Unique Design, Manufacturing, and Installation Challenges for the CW System at the Ninemile Unit 6 CCGT Project

Publication: Pipelines 2014: From Underground to the Forefront of Innovation and Sustainability

Abstract

Ninemile Point plant was built in the 1950s to accommodate the growing energy demands for a booming New Orleans population. The 550-MW Ninemile Unit 6 CCGT project was proposed to replace the aging units 1 and 2 and provide New Orleans with very clean and efficient electricity generation. To reduce overall project costs, existing infrastructure was utilized wherever possible, including the circulating water system. The project would require some new circulating water lines installed near the building and tie-ins to existing concrete intake and discharge piping. Due to space limitations, certain utilities' corridors could not be relocated to accommodate the new circulating water lines. As a result, it was decided to transition to abovegrade steel pipe to transverse these utility corridors. The new circulating water system was required to be designed for seismic conditions and wind loadings due to hurricanes. In addition, manufacturing and installation schedules were limited as a result of hurricane season. Due to the station's proximity to the Mississippi River, groundwater conditions also had to be considered during design, manufacture, and installation phases of the project. Prestressed concrete cylinder pipe (PCCP) was chosen for below-grade piping (more than 1,500 ft of 72 in.) and steel pipe was utilized (more than 450 ft of 72 in) for abovegrade piping. Materials were delivered on schedule, and the pipe was able to be installed as required to the satisfaction of the design engineer and owner. Consequently, unit 6 will be able to begin operations in mid-2015 and provide long-term and reliable power to the New Orleans area.

Get full access to this article

View all available purchase options and get full access to this chapter.

Information & Authors

Information

Published In

Go to Pipelines 2014
Pipelines 2014: From Underground to the Forefront of Innovation and Sustainability
Pages: 437 - 444

History

Published online: Aug 4, 2014

Permissions

Request permissions for this article.

Authors

Affiliations

Richard Nichols [email protected]
Hanson Pressure Pipe, 1003 N. MacArthur Blvd., Grand Prairie, TX 75050. E-mail: [email protected]
Sam Arnaout [email protected]
P.E.
Hanson Pressure Pipe, 1003 N. MacArthur Blvd., Grand Prairie, TX 75050. E-mail: [email protected]
P.E.
Hanson Pressure Pipe, 1003 N. MacArthur Blvd., Grand Prairie, TX 75050. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share