Chapter
Jul 11, 2018
Pipelines 2018

Large Diameter Tunnel, to Expedite Consent Decree Pipeline

Publication: Pipelines 2018: Condition Assessment, Construction, and Rehabilitation

ABSTRACT

The San Antonio metropolitan area has experienced sustained growth for decades, putting increased pressure on existing wastewater infrastructure. In June 2013, the San Antonio Water System (SAWS) approved a settlement agreement with the U.S. Environmental Protection Agency (EPA) that requires significant improvements to the SAWS wastewater system over a 10-year period to reduce sanitary sewer overflows (SSOs). This work includes the targeted replacement and rehabilitation of an aging infrastructure system that consists of over 5,200 miles of sewer pipe. One such pipeline is an existing 48-inch concrete trunk sewer which currently operates at capacity during dry periods and during periods of minimal rain, routinely experiences SSOs of 50,000 to 100,000 gallons or more. SAWS has identified the replacement of this critical sewer as one of its highest priorities, initiating design of a six-mile segment of 60- to 78-inch sewer to increase the current capacity. As a key component of the EPA consent order, this project was time-critical. Numerous challenges existed along this six-mile alignment, each of which had significant potential schedule impacts: narrow corridor through U.S. Military installation for over a mile; pipeline depths between 30 and 40 feet; construction under two Department of Transportation roadways and a municipal overpass; and alignment adjacent to a major waterway (Salado Creek) where historic artifacts, flood plain, and tree coverage were likely to require mitigation. In one example, a 4,000-foot tunnel was designed, over 30-feet deep, in a 25-foot easement, that was installed between transmission and distribution power lines, on a U.S. Military installation. This 94 ½-inch tunnel was installed via micro-tunneling, for a 78-inch fiberglass reinforced pipe (FRP) sewer carrier pipe. This paper will focus on four tunnels such as the tunnel mentioned above, each of which was designed and installed in locations that would eliminate the need for mitigation. In each location, special considerations were incorporated into the tunnel design related to depths, soil strata, reduction of time limiting impacts, and reduction of SSOs.

Get full access to this article

View all available purchase options and get full access to this chapter.

Information & Authors

Information

Published In

Go to Pipelines 2018
Pipelines 2018: Condition Assessment, Construction, and Rehabilitation
Pages: 546 - 554
Editors: Christopher C. Macey, AECOM and Jason S. Lueke, Ph.D., Associated Engineering
ISBN (Online): 978-0-7844-8165-3

History

Published online: Jul 11, 2018
Published in print: Jul 12, 2018

Permissions

Request permissions for this article.

Authors

Affiliations

Jeff Farnsworth [email protected]
P.E.
Kimley-Horn and Associates, Inc., 601 Northwest Loop 410, Suite 350, San Antonio, TX 78216. E-mail: [email protected]
David Bennett [email protected]
P.E.
Freese and Nichols, Inc., 9601 McAllister Fwy., Suite 1008, San Antonio, TX 78216. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$174.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart
Buy E-book
$174.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share