International Conference on Construction and Real Estate Management 2019
Operation and Maintenance Performance Evaluation of PPP Project in Urban Underground Comprehensive Pipe Gallery
Publication: ICCREM 2019: Innovative Construction Project Management and Construction Industrialization
ABSTRACT
Through studying the current situation of the urban underground comprehensive pipe gallery, it is found that there is no performance evaluation mechanism for the operation and maintenance stage. In order to improve the operation and maintenance efficiency of the urban underground comprehensive pipe gallery and enhance project safety management capabilities, this paper combines the characteristics of the urban underground comprehensive pipe gallery under PPP mode, and builds the performance evaluation model of operation and maintenance phase based on matter-element analysis method. It provides reference for performance evaluation management of similar projects in related industries.
Get full access to this article
View all available purchase options and get full access to this chapter.
REFERENCES
Chen, L. (2017). “A summary of research on performance evaluation of PPP projects.” Fiscal Science, (4), 90-96. (in Chinese).
He, X.D. (2017). Research on Operation and Maintenance Management of PPP Project in Urban Comprehensive Pipe Gallery in China. China University of Mining and Technology, Jiangsu, China. (in Chinese).
Li, W. (2017). “Analysis on difficulties in formulating operation and maintenance performance standards and estimating operation and maintenance costs in PPP mode.” Science Mosaic, 2017(6), 140-143. (in Chinese).
Liu, Y.J., Sun, L.Y. and Yang, K. (2017). “Research on performance evaluation of comprehensive pipe gallery under PPP mode.” Pearl River, 38(10), 105-108. (in Chinese).
Rafael, P.Z., Julio, C.M.S., Fernando, S.S. and Paulo, S.S. (2018). “Energy audit model based on a performance evaluation system.” Energy, 154(2018), 544-552.
Ruiz, J.L. and Sirvent, I. (2018). “Performance evaluation through DEA benchmarking adjusted to goals.” Omega, 2018(6), 32-34.
Wang, L., Yuan, G., Long, R. and Chen, H. (2017). “An urban energy performance evaluation system and its computer implementation.” Journal of Environmental Management, 204(1), 684-694.
Wei, X. (2018). Research on Performance Evaluation of Urban Comprehensive Pipe Gallery PPP Project. Beijing University of Civil Engineering and Architecture, Beijing, China, 28-30. (in Chinese).
Xu, M.F. (2016). “Research on the construction and operation management mode of integrated pipe gallery.” Low Carbon World, (18), 229-231. (in Chinese).
Zhang, L.Y. (2018). Research on Performance Evaluation of Urban Comprehensive Pipe Gallery Project under PPP Mode. Jilin Jianzhu University, Jilin, China, 48-56. (in Chinese).
Information & Authors
Information
Published In
ICCREM 2019: Innovative Construction Project Management and Construction Industrialization
Pages: 355 - 361
Editors: Yaowu Wang, Ph.D., Harbin Institute of Technology, Mohamed Al-Hussein, Ph.D., University of Alberta, and Geoffrey Q. P. Shen, Ph.D., Hong Kong Polytechnic University
ISBN (Online): 978-0-7844-8230-8
Copyright
© 2019 American Society of Civil Engineers.
History
Published online: Aug 29, 2019
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.