The Key Construction Technologies of Embedded and Large Span Tunnel in Soft Flow Mucky Ground
Publication: Earth & Space 2008: Engineering, Science, Construction, and Operations in Challenging Environments
Abstract
There is a 333.586 m length tunnel for parking and cross-over track at the north Gulou station between Gulou station and Xuanwumen station, which the largest span is 17.358 m. The spacing interval is small, and the smallest is 0. The tunnel has many chambers, and the section area is varied. A 320.6 m length tunnel goes through the soft muddy and silty ground at the south Xuanwumen station. The tunnel crown is located 8 m to 9 m below the ground surface, where there are structures on the ground, pipeline and built-constructions under the tunnel. All the constructions therefore must be secure and steady in the process of excavating. The paper analyzes both the construction difficulty and features of large span and parking cross-over track tunnel in the soft flow mucky ground. The construction method of bench cut method, center diagram method (CD method) and both side drift method are adopted on the base of the theory. Finally the paper introduces the construction scheme and support method in the soft flow mucky ground. From the effect of construction, it is concluded that the construction method and the reinforcement method are right. In a word, the constructions are secure and steady in the whole process of construction.
Get full access to this chapter
View all available purchase options and get full access to this chapter.
Information & Authors
Information
Published In
Copyright
© 2008 American Society of Civil Engineers.
History
Published online: Apr 26, 2012
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.