CMAR Procurement in US Public Projects: Qualifications-Driven Processes and Criteria

Publication: Construction Research Congress 2022

ABSTRACT

Construction manager at risk (CMAR) emerged as an alternative project delivery method for efficient delivery of construction projects. In CMAR, the design is not completed when the contractor is selected; therefore, a price-focused contractor selection based on the lowest bid is often not appropriate. Instead, qualifications-driven processes are used. The objective of this paper is to identify the current practices of multi-stepped qualifications-based selection (QBS) processes while also uncovering the major qualification criteria used for CMAR projects. A total of 33 CMAR requests for qualifications (RFQs) and request for proposals (RFPs) were collected from 30 states. Patterns were discovered in the selection processes along with qualification criteria, prioritizing firm experience, key personnel, past performance, and the contractor’s approach to the project, which all rose to the top of the criteria list for CMAR projects. This research supports project owners developing RFQs and RFPs by informing a successful CMAR selection process.

Get full access to this article

View all available purchase options and get full access to this chapter.

REFERENCES

Abkarian, H., El Asmar, M., and Underwood, S. (2017). “Impact of alternative project delivery systems on the international roughness index: Case studies of transportation projects in the western United States.” Transportation Research Record, 2630(1), 76–84.
Alleman, D., Papajohn, D., Gransberg, D. D., El Asmar, M., and Molenaar, K. R. (2017a). “Exploration of early work packaging in construction manager–general contractor highway projects.” Transportation Research Record, 2630(1), 68–75.
Alleman, D., Antoine, A., Gransberg, D. D., and Molenaar, K. R. (2017b). “Comparison of qualifications-based selection and best-value procurement for construction manager–general contractor highway construction.” Transportation Research Record, 2630(1), 59–67.
Best, R. D. (2021). “Public construction spending on highway and street projects in the U.S. from 2009 to 2020(in billion U.S. dollars).” Statista, https://www.statista.com/statistics/238570/us-public-construction-spending-on-highway-and-street-projects/ (April 29, 2021).
Chen, Q., Jin, Z., Xia, B., Wu, P., and Skitmore, M. (2016). “Time and cost performance of design–build projects.” Journal of Construction Engineering and Management, 142(2), 04015074.
Christodoulou, S., Griffis, F., Barrett, L., and Okungbowa, M. (2004). “Qualifications-based selection of professional A/E services.” Journal of Management in Engineering, 20(2), 34–41.
Cho, N., El Asmar, M., Underwood, S., and Kamarianakis, Y. (2020). “Long-Term Performance Benefits of the Design-Build Delivery Method Applied to Road Pavement Projects in the US.” KSCE Journal of Civil Engineering, 1–11.
Drexler, J. A., and Larson, E. W. (2000). “Partnering: Why project owner–contractor relationships change.” J. Constr. Eng. Manage., 126(4), 293–297.
El Asmar, M., and Bearup, W. (2021). “Qualification-Driven Procurement”. Book Chapter. In Press.
El Wardani, M. A., Messner, J. I., and Horman, M. J. (2006). “Comparing procurement methods for design-build projects.” Journal of construction engineering and management, 132(3).
Feghaly, J., El Asmar, M., and Ariaratnam, S. T. (2020). “State of professional practice for water infrastructure project delivery.” Practice Periodical on Structural Design and Construction, 25(3), 04020018.
Fellows, R., and Liu, A. (2003). Research methods for construction. 2nd Ed., Blackwell Science, Oxford, U.K.
Francom, T., El Asmar, M., and Ariaratnam, S. T. (2014). “Using alternative project delivery methods to enhance the cost performance of trenchless construction projects.” In Construction Research Congress 2014: Construction in a Global Network (pp. 1219–1228).
Francom, T., El Asmar, M., and Ariaratnam, S. T. (2016a) “Schedule Performance of Construction Manager at Risk (CMAR) Delivery on Pipeline Engineering and Construction Projects.” Proc., Construction Research Congress 2016, 569–578.
Francom, T., El Asmar, M., and Ariaratnam, S. T. (2016b). “Performance analysis of construction manager at risk on pipeline engineering and construction projects.” Journal of Management in Engineering, 32(6), 04016016.
Francom, T., El Asmar, M., and Ariaratnam, S. T. (2017). “Longitudinal study of construction manager at risk for pipeline rehabilitation.” Journal of Pipeline Systems Engineering and Practice, 8(2), 04017001.
Gransberg, D. D., and Shane, J. S. (2010). “Construction manager-at-risk project delivery for highway programs.” Transportation Research Board.
Gransberg, N. J., and Gransberg, D. D. (2020). “Public project construction manager-at-risk contracts: Lessons learned from a comparison of commercial and infrastructure projects.” Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 12(1), 04519039.
Kenig, M. E. (2011). Project Delivery Systems. AGC of America.
Lingard, H., Graham, P., and Smithers, G. (2000). “Employee perceptions of the solid waste management system operating in a large Australian contracting organisation: Implications for company policy implementation.” Constr. Manage. Econom., 18(4), 383–393.
Massachusetts Bay Transportation Authority. (2012). “GLX CM/GC PROCUREMENT 25 MANUAL for the Green Line Extension Project.” https://docplayer.net/34930622-Cm-gc-glx-cm-gc-procurement-manual-for-the-green-line-extension-project-construction-manager-general-contractor.html.
Mayring, P. (2000). “Qualitative Content Analysis.” Forum Qualitative Sozialforschung/Forum: Qualitative Social Research, 1(2). https://doi.org/10.17169/fqs-1.2.1089.
Molenaar, K. R., Songer, A. D., and Barash, M. (1999). “Public-sector design/build evolution and performance.” Journal of management in engineering, 15(2), 54–62.
Papajohn, D., El Asmar, M., and Molenaar, K. R. (2019). “Contract administration tools for design-build and construction manager/general contractor highway projects.” Journal of Management in Engineering, 35(6), 04019028.
Papajohn, D., El Asmar, M., Molenaar, K. R., and Alleman, D. (2020). “Comparing contract administration functions for alternative and traditional delivery of highway projects.” Journal of Management in Engineering, 36(1), 04019038.
Rojas, E. M., and Kell, I. (2008). “Comparative analysis of project delivery systems cost performance in Pacific Northwest public schools.” Journal of Construction Engineering and Management, 134(6), 387–397.
Shalwani, A., Lines, B. C., and Smithwick, J. B. (2019). “Differentiation of evaluation criteria in design-build and construction manager at risk procurements.” Journal of Management in Engineering, 35(5), 04019017.
Shrestha, P. P., Batista, J., and Maharjan, R. (2016). “Risks Involved in Using Alternative Project Delivery (APD) Methods in Water and Wastewater Projects.” Procedia Engineering, 145, 219–223.
Shrestha, P. P., Davis, B., and Gad, G. M. (2020). “Investigation of legal issues in construction-manager-at-risk projects: case study of airport projects.” Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 12(3), 04520022.
State of Louisiana Coastal Protection and Restoration Authority. (2017). “Request for Qualifications for Construction Management at Risk (CMAR) Contractor.”.
State of Washington Department of Natural Resources. (2016). “Qualification for Contract Harvesting Services Eligible Bidder Pool.”.
Sullivan, J., El Asmar, M., Chalhoub, J., and Obeid, H. (2017). “Two decades of performance comparisons for design-build, construction manager at risk, and design-bid-build: Quantitative analysis of the state of knowledge on project cost, schedule, and quality.” Journal of construction engineering and management, 143(6), 04017009.
Weber, R. P. (1990). “Basic content analysis” (No. 49). Sage Publications. Newburry Park, CA.

Information & Authors

Information

Published In

Go to Construction Research Congress 2022
Construction Research Congress 2022
Pages: 189 - 199

History

Published online: Mar 7, 2022

Permissions

Request permissions for this article.

Authors

Affiliations

Hala Sanboskani, S.M.ASCE [email protected]
1Ph.D. Student, School of Sustainable Engineering and the Built Environment, Arizona State Univ., Tempe, AZ. Email: [email protected]
Mounir El Asmar, Ph.D., A.M.ASCE [email protected]
2Associate Professor and Co-Director, National Center of Excellence on SMART Innovations, School of Sustainable Engineering and the Built Environment, Arizona State Univ., Tempe, AZ. Email: [email protected]
Bahaa Chammout [email protected]
3Undergraduate Student, Dept. of Civil and Environmental Engineering, American Univ. of Beirut, Beirut, Lebanon. Email: [email protected]
Oscar Bou Maachar [email protected]
4Undergraduate Student, Dept. of Civil and Environmental Engineering, American Univ. of Beirut, Beirut, Lebanon. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$226.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$226.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share