Chapter
Apr 26, 2012

Collaborative Strategy for Dredging and Environmental Restoration Projects: Annapolis, Maryland

Publication: Ports 2007: 30 Years of Sharing Ideas: 1977-2007

Abstract

When Annapolis was chosen as a stop for the 2005–2006 Volvo Ocean Race (VOR), the premier round the world sailing yacht competition. City planners were tasked with preparing the City Harbor and Channel for the fleet's arrival in May 2006. Unlike previous VORs this planning would include dredging to support a new class of racing yacht 70-feet long, designed to draw 14.8 feet of water. This need sparked City officials who had for some time been contemplating increasing harbor depth to allow entrance of deeper draft vessels. Planners realized the cost associated with such work could be prohibitive to Annapolis' budget goals. To solve this potential dilemma, the City hired the design firm KCI Technologies, Inc. KCI and the City teamed to pursue a collaborative strategy to complete the work in parallel with environmental restoration efforts in the region. Initial concepts for the dredging and associated material placement were generated and advanced by KCI. At the same time, all necessary background information was compiled for the dredging including a material characteristics assessment, updates to hydrographic surveys, and consultation with VOR yacht design firms to assess controlling parameters. During the preliminary designs, Greenbury Point, owned by the U.S. Naval Academy was identified as a possible location for beneficial use of the dredged material. The Greenbury Point peninsula, located at the mouth of the Severn River, was identified because of its close proximity to Annapolis Harbor and the need for environmental restoration at the site, including stabilization of a potentially failing berm, existing fresh water ponds, and wetlands associated with an historic Dredge Material Placement (DMP) site. Greenbury point also contained opportunities for wetlands creation through dredge material placement utilization and reforestation. The team also recognized that the project could potentially serve as a model for local DMP. Local officials noted that the space availability for DMP sites, especially on the larger scale of regional DMP sites, is continuously being reduced through land development while capacity requirements remain at least stable. Based upon the preliminary designs, the City of Annapolis requested Congressional funding for the project through the Aquatic Ecosystem Restoration portion of the Water Resources Development Act (WRDA), also known as a Section 206 project. With the background data provided by the team, initial Congressional funding was allocated to the project with the U.S. Army Corps of Engineers (USACE) tasked with completing the work. After choosing several potential scenarios for advancing the project, KCI, Annapolis, and USACE assembled potential shareholders including the Maryland Port Administration (MPA), U.S. Naval Academy, U.S. Fish and Wildlife Service (USFWS), Maryland Environmental Service (MES), and Anne Arundel County Soil Conservation Service to ascertain the potential benefits to the region from the project. By providing positive leadership and direction to the project, team leaders were able to forge a consensus among all partners through a mutually beneficial Collaborative Strategy approach. This Collaborative Strategy sought simply to provide a "win" for all involved team members. With a Collaborative Strategy in place, and with a strong interest in providing environmentally beneficial uses of dredged material, MPA agreed to earmark an existing DMP site for disposal of the Annapolis Harbor dredge material in exchange for participation in the Greenbury Point restoration portion of the project. In addition a time-optimized design for the dredging and material placement was produced which allowed the dredging of Annapolis Harbor to be completed in early 2006. During the same period KCI continued Section 206 project development based upon inputs of team members, drafting a Scope of Work and cost estimates for the entire project. This information was used to secure further funding from Congress from which design of the Section 206 portion of the project is currently advancing.

Get full access to this article

View all available purchase options and get full access to this chapter.

Information & Authors

Information

Published In

Go to Ports 2007
Ports 2007: 30 Years of Sharing Ideas: 1977-2007
Pages: 1 - 10

History

Published online: Apr 26, 2012

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Robert D. Agee [email protected]
City Administrator, City of Annapolis, City Hall, Rm. 105, 160 Duke of Gloucester Street, Annapolis, MD 21401. E-mail: [email protected]
Christopher L. Overcash [email protected]
P.E.
Senior Project Engineer, KCI Technologies, Inc., 10 North Park Drive, Hunt Valley, MD 21030. E-mail: [email protected]
Thomas G. Sprehe [email protected]
P.E., DEE
Senior Vice President, KCI Technologies, Inc., 10 North Park Drive, Hunt Valley, MD 21030. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Paper
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share