International Conference on Construction and Real Estate Management 2016
Research on the System Dynamics Mechanism of Project Management
Publication: ICCREM 2016: BIM Application and Off-Site Construction
ABSTRACT
With the increasing complexity of construction projects, the project management is becoming more and more difficult. It is urgent to put forward a new idea conforming to engineering practice. This paper analyzes the problem of project management and the dynamic mechanism, then tries to introduce the thought of system dynamics into project management. By means of the quality control process, the paper compares and analyzes the project management methods based on system dynamics and the traditional project management methods. Eventually, the dynamic mechanism of project management based on system dynamics is presented.
Get full access to this chapter
View all available purchase options and get full access to this chapter.
ACKNOWLEDGMENTS
This thesis would not have been possible without the contributions off several people. To all of these people, I wish to express my gratitude. I would like to acknowledge and extend my heartfelt gratitude to my supervisor, for her vital encouragement and patient guidance, generous assistance and invaluable advice, all of which have been of inestimable worth to the completion of my thesis.
REFERENCES
Gao, H.B., Ma, Z.M., Gu, W.J. and Liu, X.Q. (2014). “Target control of engineering project based on system dynamics.” Journal of Logistical Engineering University, 30(4), 90–96. (in Chinese).
Jia, H.J. and Wang, G. (2013). “Study on WBS decomposition of large-scale complex engineering projects.” Construction Economy, (10), 32–34. (in Chinese).
Jia, R.A. and Ding, R.H. (2002). System dynamics feedback dynamic complexity analysis, Higher Education Publishing House, Shanghai. (in Chinese).
Lei, R.J. and Bi, X. (2004). “Application of system dynamics in construction project management.” Journal of Harbin University of Science and Technology, 9(6), 72–75. (in Chinese).
Lu, N., Feng, Y.P., Wang, F., Zhou, X. and Wang, W. (2009). “Quality earned value method of integrated management.” Journal of Liaoning Technical University (Natural Science), 28(1), 113–115. (in Chinese).
Wang, Q.F. (1998). System dynamics, Tsinghua University Press, Beijing. (in Chinese).
Wang, Y.J. (2010). “A project management method based on system dynamics.” Statistics and Decision, (12), 34–36. (in Chinese).
Yuan, Z.M. and Wang, Y.W. (2015). “Construction project construction schedule and cost based on BIM and network planning technology.” Journal of Engineering Management, 29(4), 95–100. (in Chinese).
Zheng, X.Z., Fang, Z.F. and Lv, H.M. (2003). “Algorithm research of engineering network planning technology based on fuzzy model.” Science of Science and Management of S. & T., (8), 35–38. (in Chinese).
Information & Authors
Information
Published In
ICCREM 2016: BIM Application and Off-Site Construction
Pages: 502 - 507
Editors: Yaowu Wang, Ph.D., Professor, Harbin Institute of Technology, Mohamed Al-Hussein, Ph.D., Professor, University of Alberta, Geoffrey Q. P. Shen, Ph.D., Professor, The Hong Kong Polytechnic University, and Yimin Zhu, Ph.D., Professor, Louisiana State University
ISBN (Online): 978-0-7844-8027-4
Copyright
© 2017 American Society of Civil Engineers.
History
Published online: Aug 14, 2017
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.