Utility Coordination in Alternative Delivery Methods for Transportation Projects: Lessons Learned from In-Market Design Phase (Bid Process)

Publication: Pipelines 2020

ABSTRACT

In large linear infrastructure projects under public private partnership (P3), one of the principal risk contributors are the subsurface utilities impacted that need to be either protected or relocated. In fact, utility relocation may be a significant factor in selecting a preferred construction methods or even dictating changes on design disciplines. The P3 model is designed share risk between private and public entities. This alternate delivery approaches have an accelerated nature with aggressive schedules, where minor utility conflicts can result in significant costs and schedule impacts. The utility coordination task is a key driver and sets the critical path on the schedule. Therefore, early engagement of utility agencies in the project will be crucial, even from the initial planning phase of the project. The use of Transportation Association of Canada (TAC) guidelines and utility relocation procedures are the key elements to a successful project win and delivery.

Get full access to this article

View all available purchase options and get full access to this chapter.

REFERENCES

Bentley Systems Inc. “Figure 2 3D rendering of subsurface utility pipes inside a virtual excavation tool” <https://www.engineering.com/ARVR/ArticleID/12233/Augmented-Reality-for-Architects-and-Civil-Engineers.aspx> (May, 27, 2016).
TAC (Transportation Association of Canada) “Guidelines for the Coordination of Utility Relocations” <https://www.tac-atc.ca/sites/tac-atc.ca/files/site/doc/resources/rpt-cure.pdf> (June, 2016).

Information & Authors

Information

Published In

Go to Pipelines 2020
Pipelines 2020
Pages: 104 - 112
Editors: J. Felipe Pulido, OBG, Part of Ramboll and Mark Poppe, Brown and Caldwell
ISBN (Online): 978-0-7844-8321-3

History

Published online: Aug 6, 2020
Published in print: Aug 6, 2020

Permissions

Request permissions for this article.

Authors

Affiliations

Juan Camilo Barrera [email protected]
P.Eng.
Associate Manager, Civil Engineering, IBI Group, Toronto, ON, Canada; Vice-Chair of the Public Utility Management Subcommittee from the Transportation Association of Canada (TAC); Co-Chair of UESI Ontario. Email: [email protected]
Tomasz (Tom) Bodera [email protected]
P.Eng.
Project Manager, Civil Engineering, IBI Group, Toronto, ON, Canada. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$90.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$90.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share