World Record 5.2 km HDD Twin Crossings of the Hong Kong Harbor
Publication: Pipelines 2019: Condition Assessment, Construction, and Rehabilitation
ABSTRACT
To meet the fuel demands of the expanded Hong Kong International Airport (HKIA), new twin aviation fuel pipelines were installed using horizontal directional drilling (HDD) by Langfang Huayuan Mechanical and Electrical Engineering Co., Ltd. The new pipelines included two parallel pipes with drive lengths of 17,060 ft. (5.2 km) each, a diameter of 20” (508 mm), and a buried depth of 330 ft. (100 m) under the seabed. The $1.3 billion HKD ($165.63 million USD) project started in early 2016. The first pipe installation was completed on December 27, 2017, and the second on March 9, 2018. The overall project duration was 30 months, which included 6 months for onsite preparation and 4 months stoppage due to the breeding season of the egret, a small bird. The length set a world record for HDD. As expected, the pipeline installation experienced numerous difficulties and challenges including pilot hole directional control, drilling fluid management, reaming torque, pullback force, and project management. The contractor optimized HDD intersect technology with an innovative “handshake” pilot hole drill-bit for the crossing. Additionally, they also utilized a global position system (GPS), sea surface ship positioning system, and geomagnetic sensing system to accurately guide the pilot hole. In order to reduce the reaming torque, a series of unique specialty reamers were developed for the extra-long distance reaming process. Accordingly, the contractor used a novel high-performance drilling fluid to meet the requirements of cuttings transportation and borehole stability. During the pipe pullback process, a redesigned thruster was used to protect the anticorrosive coating of the steel pipes. Additionally, the modular equipment accelerated the construction period greatly. With the aid of innovation and key drilling parameters, the contractor completed the world’s longest HDD crossing project successfully. Experiences learned in this project can be used as the HDD industry continues to break distance records.
Get full access to this article
View all available purchase options and get full access to this chapter.
REFERENCES
Bennett, R.D. and S.T. Ariaratnam (2017). Horizontal Directional Drilling Good Practices Guidelines, North American Society for Trenchless Technology, Cleveland, OH.
Carlin, M., S.T. Ariaratnam, B. Ma, and C. Zeng (2014). “Record Setting Yangtze River HDD Crossing of Three Parallel Pipelines over a Length of Nearly 3,300M”, Proceedings of No-Dig 2014, Orlando, FL, April 13-17, Paper TA-T2-01.
Ma, B., and M. Najafi, (2008). “Development and Applications of Trenchless Technology in China.” Tunneling and Underground Space Technology, Elsevier Limited, 476–480.
Ma, B., M. Najafi, H. Shen, and L. Wu (2010). “Risk Evaluation for Maxi Horizontal Directional Drilling Crossing Projects”, Journal of Pipeline Systems Engineering and Practice, 1(2), ASCE, Reston, VA.
Information & Authors
Information
Published In
Pipelines 2019: Condition Assessment, Construction, and Rehabilitation
Pages: 699 - 706
Editors: Jeffrey W. Heidrick, Burns & McDonnell and Mark S. Mihm, HDR
ISBN (Online): 978-0-7844-8249-0
Copyright
© 2019 American Society of Civil Engineers.
History
Published online: Jul 18, 2019
Published in print: Jul 18, 2019
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.