,549. The study will help US industry practitioners and owners to make decisions regarding their initial investments in a mass timber building project.
Get full access to this article
View all available purchase options and get full access to this chapter.
REFERENCES
Ahmed, S., and Arocho, I. (2021). “Analysis of cost comparison and effects of change orders during construction: Study of mass timber and a concrete building project”. Journal of Building Engineering, 33, 101856. https://doi.org/10.1016/j.jobe.2020.101856.
Ahmed, S., and Arocho, I. (2019). “Characteristics of the emission of particulate matters in construction site: A comparative study on a timber and a steel construction project”. In: Proceeding of the 2019 CSCE Annual Conference, Montreal, Canada. https://csce.ca/elf/apps/CONFERENCEVIEWER/conferences/2019/pdfs/PaperPDFversion_19_0209102530.pdf.
Ahmed, S., and Arocho, I. (2019). “Emission of particulate matters (PM) during construction: A comparative study on a cross-laminated timber (CLT) and a steel building project”. Journal of Building Engineering, 22: 281–294. https://doi.org/10.1016/j.jobe.2018.12.015.
Ahmed, S., and Arocho, I. (2020). “Mass timber building materials in the U.S. construction industry: Determining the existing awareness level, construction-related challenges, and recommendations to increase its current acceptance level”. Cleaner Engineering and Technology, DOI: https://doi.org/10.1016/j.clet.2020.100007.
Burback, B., and Pei, S. (2017). “Cross-Laminated Timber for Single-Family Residential Construction: Comparative Cost Study”. Journal of Architectural Engineering, DOI: https://doi.org/10.1061/(ASCE)AE.1943-5568.0000267.
Cazemier, D. (2017). “Comparing Cross-Laminated Timber with Concrete and Steel: A Financial Analysis of Two Buildings in Australia.” In: Modular and Offsite Construction Summit and the 2nd International Symposium on Industrialized Construction Technology, Shanghai, China.
Du, J., El-Gafy, M., and Zhao, D. (2015). “Optimization of change order management process with object-oriented discrete event simulation: A case study”. Journal of Construction Engineering and Management, DOI: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001092.
FPInnovations. (2013). CLT Handbook. FPInnovations. Montreal, Canada.
Fragiacomo, M., Smith, T., and Pampanin, S. (2009). “Construction Time and Cost for Post- Tensioned Timber Buildings”. Construction Materials, DOI:https://doi.org/10.1680/coma.2009.162.4.141.
John, S., and Buchanan, A. (2012). “Cost and Construction Time for a 3-Story Post Tensioned Timber Building Compared with Concrete and Steel Building.” In: Proceedings of the 2012 World Conference on Timber Engineering, Auckland, New Zealand.
Kordziel, S. (2018). Study of Moisture Conditions in a Multi-Story Timber Building Through the Use of Sensors and Wufi Hygrothermal Modeling. Master’s Thesis. Retrieved 2020 from: https://hdl.handle.net/11124/172342.
Mallo, M., and Espinoza, O. (2015). “Awareness, perceptions and willingness to adopt cross- laminated timber by the architect community in the United States”. Journal of Cleaner Production, 94:198–210.
Mohammadi, J., and Ling, L. (2017). “Can wood become an alternative material for tall building construction?”. Practice Periodical on Structural Design and Construction, 22(4):04017014. DOI: https://doi.org/10.1061/(ASCE)SC.1943-5576.0000334.
Mohammad, M., Gagnon, S., Douglas, B., and Podesto, L. (2012). “Introduction to Cross Laminated Timber”. Wood Design Focus V.22, N.2.
Smith, R., Griffin, G., and Rice, T. (2015). Solid Timber Construction: Process, Practice, Performance. The University of Utah, Salt Lake City, UT.
Van De Kuilen, J. W. G., Ceccotti, A., Xia, Z., and He, M. (2011). “Very Tall Wooden Building with Cross Laminated Timber”. In: Proceeding of the Twelfth East Asia-Pacific conference on Structural Engineering and Construction, Hong Kong.
Yates, M., Linegar, M., and Dujic, B. (2008). “Design of an 8 Storey Residential Tower from KLH Cross Laminated Solid Timber Panels”. Retrieved 2020 from: http://www.ewpa.com/Archive/2008/june/Paper299.pdf.
Information & Authors
Information
Published In
History
Published online: Mar 7, 2022
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.