Two Proposed Basis Strategies for Delay Claims Assessments in Engineering Projects: An Iranian Perspective
Publication: ICCREM 2016: BIM Application and Off-Site Construction
ABSTRACT
The average time for the completion of all the projects in Iran is estimated to be 8.9 years. However, the same average for the completed projects in 2007 was reported to be 11.1 years. Any difference between the estimated time for the completion of a project and its actual time is called project delay. This delay equals the sum of all the delays in the activities in critical paths. Delay analysis includes identification, study, and analysis of factors causing delays, source of delays, and the role of each in the overall delay of a project. The study of the causes of delay in construction projects around the world demonstrates that the causes of delay are different in different countries. This is due to social and cultural differences, the type of contract and construction, political issues, state regulations, geological conditions, and the weather in the region. Hence, dealing with such problems is a general concern. In this study, in addition to past studies, delay in the construction projects in Iran are gathered and introduced. So, the first objective of this paper is to identify and classify delay causes in Iran and to introduce current procedures for control delays. As second objective, to manage delay-claims crisis, two practical frameworks were proposed for the classification and assessment of delays.
Get full access to this chapter
View all available purchase options and get full access to this chapter.
REFERENCES
Aiyetan, A., Smallwood, J. and Shakantu, W. (2011). “A systems thinking approach to eliminate delays on building construction projects in South Africa.” Acta Structilia, 18(2), 19–39.
Al-Humaidi, H.M. and Tan, F.H. (2011). “New approach to model material-related problems contributing to project delays using rotational fuzzy set.” Journal of Performance of Constructed Facilities, 26(3), 279–286.
Al-Momani, A.H. (2000). “Construction delay: a quantitative analysis.” International Journal of Project Management, 18(1), 51–59.
Asnaashari, E., Knight, A., Hurst, A. and Farahani, S.S. (2009). “Causes of construction delays in Iran: project management, logistics, technology and environment.” Proceedings from the 25th Annual ARCOM Conference, Nottingham, U.K., 7–9.
Behboudi, S. (2008). “A model to predict the impact of excusable and non-excusable delay on selected construction projects.” Proceedings from the AEI 2008 Building Integration Solutions, Denver, U.S., 1–10.
Chan, D.W. and Kumaraswamy, M.M. (2002). “Compressing construction durations: lessons learned from Hong Kong building projects.” International Journal of Project Management, 20(1), 23–35.
Ezeldin, A.S. and Abdel-Ghany, M. (2013). “Causes of construction delays for engineering projects: an Egyptian perspective.” Proceedings from the AEI 2013 Building Solutions for Architectural Engineering, Pennsylvania, U.S., 54–63.
Fallahnejad, M.H. (2013). “Delay causes in Iran gas pipeline projects.” International Journal of Project Management, 31(1), 136–146.
Frimpong, Y., Oluwoye, J. and Crawford, L. (2003). “Causes of delay and cost overruns in construction of groundwater projects in a developing countries: Ghana as a case study.” International Journal of Project Management, 21(5), 321–326.
Gunduz, M., Nielsen, Y. and Ozdemir, M. (2014). “Fuzzy assessment model to estimate the probability of delay in Turkish construction projects.” Journal of Management in Engineering, 31(4), 1–13.
Hegab, M.Y. and Smith, G.R. (2007). “Delay time analysis in microtunneling projects.” Journal of Construction Engineering and Management, 133(2), 191–195.
Ilyin, I.V. and Lyovina, A.I. (2013). “Project management issues of formation of engineering companies architecture.” Proceedings from the Practice and Perspectives Second International Scientific Conference on Project Management, Riga, Latvia, 11–12.
Khoshgoftar, M., Bakar, A.H.A. and Osman, O. (2010). “Causes of delays in Iranian construction projects.” International Journal of Construction Management, 10(2), 53–69.
Love, P.E., Irani, Z. and Edwards, D.J. (2004). “A rework reduction model for construction projects.” IEEE Transactions on Engineering Management, 51(4), 426–440.
Mezher, T.M. and Tawil, W. (1998). “Causes of delays in the construction industry in Lebanon.” Engineering Construction and Architectural Management, 5(3), 252–260.
Oliveros, A.V.O. and Fayek, A.R. (2005). “Fuzzy logic approach for activity delay analysis and schedule updating.” Journal of Construction Engineering and Management, 131(1), 42–51.
Shi, J.J., Cheung, S.O. and Arditi, D. (2001). “Construction delay computation method.” Journal of Construction Engineering and Management, 127(1), 60–65.
Sonuga, F., Aliboh, O. and Oloke, D. (2002). “Particular barriers and issues associated with projects in a developing and emerging economy: case study of some abandoned water and irrigation projects in Nigeria.” International Journal of Project Management, 20(8), 611–616.
Thomas, J. and Mengel, T. (2008). “Preparing project managers to deal with complexity-Advanced project management education.” International Journal of Project Management, 26(3), 304–315.
Venus, K. (2014). “Supply chain management-part of strategic management.” Journal of Business and Economics, 5(7), 1052–1067.
Information & Authors
Information
Published In
ICCREM 2016: BIM Application and Off-Site Construction
Pages: 932 - 939
Editors: Yaowu Wang, Ph.D., Professor, Harbin Institute of Technology, Mohamed Al-Hussein, Ph.D., Professor, University of Alberta, Geoffrey Q. P. Shen, Ph.D., Professor, The Hong Kong Polytechnic University, and Yimin Zhu, Ph.D., Professor, Louisiana State University
ISBN (Online): 978-0-7844-8027-4
Copyright
© 2017 American Society of Civil Engineers.
History
Published online: Aug 14, 2017
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.