Abstract

This paper explores a quantitative model with different maintenance strategies to control railway track geometry degradation in Portugal. The alert limits put forward by the international standards are assessed regarding the planned and unplanned impacts associated with those limits, namely preventive maintenance and renewal costs, corrective maintenance costs, planned infrastructure delays due to changes in the maximum permissible speed, and unplanned infrastructure delays due to temporary speed restrictions. The effects of different choices for the alert limits of the main quality indicators for railway track geometry are assessed, considering a cost penalty due to delays set by the regulatory entity. Finally, a sensitivity analysis is conducted on the effect of this delay cost penalty on the optimized choice of the alert limits for both quality indicators.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

The authors would like to thank the support and collaboration of the Portuguese Railway Infrastructure Manager, REFER, and the financial support of the Portuguese Foundation for Science and Technology (FCT) through the project MODURAIL (PTDC/SEN-TRA/112975/2009) and MIT Portugal program through the Ph.D. grant (SFRH/BD/33785/2009). They also thank the suggestions from three reviewers, which definitely improved this work.

References

Andrade, A. R., and Teixeira, P. F. (2011). “Biobjective optimization model for maintenance and renewal decisions related to rail track geometry.” Transp. Res. Rec., 2261, 163–170.
Andrade, A. R., and Teixeira, P. F. (2013). “Hierarchical Bayesian modeling of rail track geometry degradation.” Proc. Inst. Mech. Eng., 227(4), 364–375.
Andrade, A. R., and Teixeira, P. F. (2014). “Unplanned maintenance needs related to rail track geometry degradation.” Proc. Inst. Civ. Eng., 167(6), 400–410.
Andrade, A. R., and Teixeira, P. F. (2015). “Statistical modelling of railway track geometry degradation using hierarchical Bayesian models.” Reliab. Eng. Syst. Saf., 142, 169–183.
Andrade, A. R., and Teixeira, P. F. (2016). “A negative binomial regression model to predict temporary speed restrictions in railway infrastructure.” in press.
Budai, G., Dekker, R., and Kaymak, U. (2009). “Genetic and memetic algorithms for scheduling railway maintenance activities.”, Econometric Institute, Rotterdam, Netherlands.
Budai, G., Huisman, D., and Dekker, R. (2006). “Scheduling preventive maintenance activities.” J. Oper. Res. Soc., 57(9), 1035–1044.
Caetano, L. F., and Teixeira, P. F. (2013). “Availability approach to optimizing railway track renewal operations.” J. Transp. Eng., 941–948.
Caetano, L. F., and Teixeira, P. F. (2015). “Optimisation model to schedule railway track renewal operations: A life-cycle cost approach.” Struct. Infrastruct. Eng., 11(11), 1524–1536.
CEN (European Committee for Standardization) (2006). “Railway applications—Track—Acceptance of works. Part 1: Works on ballasted track—Plain line, switches and crossings.” EN 13231-1, Brussels, Belgium.
CEN (European Committee for Standardization). (2008a). “Railway applications—Track—Track geometry quality. Parts 1, 2, 3, 4, 5 and 6.” EN 13848, Brussels, Belgium.
CEN (European Committee for Standardization). (2008b). “Railway applications—Track—Track geometry quality—Part 5: Geometric quality levels.” EN 13848-5, Brussels, Belgium.
Famurewa, S. M., Xin, T., Rantatalo, M., and Kumar, U. (2015). “Optimisation of maintenance track possession time: A tamping case study.” J. Rail Rapid Transit, 229(1), 12–22.
Guler, H. (2012). “Decision support system for railway track maintenance and renewal management.” J. Comput. Civ. Eng., 292–306.
Guler, H. (2014). “Prediction of railway track geometry deterioration using artificial neural networks: A case study for Turkish state railways.” Struct. Infrastruct. Eng., 10(5), 614–626.
Higgins, A., Ferreira, L., and Lake, M. (1999). “Scheduling rail track maintenance to minimize overall delays.” Proc., 14th Int. Symp. on Transportation and Traffic Theory, Pergamon, New York.
Lai, Y. C., and Barkan, C. P. L. (2011). “Comprehensive decision support framework for strategic railway capacity planning.” J. Transp. Eng., 738–749.
Lidén, T. (2015). “Railway infrastructure maintenance—A survey of planning problems and conducted research.” Transp. Res. Procedia, 10, 574–583.
Peng, F., Kang, S., Xiaopeng, L., Ouyang, Y., Somani, K., and Acharya, D. (2011). “A heuristic approach to the railroad track maintenance scheduling problem.” Comput. Aided Civ. Infrastruct. Eng., 26(2), 129–145.
Puterman, M. L. (2005). Markov decision processes: Discrete stochastic dynamic programming, Wiley, Hoboken, NJ.
REFER. (2009). “IT.VIA.018—Instrução Técnica de Via: Tolerâncias dos parâmetros geométricos.” Versão 2 (in Portuguese).
Santos, R., and Teixeira, P. F. (2012). “Heuristic analysis of the effective range of a track tamping machine.” J. Infrastruct. Syst., 314–322.
Santos, R., Teixeira, P. F., and Antunes, A. P. (2015). “Planning and scheduling efficient heavy rail track maintenance through a decision rules model.” Res. Transp. Econ., 54, 20–32.
Simson, S., Ferreira, L., and Murray, M. H. (2000). “Rail track maintenance planning: An assessment model.” Transp. Res. Rec., 1713, in press.
Soleimanmeigouni, I., and Ahmadi, A. (2016). “A survey on track geometry degradation modelling.” Current trends in reliability, availability, maintainability and safety, Springer, Switzerland, 3–12.
UIC (International Union of Railways). (2008). “Best practice guide for optimum track geometry durability.” Editions Techniques Ferroviaires, Paris (in French).
URF (Railway Regulator Unit). (2013). “Projecto de Instrução n° 1/URF/2013.” (in Portuguese).
Vale, C., Ribeiro, I. M., and Calçada, R. (2012). “Integer programming to optimize tamping in railway tracks as preventive maintenance.” J. Transp. Eng., 123–131.
Xin, T., Famurewa, S. M., Gao, L., Kumar, U., and Zhang, Q. (2015). “Grey-system-theory-based model for the prediction of track geometry quality.” J. Rail Rapid Transit, in press.
Zhao, J., Chan, A. H. C., Roberts, C., and Stirling, A. B. (2006). “Optimizing policies of railway ballast tamping and renewal.” Transp. Res. Rec., 1943, 50–56.

Information & Authors

Information

Published In

Go to Journal of Transportation Engineering
Journal of Transportation Engineering
Volume 142Issue 9September 2016

History

Received: Jul 8, 2014
Accepted: Feb 29, 2016
Published online: Apr 29, 2016
Published in print: Sep 1, 2016
Discussion open until: Sep 29, 2016

Permissions

Request permissions for this article.

Authors

Affiliations

António Ramos Andrade, Ph.D. [email protected]
Invited Assistant Professor, Instituto Universitário de Lisboa (ISCTE-IUL), Business Research Unit (BRU-IUL), Ave. das Forças Armadas, 1649-026 Lisbon, Portugal (corresponding author). E-mail: [email protected]
Paulo Fonseca Teixeira, Ph.D.
Assistant Professor, Dipl-Eng, CERis, CESUR, Instituto Superior Técnico (IST), Univ. of Lisbon, Ave. Rovisco Pais, 1049-001 Lisbon, Portugal.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share