Investigating the Agile Hybrid Approach in Construction

Publication: Journal of Management in Engineering
Volume 38, Issue 4

Abstract

Rapidly developing technologies, fast evolving business needs, and increasing competition have forced construction companies to respond to changing conditions much faster in their projects. Agile project management, which was originally developed by software engineers, takes advantage of collaborative, integrated, and productive teams composed of project participants guided by principles of trust, transparent processes, and open information sharing. It is a project management approach based on delivering project requirements incrementally through short iterations by a small, self-organized, and cross-functional team. This study aims to investigate the implementation of the agile hybrid approach in construction. In this context, a conceptual model composed of 6 constructs (drivers, barriers, enablers, inputs, process improvements, and project benefits) and 42 corresponding indicators was proposed. A questionnaire survey was designed and administered to construction professionals. The validity of the interrelations among the constructs was tested using structural equation modeling (SEM). The findings revealed a need for project performance improvement as the main driver; a lack of awareness of agile methods and practices as the major barrier; commitment and organizational learning via short feedback loops as the main enabler; an autonomous, self-organized, and multidisciplinary team as the most critical input; better response to changes as the major improvement; and enhanced project performance as the key project benefit. This research proposes an interactive agile integration framework for the construction industry that can be used to reveal primary differences in implementation across countries through the collection and analysis of data from another country. Construction companies can benefit from the recommended strategies to determine their short- and long-term strategies and incorporate agility into their project management practices.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Some or all data, models, or code that support the findings of this study are available from the corresponding author upon reasonable request.

References

Adut, J. 2016. “Applying agile approaches in public construction and civil engineering projects: A study to identify opportunities for a more flexible project management process.” Accessed August 14, 2021. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-199206.
Ahmad, S., N. N. A. Zulkurnain, and F. I. Khairushalimi. 2016. “Assessing the validity and reliability of a measurement model in structural equation modeling (SEM).” Br. J. Math. Comput. Sci. 15 (3): 1–8. https://doi.org/10.9734/BJMCS/2016/25183.
Ahmed, M. N., and S. R. Mohammed. 2019. “Developing a risk management framework in construction project based on agile management approach.” Civ. Eng. J. 5 (3): 608–615. https://doi.org/10.28991/cej-2019-03091272.
Al Heet, M. R. A. H., T. C. L. Alves, and N. Lakrori. 2020. “Investigation of the use of lean construction practices in transportation construction projects.” In Proc., 28th Annual Conf. of the Int. Group for Lean Construction. Auckland, New Zealand: International Group for Lean Construction.
Aronson, Z. H., R. R. Reilly, and G. S. Lynn. 2006. “The impact of leader personality on new product development teamwork and performance: The moderating role of uncertainty.” J. Eng. Technol. Manage. 23 (3): 221–247. https://doi.org/10.1016/j.jengtecman.2006.06.003.
Assaf, S. A., and S. Al-Hejji. 2006. “Causes of delay in large construction projects.” Int. J. Project Manage. 24 (4): 349–357. https://doi.org/10.1016/j.ijproman.2005.11.010.
Azanha, A., A. R. T. T. Argoud, J. B. D. Camargo Junior, and P. D. Antoniolli. 2017. “Agile project management with scrum: A case study of a Brazilian pharmaceutical company it project.” Int. J. Managing Projects Bus. 10 (1): 121–142. https://doi.org/10.1108/IJMPB-06-2016-0054.
Bianchi, M., G. Marzi, and M. Guerini. 2020. “Agile, Stage-Gate and their combination: Exploring how they relate to performance in software development.” J. Bus. Res. 110 (Mar): 538–553. https://doi.org/10.1016/j.jbusres.2018.05.003.
Bollen, K. A. 1989. Structural equations with latent variables. New York: Wiley.
Bourne, L., and D. H. T. Walker. 2005. “Visualising and mapping stakeholder influence.” Manage. Decis. 43 (5): 649–660. https://doi.org/10.1108/00251740510597680.
Bowes, J. 2014. “Agile vs waterfall: Comparing project management methods.” Accessed August 14, 2021. https://manifesto.co.uk/agile-vs-waterfall-comparing-project-management-methodologies/.
Boyd, D., and E. Chinyio. 2008. Understanding the construction client. Hoboken, NJ: Wiley.
Brady, D. A., P. Tzortzopoulos, J. Rooke, C. T. Formoso, and A. Tezel. 2018. “Improving transparency in construction management: A visual planning and control model.” Eng. Constr. Archit. Manage. 25 (10): 1277–1297. https://doi.org/10.1108/ECAM-07-2017-0122.
Brandl, F. J., N. Roider, M. Hehl, and G. Reinhart. 2021. “Selecting practices in complex technical planning projects: A pathway for tailoring agile project management into the manufacturing industry.” CIRP J. Manuf. Sci. Technol. 33 (May): 293–305. https://doi.org/10.1016/j.cirpj.2021.03.017.
Buckley, P. J., C. L. Pass, and K. Prescott. 1988. “Measures of international competitiveness: A critical survey.” J. Marketing Manage. 4 (2): 175–200. https://doi.org/10.1080/0267257X.1988.9964068.
Budayan, C. 2019. “Evaluation of delay causes for BOT projects based on perceptions of different stakeholders in Turkey.” J. Manage. Eng. 35 (1): 04018057. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000668.
Castellion, G., and S. K. Markham. 2013. “Perspective: New product failure rates: Influence of argumentum ad populum and self-interest.” J. Prod. Innovation Manage. 30 (5): 976–979. https://doi.org/10.1111/j.1540-5885.2012.01009.x.
Cervone, H. F. 2011. “Understanding agile project management methods using Scrum.” OCLC Syst. Serv. Int. Digital Lib. Perspect. 27 (1): 18–22. https://doi.org/10.1108/10650751111106528.
Chin, G. 2004. Agile project management: How to succeed in the face of changing project requirements. New York: American Management Association.
Cole, T. R. H. 2003. Final report of the royal commission into the building and construction industry. Canberra, Australia: Commonwealth of Australia.
Coleman, N. 2019. “Project critical success factors: A study of linear transportation projects.” Accessed October 24, 2021. https://www.proquest.com/docview/2193304119?pq-origsite=gscholar&fromopenview=true.
Conforto, E. C., F. Salum, D. C. Amaral, S. L. Da Silva, and L. F. M. De Almeida. 2014. “Can agile project management be adopted by industries other than software development?” Project Manage. J. 45 (3): 21–34. https://doi.org/10.1002/pmj.21410.
Cooper, R. G., and A. F. Sommer. 2016. “The agile–stage-gate hybrid model: A promising new approach and a new research opportunity.” J. Prod. Innovation Manage. 33 (5): 513–526. https://doi.org/10.1111/jpim.12314.
Daneshgari, P. 2010. Agile construction for the electrical contractor. Burlington, MA: Jones and Bartlett Publishers.
De Jong, M., N. Marston, and E. Roth. 2015. The eight essentials of innovation. Seattle: McKinsey Quarterly.
Demir, S. D., D. J. Bryde, and B. Sertyesilisik. 2014. “Introducing agilean to construction project management.” J. Mod. Project Manage. 1 (3): 28–39.
Demirkesen, S., and B. Ozorhon. 2017. “Impact of integration management on construction project management performance.” Int. J. Project Manage. 35 (8): 1639–1654. https://doi.org/10.1016/j.ijproman.2017.09.008.
Dunn, S. C., R. F. Seaker, and M. A. Waller. 1994. “Latent variables in business logistics research: Scale development and validation.” J. Bus. Logist. 15 (2): 145–172.
Dvir, D., and T. Lechler. 2004. “Plans are nothing, changing plans is everything: The impact of changes on project success.” Res. Policy 33 (1): 1–15. https://doi.org/10.1016/j.respol.2003.04.001.
Egan, J. 1998. Rethinking construction: The report of the construction task force. London: Dept. of the Environment, Transports and the Regions.
Ekström, A., and E. Pettersson. 2016. “Agile project management in the design stage–construction projects possibilities to apply agile methods.” Accessed August 14, 2021. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-199206.
ENR (Engineering News-Record). 2021. ENR’s 2021 top 250 international contractors. New York: ENR.
Esangbedo, O., and D. E. Ealefoh. 2021. “Prospects for the adoption of agile project management techniques in Nigerian construction industry.” Niger. J. Technol. 40 (3): 357–362. https://doi.org/10.4314/njt.v40i3.1.
Ezcan, V., J. Goulding, F. P. Rahimian, and M. Kuruoglu. 2015. “Avoiding stiffness: Perspectives of agile technology diffusion.” In Proc., Int. Conf. on Innovative Production and Construction. Perth, Australia: IPC2015 Organizing Committee.
Fornell, C., and D. F. Larcker. 1981. “Evaluating structural equation models with unobservable variables and measurement error.” J. Marketing Res. 18 (1): 39–50. https://doi.org/10.1177/002224378101800104.
Germanjuk, N. 2018. “Investments in the development of innovative management in the company.” Balt. J. Econ. Stud. 4 (4): 87–92. https://doi.org/10.30525/2256-0742/2018-4-4-87-92.
Gidado, K. I. 1996. “Project complexity: The focal point of construction production planning.” Construct. Manage. Econ. 14 (3): 213–225. https://doi.org/10.1080/014461996373476.
Grabher, G. 2004. “Temporary architectures of learning: Knowledge governance in project ecologies.” Organ. Stud. 25 (9): 1491–1514. https://doi.org/10.1177/0170840604047996.
Graham, P., N. Nikolova, and S. Sankaran. 2020. “Tension between leadership archetypes: Systematic review to inform construction research and practice.” J. Manage. Eng. 36 (1): 03119002. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000722.
Gustavsson, T. 2016. “Benefits of agile project management in a non-software development context-A literature review.” In Proc., 5th Int. Scientific Conf. on Project Management in the Baltic Countries. Riga, Latvia: Latvijas Universitate.
Hallinger, P. 2013. “A conceptual framework for systematic reviews of research in educational leadership and management.” J. Educ. Administration 51 (2): 126–149. https://doi.org/10.1108/09578231311304670.
Hamel, G., and N. Tennant. 2015. The 5 requirements of a truly innovative company. Brighton, England: Harvard Business Review.
Han, F. 2013. “Defining and evaluating agile construction management for reducing time delays in construction.” Accessed August 14, 2021. https://digitalrepository.unm.edu/ce_etds/74.
Highsmith, J., and A. Cockburn. 2001. “Agile software development: The business of innovation.” Computer 34 (9): 120–127. https://doi.org/10.1109/2.947100.
Highsmith, J. R. 2009. Agile project management: Creating innovative products. New York: Pearson Education.
Hu, Z. G., Q. Yuan, and X. Zhang. 2009. “Research on agile project management with scrum method.” In Proc., IITA Int. Conf. on Services Science, Management and Engineering. New York: IEEE.
Huang, Y., Q. Shi, F. Pena-Mora, Y. Lu, and C. Shen. 2020. “Exploring the impact of information and communication technology on team social capital and construction project performance.” J. Manage. Eng. 36 (5): 04020056. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000804.
Hunt, J. 2006. Agile software construction. London: Springer.
Iansiti, M. 1995. “Shooting the rapids: Managing product development in turbulent environments.” Calif. Manage. Rev. 38 (1): 37–58. https://doi.org/10.2307/41165820.
Jakimowicz, A., and D. Rzeczkowski. 2020. “Innovativeness of industrial processing enterprises and conjunctural movement.” Entropy (Basel) 22 (10): 1177. https://doi.org/10.3390/e22101177.
John, B. 2018. “Framework of agile management’s sprint planning in construction projects—AFD method.” Int. J. Adv. Res. Dev. 3 (5): 88–93.
Karadal, H., and M. Saygin. 2011. “The effect of information technology on innovation abilities: A research on SEMs.” In Proc., Int. Conf. on Eurasian Economies. Bishkek, Kyrgyzstan: Kyrgyzstan-Turkey Manas Univ.
Karrbom Gustavsson, T., and H. Gohary. 2012. “Boundary action in construction projects: New collaborative project practices.” Int. J. Managing Project Bus. 5 (3): 364–376. https://doi.org/10.1108/17538371211235272.
Kashikar, A., D. Mehta, B. Motichandani, and D. Dasika. 2016. “A case study on agile and lean project management in construction industry.” IOSR J. Mech. Civ. Eng. 13 (4): 31–39. https://doi.org/10.9790/1684-1304013139.
Kline, R. B. 1998. Principles and practices of structural equation modeling. New York: Guilford.
Kohli, A. K., B. J. Jaworski, and A. Kumar. 1993. “MARKOR: A measure of market orientation.” J. Marketing Res. 30 (4): 467–477. https://doi.org/10.1177/002224379303000406.
Kumar, S. S., and J. J. McArthur. 2015. “Streamlining building information model creation using agile project management.” WIT Trans. Built Environ. 149 (Sep): 229–240. https://doi.org/10.2495/BIM150201.
Lam, L. W. 2012. “Impact of competitiveness on salespeople’s commitment and performance.” J. Bus. Res. 65 (9): 1328–1334. https://doi.org/10.1016/j.jbusres.2011.10.026.
Leicht, D., D. Castro-Fresno, J. Dìaz, and C. Baier. 2020. “Multidimensional construction planning and agile organized project execution—The 5D-PROMPT method.” Sustainability 12 (16): 6340. https://doi.org/10.3390/su12166340.
Lewis, M. W., M. A. Welsh, G. E. Dehler, and S. G. Green. 2002. “Product development tensions: Exploring contrasting styles of project management.” Acad. Manage. J. 45 (3): 546–564. https://doi.org/10.5465/3069380.
Li, Q., Z. Yin, H. Y. Chong, and Q. Shi. 2018. “Nexus of interorganizational trust, principled negotiation, and joint action for improved cost performance: Survey of Chinese megaprojects.” J. Manage. Eng. 34 (6): 04018036. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000634.
Lukjanska, R. 2010. “Internal and external innovation hindering obstacles at SME.” In Proc., Int. Scientific Conf. BMRA. Vilnius, Lithuania: Latvia Univ. of Agriculture.
Ma, Z., L. Qi, and K. Wang. 2008. “Knowledge sharing in Chinese construction project teams and its affecting factors: An empirical study.” Chin. Manage. Stud. 2 (2): 97–108. https://doi.org/10.1108/17506140810882234.
MacCormack, A., and R. Verganti. 2003. “Managing the sources of uncertainty: Matching process and context in software development.” J. Prod. Innovation Manage. 20 (3): 217–232. https://doi.org/10.1111/1540-5885.2003004.
Magistretti, S., D. Trabucchi, C. Dell’Era, and T. Buganza. 2019. “A new path toward a hybrid model: Insights from PwC’s Italian experience centre.” Res. Technol. Manage. 62 (5): 30–37. https://doi.org/10.1080/08956308.2019.1638223.
Malhotra, N. K., and S. Dash. 2010. Marketing research: An applied orientation. Delhi, India: Pearson.
Mas-Tur, A., and V. S. Moya. 2015. “Young innovative companies (YICs) and entrepreneurship policy.” J. Bus. Res. 68 (7): 1432–1435. https://doi.org/10.1016/j.jbusres.2015.01.028.
Meng, X. 2012. “The effect of relationship management on project performance in construction.” Int. J. Project Manage. 30 (2): 188–198. https://doi.org/10.1016/j.ijproman.2011.04.002.
Mishra, A., K. K. Sinha, and S. Thirumalai. 2017. “Project quality: The Achilles heel of offshore technology projects?” IEEE Trans. Eng. Manage. 64 (3): 272–286. https://doi.org/10.1109/TEM.2017.2662021.
Misra, S. C., V. Kumar, and U. Kumar. 2009. “Identifying some important success factors in adopting agile software development practices.” J. Syst. Software 82 (11): 1869–1890. https://doi.org/10.1016/j.jss.2009.05.052.
Moe, N. B., T. Dingsøyr, and T. Dybå. 2010. “A teamwork model for understanding an agile team: A case study of a Scrum project.” Inf. Software Technol. 52 (5): 480–491. https://doi.org/10.1016/j.infsof.2009.11.004.
Mohammed, S. R., and A. J. Jasim. 2018. “Using agile construction management principles for reducing delay in Iraqi construction industry.” Assoc. Arab Univ. J. Eng. Sci. 25 (5): 151–170.
Murari, K. 2015. Impact of leadership styles on employee empowerment. Bloomington, IN: Partridge Publishing.
Nawaz, W., and M. Koç. 2018. “Development of a systematic framework for sustainability management of organizations.” J. Cleaner Prod. 171 (Jan): 1255–1274. https://doi.org/10.1016/j.jclepro.2017.10.011.
Nowotarski, P., and J. Paslawski. 2015. “Barriers in running construction SME—Case study on introduction of agile methodology to electrical subcontractor.” Procedia Eng. 122 (Jan): 47–56. https://doi.org/10.1016/j.proeng.2015.10.006.
Nunally, J. 1978. Psychometric theory. New York: McGraw-Hill.
Olanipekun, A. O., B. Xia, C. Hon, and A. Darko. 2018. “Effect of motivation and owner commitment on the delivery performance of green building projects.” J. Manage. Eng. 34 (1): 04017039. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000559.
Owen, R., L. J. Koskela, G. Henrich, and R. Codinhoto. 2006. “Is agile project management applicable to construction?” In Proc., 14th Annual Conf. Int. on Group Lean Construction. Auckland, New Zealand: International Group for Lean Construction.
Ozorhon, B. 2013. “Analysis of construction innovation process at project level.” J. Manage. Eng. 29 (4): 455–463. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000157.
Ozorhon, B., C. Abbott, and G. Aouad. 2014. “Integration and leadership as enablers of innovation in construction: Case study.” J. Manage. Eng. 30 (2): 256–263. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000204.
Ozorhon, B., D. Arditi, I. Dikmen, and M. T. Birgonul. 2010. “Performance of international joint ventures in construction.” J. Manage. Eng. 26 (4): 209–222. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000022.
Pender, S. 2001. “Managing incomplete knowledge: Why risk management is not sufficient.” Int. J. Project Manage. 19 (2): 79–87. https://doi.org/10.1016/S0263-7863(99)00052-6.
Piater, A. 1984. Barriers to innovation. London: Pinter.
Pikas, E., L. Koskela, B. Dave, and R. Liias. 2015. “Case study on design management: Inefficiencies and possible remedies.” In Proc., 23rd Annual Conf. Int. Group Lean Construction. Auckland, New Zealand: International Group for Lean Construction.
PMI (Project Management Institute). 2017a. Agile practice guide. Newtown Square, PA: PMI.
PMI (Project Management Institute). 2017b. A guide to the project management body of knowledge. 6th ed. Newtown Square, PA: PMI.
Port, D., and T. Bui. 2009. “Simulating mixed agile and plan-based requirements prioritization strategies: Proof-of-concept and practical implications.” Eur. J. Inf. Syst. 18 (4): 317–331. https://doi.org/10.1057/ejis.2009.19.
Pourshafie Ardestani, M., and H. Sarvari. 2020. “Identifying and investigating usage barriers of agile project management in road construction projects.” Amirkabir J. Civ. Eng. 52 (7): 1837–1852. https://doi.org/10.22060/CEEJ.2019.15677.5996.
Qaravi, R. 2018. “Agile project management within the BIM based common data environment.” Accessed August 14, 2021. http://urn.fi/URN:NBN:fi:amk-2018092815505.
Raiden, A. B., A. R. Dainty, and R. H. Neale. 2004. “Current barriers and possible solutions to effective project team formation and deployment within a large construction organization.” Int. J. Project Manage. 22 (4): 309–316. https://doi.org/10.1016/j.ijproman.2003.08.002.
Rasnacis, A., and S. Berzisa. 2017. “Method for adaptation and implementation of agile project management methodology.” Procedia Comput. Sci. 104 (Jan): 43–50. https://doi.org/10.1016/j.procs.2017.01.055.
Robinson, H. S., P. M. Carrillo, C. J. Anumba, and A. M. Al-Ghassani. 2005. “Knowledge management practices in large construction organisations.” Eng. Constr. Archit. Manage. 12 (5): 431–445. https://doi.org/10.1108/09699980510627135.
Sakikhales, M. H., and S. Stravoravdis. 2017. “Using agile project management and BIM for improved building performance.” In Building information modelling, building performance, design and smart construction. Cham, Switzerland: Springer.
Schneider, C., and R. Veugelers. 2010. “On young highly innovative companies: Why they matter and how (not) to policy support them.” Ind. Corporate Change 19 (4): 969–1007. https://doi.org/10.1093/icc/dtp052.
Schwaber, K. 2004. Agile project management with Scrum. Redmond, WA: Microsoft Press.
Serrador, P., and J. K. Pinto. 2015. “Does agile work?—A quantitative analysis of agile project success.” Int. J. Project Manage. 33 (5): 1040–1051. https://doi.org/10.1016/j.ijproman.2015.01.006.
Sharma, D. C. 2006. “A risky environment for investment.” Environ. Health Perpect. 114 (8): A478–A481. https://doi.org/10.1289/ehp.114-a478.
Shateri, K., and A. A. Hayat. 2020. “Investigating the mediating role of organizational trust in the relationship between perceived organizational support and knowledge sharing.” Knowl. Manage. E-Learn. 12 (3): 298–314. https://doi.org/10.34105/j.kmel.2020.12.016.
Sheng, C. W., Y. F. Tian, and M. C. Chen. 2010. “Relationships among teamwork behavior, trust, perceived team support, and team commitment.” Social Behav. Personality Int. J. 38 (10): 1297–1305. https://doi.org/10.2224/sbp.2010.38.10.1297.
Shrivastava, S. V., and U. Rathod. 2017. “A risk management framework for distributed agile projects.” Inf. Software Technol. 85 (May): 1–15. https://doi.org/10.1016/j.infsof.2016.12.005.
Sohi, A. J., M. Hertogh, M. Bosch-Rekveldt, and R. Blom. 2016. “Does lean & agile project management help coping with project complexity?” Procedia-Social Behav. Sci. 226 (Jul): 252–259. https://doi.org/10.1016/j.sbspro.2016.06.186.
Sonneveld, J. R. W. 2018. “Building agile teams: Enhancing project team performance by applying agile project management aspects in the engineering industry.” Accessed August 14, 2021. http://resolver.tudelft.nl/uuid:d0da5438-284b-43dc-b2ad-3009c1a9c59a.
Strausser, G. 2015. A guide to the project management body of knowledge. 6th ed. Newtown Square, PA: PMI.
Streule, T., N. Miserini, O. Bartlomé, M. Klippel, and B. G. De Soto. 2016. “Implementation of scrum in the construction industry.” Procedia Eng. 164 (Jan): 269–276. https://doi.org/10.1016/j.proeng.2016.11.619.
Tatum, C. B. 1987. “Innovation on the construction project: A process view.” Project Manage. J. 18 (5): 57–68.
Tomek, R., and S. Kalinichuk. 2015. “Agile PM and BIM: A hybrid scheduling approach for a technological construction project.” Procedia Eng. 123 (Jan): 557–564. https://doi.org/10.1016/j.proeng.2015.10.108.
Totten, J. 2017. “Critical success factors for agile project management in non-software related product development teams.” Accessed August 14, 2021. https://scholarworks.wmich.edu/dissertations/3178.
Vázquez-Bustelo, D., L. Avella, and E. Fernández. 2007. “Agility drivers, enablers and outcomes: Empirical test of an integrated agile manufacturing model.” Int. J. Oper. Prod. Manage. 27 (12): 1303–1332. https://doi.org/10.1108/01443570710835633.
Vijayasarathy, L. E. O. R., and D. Turk. 2008. “Agile software development: A survey of early adopters.” J. Inf. Technol. Manage. 19 (2): 1–8.
Walker, A. 2007. Project management in construction. 5th ed. Oxford: Blackwell.
Wang, Z. Z., S. L. Pan, T. H. Ouyang, and T. C. Chou. 2013. “Achieving IT-enabled enterprise agility in China: An IT organizational identity perspective.” IEEE Trans. Eng. Manage. 61 (1): 182–195. https://doi.org/10.1109/TEM.2013.2259494.
Wolf, E. J., K. M. Harrington, S. L. Clark, and M. W. Miller. 2013. “Sample size requirements for structural equation models: An evaluation of power, bias, and solution propriety.” Educ. Psychol. Meas. 73 (6): 913–934. https://doi.org/10.1177/0013164413495237.
Wysocki, R. K. 2006. Effective software project management. Indianapolis: Wiley.
Xiong, B., M. Skitmore, and B. Xia. 2015. “A critical review of structural equation modeling applications in construction research.” Autom. Constr. 49 (Jan): 59–70. https://doi.org/10.1016/j.autcon.2014.09.006.
Yoshimura, M., Y. Fujimi, K. Izui, and S. Nishiwaki. 2006. “Decision-making support system for human resource allocation in product development projects.” Int. J. Prod. Res. 44 (5): 831–848. https://doi.org/10.1080/00207540500272519.
Younas, M., D. N. A. Jawawi, I. Ghani, M. A. Shah, M. M. Khurshid, and S. H. H. Madni. 2019. “Framework for agile development using cloud computing: A survey.” Arabian J. Sci. Eng. 44 (11): 8989–9005. https://doi.org/10.1007/s13369-019-03923-6.
Zhang, Z., and H. Sharifi. 2007. “Towards theory building in agile manufacturing strategy—A taxonomical approach.” IEEE Trans. Eng. Manage. 54 (2): 351–370. https://doi.org/10.1109/TEM.2007.893989.
Zuzek, T., Z. Gosar, J. Kusar, and T. Berlec. 2020. “Adopting agile project management practices in non-software SMEs: A case study of a Slovenian medium-sized manufacturing company.” Sustainability 12 (21): 9245. https://doi.org/10.3390/su12219245.

Information & Authors

Information

Published In

Go to Journal of Management in Engineering
Journal of Management in Engineering
Volume 38Issue 4July 2022

History

Received: Aug 16, 2021
Accepted: Feb 14, 2022
Published online: Mar 24, 2022
Published in print: Jul 1, 2022
Discussion open until: Aug 24, 2022

Permissions

Request permissions for this article.

Authors

Affiliations

Professor, Dept. of Civil Engineering, Bogazici Univ., Istanbul 34342, Turkey. ORCID: https://orcid.org/0000-0002-4963-6937. Email: [email protected]
Fatih Cardak [email protected]
Formerly, Graduate Student, Dept. of Civil Engineering, Bogazici Univ., Istanbul 34342, Turkey. Email: [email protected]
Semih Caglayan [email protected]
Assistant Professor, Dept. of Civil Engineering, Sakarya Univ. of Applied Sciences, Sakarya 54050, Turkey (corresponding author). Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

  • Influence Mechanism of Construction Supply Chain Information Collaboration Based on Structural Equation Model, Sustainability, 10.3390/su15032155, 15, 3, (2155), (2023).

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share