Chapter
Nov 9, 2020
Construction Research Congress 2020

Project Performance of Public-Private Partnership Projects Based on Various Contract Agreements and Correlation with Funding Mechanism

Publication: Construction Research Congress 2020: Project Management and Controls, Materials, and Contracts

ABSTRACT

In the past, the state department of transportations (DOTs) used to build the highways and bridges through the traditional delivery method, design-bid-build (DBB). However, in the last couple of decades, alternative delivery methods, design-build (DB), and general contractor/construction management (GC/CM) were widely used in the construction of highways and bridges. These alternative delivery methods were employed when the state had a hundred percent funding available for the design and construction of the projects. Due to the scarcity of the public fund for highways and bridges, recently the public-private partnership (PPP) delivery method has been developed, so that the state can benefit from private funding to build the public projects. There are various types of PPP contract agreements, e.g., design-build-finance-operate-maintenance (DBFOM), design-build-finance-operate (DBFO), design-build-finance- maintenance (DBFM), and build-operate-transfer (BOT). Considering the recent use of different PPPs in highway and bridge projects, no study has been conducted to determine whether the type of PPP contract agreements has any effect on the cost and schedule performance of the projects. Therefore, this study has collected 10 PPP projects with two types of contract agreements, DBFOM and DBFM, to determine if there is any project performance difference in PPP projects. Through a data analysis, the results showed a slightly better cost performance and a significantly better schedule performance for DBFOM projects. Investigating funding and finance sources revealed the considerable difference in public funding and private finance between these two PPP agreements, which may be attributable to the difference found in cost and schedule performance. There have been some limitations in the number of projects, first due to the number of existing projects, and second, the available data to collect for the analysis. Similar to any new adoption, this limitation will be eliminated over time.

Get full access to this article

View all available purchase options and get full access to this chapter.

REFERENCES

AECOM Consult. (2007). Case studies of transportation public-private partnerships around the world. Arlington, Virginia: Federal Highway Administration.
Airoldi, M., Chua, J., Gerbert, P., Jestus, J., & Rilo, R. (2013). Meeting the Infrastructure Challenge with Public-Private Partnerships: Bridging the Gap. Retrieved August, 22, 2014.
Bain, R. ConstructionRisk—What Risk? Project Finance International, Vol. 246, 2010, pp. 46–50.
Chasey, A.D., Maddex, W. and Bansal, A. (2012), “Comparison of public-private partnerships and traditional procurement methods in North American highway construction”, Transportation Research Record, No. 2268, pp. 26-32.
Chen, Z., Daito, N., & Gifford, J. L. (2016). Data review of transportation infrastructure public–private partnership: A meta-analysis. Transport reviews, 36(2), 228-250.
CMAANAT, (2016). “Public - Private Partnership Projects – What, Why & How is Risk Allocated?”. Available at https://www.cmaanet.org/sites/default/files/2018-04/PUBLIC%20%20PRIVATE%20PARTNERSHIP%20PROJECTS.pdf
Fathi, M., and Shrestha, P. P. (2018). Performance comparison of design-build projects for highways and buildings. In Construction Research Congress 2018 (pp. 139-149).
Fathi, M., Shrestha, P.P., and Binita Shakya (2019). “Change Orders and Schedule Performance of DB Infrastructure Projects: A Comparison between Highway and Water Wastewater Projects”, ASCE Journal of Legal Affairs and Dispute Resolution in Engineering and Construction. (Accepted)
Federal Highway Administration (FHWA). (2006). Design-build effectiveness study, Washington, DC.
Federal Highway Administration (FHWA), (2019). Washington, DC: FHWA. Available at https://www.fhwa.dot.gov/ipd/p3/p3_projects/
FHWA, U.S. Department of Transportation. P3 Defined. Available at https://www.fhwa.dot.gov/ipd/p3/defined/. Accessed June, 2019.
Gad, G. M., B. Davis, P.P. Shrestha, and P. Harder. 2019a. “Lessons Learned from Progressive Design-Build Implementation projects.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 11 (4): 04519020. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000320
Gad, G. M., B. Davis, P.P. Shrestha, and M. Fathi. 2019b. “Legal and Contractual Issues in Lump Sum Design-Build Implementation on Large-Scale Airport Projects.” J. Leg. Aff. Dispute Resolut. Eng. Constr. (Accepted July 2019)
Garemo, Jan Mischke, Martin Hjerpe, and Robert Palter, Bridging Global Infrastructure Gaps, McKinsey Global Institute, 2016.
Garvin, M. J. (2009). Enabling development of the transportation public-private partnership market in the United States. Journal of construction engineering and management, 136(4), 402-411.
Garvin, M., Molenaar, K. R., Navarro, D., & Proctor, G. (2011). Key performance indicators in public-private partnerships: A state-of-the-practice report (No. FHWA-PL-10-029). United States. Federal Highway Administration. Office of International Programs.
Gransberg, D. D., D. F. Runde, and J. Stergios. The Effect of Innovative Highway Construction Contract Methods. AACE International Transactions, 2000.
HMTreasury, Partnerships for Prosperity: the Private Finance Initiative, London, 1998.
Iseki, H., & Houtman, R. (2012). Evaluation of progress in contractual terms: Two case studies of recent DBFO PPP projects in North America. Research in Transportation Economics, 36(1), 73-84.
Ibbs, W., Kwak, Y., Ng, T., and Odabasi, A. (2003). “Project delivery systems and project change: Quantitative analysis.” J. Constr. Eng. Manage., 129(4), 382–387.
Kwak, Y. H., Chih, Y., & Ibbs, C. W. (2009). Towards a comprehensive understanding of public private partnerships for infrastructure development. California management review, 51(2), 51-78.
MacDonald, M. Review of Large Public Procurement in the UK. Prepared for HM Treasury, 2002.
McNichol, D., & Fund, S. A. I. (2013). The United States: The World’s Largest Emerging P3 Market. Star America Infrastructure Fund and AIG.
Papajohn, D., Cui, Q., & Bayraktar, M. E. (2010). Public-private partnerships in US transportation: Research overview and a path forward. Journal of Management in Engineering, 27(3), 126-135.
PWF (Public Works Financing). (2014). “Major projects database”.
Raisbeck, P., Duffield, C., & Xu, M. (2010). Comparative performance of PPPs and traditional procurement in Australia. Construction Management and Economics, 28(4), 345-359.
Ramsey, D. W., & El Asmar, M. (2015). Cost and Schedule Performance Benchmarks of US Transportation Public-Private Partnership Projects: Preliminary Results. Transportation Research Record, 2504(1), 58-65.
Rosner, J. W., Thal Jr, A. E., and West, C. J. (2009). “Analysis of the design-build delivery method in air force construction projects.” J. Constr. Eng. Manage., 135(8), 710-717.
Shrestha, P. P. Performance Benchmarking of Large Highway Projects. PhD thesis. University of Texas at Austin, 2007.
The World Bank, Public-Private Partnership Units: Lessons for their Design and Use in Infrastructure, Washington, D.C., 2007.
Tymvios, N., McCullouch, B. G., and Sinha, K. C. (2002). “An Initial Evaluation of Design-Build Highway Projects Performed by the Indiana Department of Transportation”.
Warne, T. R. (2005). Design build contracting for highway projects: A performance assessment, Tom Warne and Associates, South Jordan, UT.
Wibowo, A., and Kochendörfer, B. (2005). “Financial risk analysis of project finance in Indonesian toll roads”. Journal of Construction Engineering and Management, 131(9), 963-972.
Yuan, J., Zeng, A. Y., Skibniewski, M. J., and Li, Q. (2009). “Selection of performance objectives and key performance indicators in public–private partnership projects to achieve value for money”. Construction Management and Economics, 27(3), 253-270.

Information & Authors

Information

Published In

Go to Construction Research Congress 2020
Construction Research Congress 2020: Project Management and Controls, Materials, and Contracts
Pages: 1081 - 1090
Editors: David Grau, Ph.D., Arizona State University, Pingbo Tang, Ph.D., Arizona State University, and Mounir El Asmar, Ph.D., Arizona State University
ISBN (Online): 978-0-7844-8288-9

History

Published online: Nov 9, 2020

Permissions

Request permissions for this article.

Authors

Affiliations

Medya Fathi [email protected]
Ph.D. Candidate, Civil and Environmental Engineering and Construction Dept., Howard R. Hughes College of Engineering, Univ. of Nevada, Las Vegas, Las Vegas, NV. E-mail: [email protected]
Pramen P. Shrestha [email protected]
Professor, Civil and Environmental Engineering and Construction Dept., Howard R. Hughes College of Engineering, Univ. of Nevada, Las Vegas, Las Vegas, NV. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$294.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$294.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share