City of Taylor Rehabilitates 60-Year-Old Cast Iron Mains via Pre-Chlorinated Pipe Bursting
Publication: Pipelines 2018: Condition Assessment, Construction, and Rehabilitation
ABSTRACT
The city of Taylor, located in Wayne County, Michigan, serves a population north of 60,000 residents and, like many municipalities in the U.S. with aging and undersized infrastructure, they are experiencing systemic water system failures that require major system updates. For the city of Taylor, most of these recurring failures are happening in their residential neighborhood distribution piping, which consist of 60-year-old 6-inch cast iron water mains. The city with the help of their consultant, Wade Trim Engineering, decided that since the pipe issues were systemic and replacement of those water mains would require a larger diameter pipe, the preferred method of rehabilitation would be pre-chlorinated pipe bursting with the installation of an upsized 8-inch DR 18 fusible polyvinyl chloride pipe (FPVCP). This method meant less disruption to the homeowners’ property, provided a discrete water shut-off and disruption schedule for homeowners, and kept the installation of the new main within road rights-of-way and existing easements. Since the start of the project in September 2016, Bidigare Contractors have installed over 35,000 feet of 8-inch DR 18 FPVCP and 1,000 feet of 12-inch DR 18 FPVCP. This paper will review the basic steps and process for the pre-chlorinated pipe bursting method being used in Taylor. It will also review the results of the project construction and the program in general.
Get full access to this article
View all available purchase options and get full access to this chapter.
REFERENCES
AWWA C905 (2010), “Polyvinyl Chloride (PVC) Pressure Pipe and Fabricated Fittings, 14 In. Through 48 In. (350 mm Through 1,200 mm).” American Water Works Association, Denver, CO. January, 2010.
City of Taylor. Retrieved from https://www.cityoftaylor.com/
Wade Trim Associates, Inc. (2016) – Contract Documents and Specifications for City of Taylor 2016 Water Main Rehabilitation.
“Recommended Specification for Thermoplastic Pipe Joints, Pressure and Non-Pressure Applications,” Uni-Bell PVC Pipe Association, Dallas, Texas, November 2002.
Great Lakes Water Authority. Retrieved from https://www.glwater.org/
Information & Authors
Information
Published In
Pipelines 2018: Condition Assessment, Construction, and Rehabilitation
Pages: 658 - 663
Editors: Christopher C. Macey, AECOM and Jason S. Lueke, Ph.D., Associated Engineering
ISBN (Online): 978-0-7844-8165-3
Copyright
© 2018 American Society of Civil Engineers.
History
Published online: Jul 11, 2018
Published in print: Jul 12, 2018
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.