Abstract

In this paper the authors propose a global–local methodology for optimizing the short-term operation of hydroelectric plants. The authors determine the tradeoffs between minimizing the daily release from the plant and minimizing the number of startups and shutdowns of the generating units. The model is formulated as a mixed integer, nonlinear programming optimization problem with multiple objectives. The authors consider the nonlinearities of the generating units without simplifications or approximations. The authors develop a solution method that combines an evolutionary algorithm for the global search of the integer variables and a gradient-based local optimizer for the continuous variables. The local optimizer is embedded in the global search algorithm. Convergence is achieved by iterating between the global search and the local optimizer. The proposed methodology is applied to a moderately sized Brazilian hydroelectric plant that belongs to the national interconnected system. Additionally, a comparative study was conducted using historical operational records. The results demonstrate that the proposed methodology is feasible for online daily operations and delivers two specific benefits. The first is the efficiency gained, as the model seeks to operate the generating units as close as possible to their most efficient operating points. The second benefit is reduction of the units’ maintenance costs, as the model minimizes switching on/off of the generating units.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

The research reported herein was supported by CNPq, a Brazilian government agency dedicated to the development of science and technology (Process: 200759/2012-4) and by CESP, one of Brazil’s largest power generators (Process: 01-P-26974/2011). We would like to thank three anonymous reviewers for their in-depth reviews and constructive comments.

References

Arce, A. S., Ohishi, T., and Soares, S. (2002). “Optimal dispatch of generating units of the Itaipu hydroelectric plant.” IEEE Trans. Power Syst., 17(1), 154–158.
Bakken, B. H., and Bjorkvoll, T. (2002). “Hydropower unit start-up costs.” Power Eng. Soc. IEEE, 3, 1522–1527.
Bleuler, S., Laumanns, M., Thiele, L., and Zitler, E. (2003). “PISA—A platform and programming language independent interface for search algorithms.” Evolutionary multi-criterion optimization—Lecture notes in computer science, Springer Link, Vol. 2632, Springer, Berlin, 494–508.
Borghetti, A., Ambrosio, C., Lodi, A., and Martello, S. (2008). “An MILP approach for short-term hydro scheduling and unit commitment with head-dependent reservoir.” IEEE Trans. Power Syst., 23(3), 1115–1124.
Catalão, J. P. S., Mariano, S. J. P. S., Mendes, V. M. F., and Ferreira, L. A. F. M. (2006). “Parameterisation effect on the behaviour of a head-dependent hydro chain using a nonlinear model.” Electr. Power Syst. Res., 76(6–7), 404–412.
Chancelier, J.-P., and Renaud, A. (1994). “Daily generation scheduling: decomposition methods to solve the hydraulic problems.” Int. J. Electr. Power Energy Syst., 16(3), 175–181.
Chang, G. W., et al. (2001). “Experiences with mixed integer linear programming based approaches on short-term hydro scheduling.” IEEE Trans. Power Syst., 16(4), 743–749.
Cheng, C., Shen, J., and Wu, X. (2012). “Short-term scheduling for large-scale cascade hydropower systems with multivibration zones of high head.” J. Water Resour. Plann. Manage., 257–267.
Colnago, G. R. (2007). “Optimal dispatch model with individual treatment of generating units in hydroelectric plants.” M.S. thesis, State Univ. of Campinas, São Paulo, Brazil.
Colnago, G. R. (2011). “Contribution for turbines optimization in hydroelectric plants: specification and operation.” Ph.D. thesis, State Univ. of Campinas, São Paulo, Brazil.
Conejo, A. J., Arroyo, J. M., Contreras, J., and Villamor, F. A. (2002). “Self-scheduling of a hydro producer in a pool-based electricity market.” IEEE Trans. Power Syst., 17(4), 1265–1272.
Fernandes, F. P. T. (2011). “Dispatch of hydroelectric plant—Implementation using genetic algorithms.” M.S. thesis, State Univ. of Campinas, São Paulo, Brazil.
Finardi, E. C., and Scuzziato, M. R. (2013). “Hydro unit commitment and loading problem for day-ahead operation planning problem.” Int. J. Electr. Power Energy Syst., 44(1), 7–16.
Finardi, E. C., and Silva, E. L. (2005). “Unit commitment of single hydroelectric plant.” Electr. Power Syst. Res., 75(2–3), 116–123.
García-González, J., Parrilla, E., and Mateo, A. (2007). “Risk-averse profit-based optimal scheduling of a hydro-chain in the day-ahead electricity market.” Eur. J. Oper. Res., 181(3), 1354–1369.
Hidalgo, I. G., Fontane, D. G., Arabi, M., Lopes, J. E. G., Andrade, J. G. P., and Ribeiro, L. C. L. J. (2012). “Evaluation of optimization algorithms to adjust efficiency curves for hydroelectric generating units.” J. Energy Eng., 172–178.
Hidalgo, I. G., Fontane, D. G., Lopes, J. E. G., Andrade, J. G. P., and Angelis, A. F. (2013). “Efficiency curves for hydroelectric generating units.” J. Water Resour. Plann. Manage., 86–91.
Holland, J. H. (1975). “Adaptation in natural and artificial systems.” Univ. of Michigan Press, Ann Arbor, MI.
Huang, S.-J. (2001). “Enhancement of hydroelectric generation scheduling using ant colony system based optimization approaches.” IEEE Trans. Power Syst., 16(3), 296–301.
Lingo. (2013). “User’s guide.” 〈http://www.lindo.com〉 (Apr. 4, 2013).
Muller, G. (2010). “Dispatch of generating units and generation of individual hydroelectric using genetic algorithm.” M.S. thesis, Federal Univ. of Rio de Janeiro, Brazil.
Naresh, R., and Sharma, J. (2000). “Hydro system scheduling using ANN approach.” IEEE Trans. Power Syst., 15(1), 388–395.
Nicklow, J., et al. (2010). “State of the art for genetic algorithms and beyond in water resources planning and management.” J. Water Resour. Plann. Manage., 412–432.
Nilsson, O., and Sjelvgren, D. (1997). “Hydro unit start-up costs and their impact on the short term scheduling strategies of Swedish power producers.” IEEE Trans. Power Syst., 12(1), 38–43.
Nilsson, O., Soder, L., and Sjelvgren, D. (1998). “Integer modeling of spinning reserve requirements in short term scheduling of hydro systems.” IEEE Trans. Power Syst., 13(3), 959–964.
Padhy, N. P. (2004). “Unit commitment—A bibliographic survey.” IEEE Trans. Power Syst., 19(2), 1196–1205.
Pérez-Díaz, J. I., Wilhelmi, J. R., and Sánchez-Fernández, J. A. (2010). “Short-term operation scheduling of a hydropower plant in the day-ahead electricity market.” Electr. Power Syst. Res., 80(12), 1535–1542.
PISA. (2013). “Platform and programming language independent interface for search algorithm.” 〈http://www.tik.ee.ethz.ch/pisa/?page=principles.php〉 (Apr. 4, 2013).
Santos, E. F., and Ohishi, T. (2004). “A hydro unit commitment model using genetic algorithm.” Congr. Evol. Comput., 2, 1368–1374.
Siegfried, T., Bleuler, S., Laumanns, M., Zitzler, E., and Kinzelbach, W. (2009). “Multiobjective groundwater management using evolutionary algorithms.” IEEE Trans. Evol. Comput., 13(2), 229–242.
Siegfried, T. U. (2004). “Optimal utilization of a nonrenewable transboundary groundwater resource—Methodology, case study and policy implications.” Ph.D. thesis, Swiss Federal Institute of technology, Zurich, Switzerland.
Siu, T. K., Nash, G. A., and Shawwash, Z. K. (2001). “A practical hydro, dynamic unit commitment and loading model.” IEEE Trans. Power Syst., 16(2), 301–306.
Villasanti, C. M., Lucken, C. V., and Baran, B. (2004). “Dispatch of hydroelectric generating units using multiobjective evolutionary algorithms.” IEEE/PES Transmission and Distribution Conf. and Exposition, Latin America, IEEE Power & Energy Society, 929–934.
Yi, J., Labdie, J. W., and Steven, S. (2003). “Dynamic optimal unit commitment and loading in hydropower systems.” J. Water Resour. Plann. Manage., 388–398.
Zitzler, E., Laumanns, M., and Thiele, L. (2001). “SPEA2: Improving the strength pareto evolutionary algorithm.”, Dept. of Electrical Engineering, Swiss Federal Institute of Technology, Zurich, Switzerland.

Information & Authors

Information

Published In

Go to Journal of Water Resources Planning and Management
Journal of Water Resources Planning and Management
Volume 141Issue 3March 2015

History

Received: Jul 15, 2013
Accepted: Feb 11, 2014
Published online: Feb 13, 2014
Discussion open until: Dec 18, 2014
Published in print: Mar 1, 2015

Permissions

Request permissions for this article.

Authors

Affiliations

Ieda G. Hidalgo [email protected]
Professor, Faculty of Technology, State Univ. of Campinas (Unicamp), CP 6122, Brazil (corresponding author). E-mail: [email protected]
Paulo B. Correia [email protected]
Professor, Faculty of Mechanical Engineering, State Univ. of Campinas (Unicamp), CP 6122, Brazil. E-mail: [email protected]
Francisco J. Arnold [email protected]
Professor, Faculty of Technology, State Univ. of Campinas (Unicamp), CEP 13484-332, Brazil. E-mail: [email protected]
João Paulo F. Estrócio [email protected]
Project Manager, Physicist and Technical Assistant, Cia Energética de São Paulo (CESP), CEP 04447-011, Brazil. E-mail: [email protected]
Regiane S. de Barros [email protected]
Ph.D. Student, Faculty of Mechanical Engineering, State Univ. of Campinas (Unicamp), CP 6122, Brazil. E-mail: [email protected]
Jéssica P. T. Fernandes [email protected]
Ph.D. Student, Faculty of Mechanical Engineering, State Univ. of Campinas (Unicamp), CP 6122, Brazil. E-mail: [email protected]
William W.-G. Yeh, Dist.M.ASCE [email protected]
Distinguished Professor, Civil and Environmental Engineering, Univ. of California–Los Angeles (UCLA), Los Angeles, CA 90095. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share