Technical Papers
Mar 24, 2022

Strategies to Achieve High Adoption of Organizational Change Initiatives within the AEC Industry

Publication: Journal of Management in Engineering
Volume 38, Issue 4

Abstract

Organizations must be adept at managing the adoption of change initiatives. However, it is argued that more than half of change adoption efforts fail to reach their objectives. This study modeled the relationships between six change management strategies and three identified levels of change adoption outcomes (unsuccessful, moderately successful, and very successful). A total of 633 cases of organizational change adoption were collected from architecture, engineering, and construction (AEC) firms across the US and Canada, of which almost half of the cases represent the adoption of digital technologies. Multinomial logistic regression analyses showed that at least five change management strategies must be used effectively in combination to avoid failed change adoption outcomes. Very successful adoption cases have used two strategies (change agents and realistic timeframe) in a highly effective manner. This study contributes to the body of knowledge of management in engineering by defining three levels of change adoption outcomes and identifying the most effective change management strategies among the different levels.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Some or all data, models, or codes that support the findings of this study are available from the corresponding author upon reasonable request, such as descriptive statistics and regression model results of all study variables.

References

Ahn, Y. H., Y. H. Kwak, and S. J. Suk. 2016. “Contractor’s transformation strategies for adopting building information modeling.” J. Manage. Eng. 32 (1): 05015005. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000390.
Aldossari, K. M., B. C. Lines, J. B. Smithwick, K. C. Hurtado, and K. T. Sullivan. 2021a. “Alternative project delivery method adoption in the AEC industry: An organizational change perspective.” Int. J. Constr. Educ. Res. 1–16. https://doi.org/10.1080/15578771.2021.2013997.
Aldossari, K. M., B. C. Lines, J. B. Smithwick, K. C. Hurtado, and K. T. Sullivan. 2021b. “Best practices of organizational change for adopting alternative project delivery methods in the AEC industry.” Eng. Constr. Archit. Manage. 28 (4): 1060–1082. https://doi.org/10.1108/ECAM-03-2020-0166.
Allison, P. 2014. “Listwise deletion: It’s NOT evil.” Accessed June 13, 2014. https://statisticalhorizons.com/listwise-deletion-its-not-evil.
Alvesson, M. 2002. Understanding organizational culture. London: SAGE.
Anderson, T. W. 1984. An introduction to multivariate statistical analysis. New York: Wiley.
Anwer, S., H. Li, M. F. Antwi-Afari, W. Umer, I. Mehmood, M. Al-Hussein, and A. Y. L. Wong. 2021. “Test-retest reliability, validity, and responsiveness of a textile-based wearable sensor for real-time assessment of physical fatigue in construction bar-benders.” J. Build. Eng. 44 (Dec): 103348. https://doi.org/10.1016/j.jobe.2021.103348.
Aranyossy, M., B. Blaskovics, and Á. A. Horváth. 2018. “How universal are IT project success and failure factors? Evidence from Hungary.” Inf. Syst. Manage. 35 (1): 15–28. https://doi.org/10.1080/10580530.2017.1416943.
Arayici, Y., P. Coates, L. Koskela, M. Kagioglou, C. Usher, and K. O’Reilly. 2011. “Technology adoption in the BIM implementation for lean architectural practice.” Autom. Constr. 20 (2): 189–195. https://doi.org/10.1016/j.autcon.2010.09.016.
Armenakis, A. A., S. G. Harris, and H. S. Feild. 1999. “Making change permanent A model for institutionalizing change interventions.” In Research in organizational change and development, 97–128. Bingley, UK: Emerald Group.
Ayinla, K. O., and Z. Adamu. 2018. “Bridging the digital divide gap in BIM technology adoption.” Eng. Constr. Archit. Manage. 25 (10): 1398–1416. https://doi.org/10.1108/ECAM-05-2017-0091.
Beer, M., and R. A. Eisenstat. 1996. “Developing an organization capable of implementing strategy and learning.” Hum. Relat. 49 (5): 597–619. https://doi.org/10.1177/001872679604900504.
Bourne, M., A. Neely, K. Platts, and J. Mills. 2002. “The success and failure of performance measurement initiatives: Perceptions of participating managers.” Int. J. Oper. Prod. Manage. 22 (11): 1288–1310. https://doi.org/10.1108/01443570210450329.
Bowling, A. 1997. Research methods in health: Investigating health and health services. Buckingham, PA: Open University Press.
Brandi, U., and B. Elkjaer. 2012. “Organizational learning viewed from a social learning perspective.” In Handbook of organizational learning and knowledge management, 21–41. Chichester, UK: Wiley.
Burnes, B. 2009. Managing change. London: Prentice-Hall.
Burns, N., and K. Groves. 1997. Practice of nursing research. Philadelphia: WB Saunders.
Cameron, K. S., and R. E. Quinn. 1999. Diagnosing and changing organizational culture: Based on the competing values framework. San Francisco: Wiley.
Carreira, P., T. Castelo, C. C. Gomes, A. Ferreira, C. Ribeiro, and A. A. Costa. 2018. “Virtual reality as integration environments for facilities management: Application and users perception.” Eng. Constr. Archit. Manage. 25 (1): 90–112. https://doi.org/10.1108/ECAM-09-2016-0198.
Cattell, R. B. 1966. “The scree test for the number of factors.” Multivar. Behav. Res. 1 (2): 245–276. https://doi.org/10.1207/s15327906mbr0102_10.
Chang, C.-Y., W. Pan, and R. Howard. 2017. “Impact of building information modeling implementation on the acceptance of integrated delivery systems: Structural equation modeling analysis.” J. Constr. Eng. Manage. 143 (8): 04017044. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001335.
Cheng, T., and J. Teizer. 2013. “Real-time resource location data collection and visualization technology for construction safety and activity monitoring applications.” Autom. Constr. 34 (Sep): 3–15. https://doi.org/10.1016/j.autcon.2012.10.017.
Choi, J. O., B. K. Shrestha, Y. H. Kwak, and J. S. Shane. 2020a. “Innovative technologies and management approaches for facility design standardization and modularization of capital projects.” J. Manage. Eng. 36 (5): 04020042. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000805.
Choi, M., S. Ahn, and J. Seo. 2020b. “VR-Based investigation of forklift operator situation awareness for preventing collision accidents.” Accid. Anal. Prev. 136 (Mar): 105404. https://doi.org/10.1016/j.aap.2019.105404.
Chong, H. Y., R. Lopez, J. Wang, X. Wang, and Z. Zhao. 2016. “Comparative analysis on the adoption and use of BIM in road infrastructure projects.” J. Manage. Eng. 32 (6): 05016021. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000460.
Cohen, J. 1988. Statistical power analysis for the behavioral sciences. Hoboken, NJ: Taylor and Francis.
Crew, W. A. 2017. “Best practices create innovation and improved competitiveness.” J. Constr. Eng. Manage. 143 (9): 02517005. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001372.
Davila Delgado, J. M., L. Oyedele, T. Beach, and P. Demian. 2020. “Augmented and virtual reality in construction: Drivers and limitations for industry adoption.” J. Constr. Eng. Manage. 146 (7): 04020079. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001844.
de la Boutetière, H., A. Montagner, and A. Reich. 2018. Unlocking success in digital transformations. New York: McKinsey & Company.
DeVellis, R. F. 2003. Scale development: Theory and applications in applied social research. Thousand Oaks, CA: SAGE.
Edirisinghe, R. 2019. “Digital skin of the construction site: Smart sensor technologies towards the future smart construction site.” Eng. Constr. Archit. Manage. 26 (2): 184–223. https://doi.org/10.1108/ECAM-04-2017-0066.
Emiliani, M. L., and D. J. Stec. 2005. “Leaders lost in transformation.” Leadersh. Organ. Dev. J. 26 (5): 370–387. https://doi.org/10.1108/01437730510607862.
Eskerod, P., J. B. Justesen, and G. Sjøgaard. 2017. “Enriching project organizations with formal change agents: Health promotion projects at the workplace.” Int. J. Manage. Project Bus. 10 (3): 578–599. https://doi.org/10.1108/IJMPB-03-2016-0028.
Galpin, T. J. 1996. The human side of change: A practical guide to organization redesign. San Francisco: Jossey-Bass.
Gan, X.-L., R.-D. Chang, C. Langston, and T. Wen. 2019. “Exploring the interactions among factors impeding the diffusion of prefabricated building technologies: Fuzzy cognitive maps.” Eng. Constr. Archit. Manage. 26 (3): 535–553. https://doi.org/10.1108/ECAM-05-2018-0198.
George, D., and P. Mallery. 2010. SPSS for Windows step by step. A simple study guide and reference (10. Baskı). Boston: Pearson Education.
Gholizadeh, P., B. Esmaeili, and P. Goodrum. 2018. “Diffusion of building information modeling functions in the construction industry.” J. Manage. Eng. 34 (2): 04017060. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000589.
Gu, N., and K. London. 2010. “Understanding and facilitating BIM adoption in the AEC industry.” Autom. Constr. 19 (8): 988–999. https://doi.org/10.1016/j.autcon.2010.09.002.
Harty, C. 2005. “Innovation in construction: A sociology of technology approach.” Build. Res. Inf. 33 (6): 512–522. https://doi.org/10.1080/09613210500288605.
Harty, C. 2008. “Implementing innovation in construction: Contexts, relative boundedness and actor-network theory.” Construct. Manage. Econ. 26 (10): 1029–1041. https://doi.org/10.1080/01446190802298413.
Hornstein, H. A. 2015. “The integration of project management and organizational change management is now a necessity.” Int. J. Project Manage. 33 (2): 291–298. https://doi.org/10.1016/j.ijproman.2014.08.005.
Hunsucker, J. L., and D. Loos. 1989. “Transition management—An analysis of strategic considerations for effective implementation.” Eng. Manage. Int. 5 (3): 167–178. https://doi.org/10.1016/S0167-5419(89)80014-6.
Hwang, B.-G., X. Zhao, and K. W. Yang. 2019. “Effect of BIM on rework in construction projects in Singapore: Status quo, magnitude, impact, and strategies.” J. Constr. Eng. Manage. 145 (2): 04018125. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001600.
Jiang, Y., and Y. Bai. 2020. “Estimation of construction site elevations using drone-based orthoimagery and deep learning.” J. Constr. Eng. Manage. 146 (8): 04020086. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001869.
Jiang, Y., Y. Bai, and S. Han. 2020. “Determining ground elevations covered by vegetation on construction sites using drone-based orthoimage and convolutional neural network.” J. Comput. Civ. Eng. 34 (6): 04020049. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000930.
Kaiser, H. F. 1974. “An index of factorial simplicity.” Psychometrika 39 (1): 31–36. https://doi.org/10.1007/BF02291575.
Kanter, R. M. 1983. The change masters: Innovation for productivity in the American corporation. New York: Simon and Schuster.
Kanter, R. M. 2003. Challenge of organizational change: How companies experience it and leaders guide it. New York: Simon and Schuster.
Kotter, J. P. 1995. “Leading change: Why transformation efforts fail.” Harv. Bus. Rev. 73 (2): 59–67.
Lee, S., and J. Yu. 2016. “Comparative study of BIM acceptance between Korea and the United States.” J. Constr. Eng. Manage. 142 (3): 05015016. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001076.
Lewin, K. 1947. “Frontiers in group dynamics: Concept, method and reality in social science; social equilibria and social change.” Hum. Rel. 1 (1): 5–41. https://doi.org/10.1177/001872674700100103.
Li, N., and B. Becerik-Gerber. 2011. “Life-cycle approach for implementing RFID technology in construction: Learning from academic and industry use cases.” J. Constr. Eng. Manage. 137 (12): 1089–1098. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000376.
Liao, L., and E. A. L. Teo. 2018. “Organizational change perspective on people management in BIM implementation in building projects.” J. Manage. Eng. 34 (3): 04018008. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000604.
Lines, B. C., and P. K. Reddy Vardireddy. 2017. “Drivers of organizational change within the AEC industry: Linking change management practices with successful change adoption.” J. Manage. Eng. 33 (6): 04017031. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000548.
Lines, B. C., and J. B. Smithwick. 2019. “Best practices for organizational change management within electrical contractors.” Int. J. Constr. Educ. Res. 15 (2): 136–159. https://doi.org/10.1080/15578771.2018.1479723.
Lines, B. C., K. T. Sullivan, J. B. Smithwick, and J. Mischung. 2015. “Overcoming resistance to change in engineering and construction: Change management factors for owner organizations.” Int. J. Project Manage. 33 (5): 1170–1179. https://doi.org/10.1016/j.ijproman.2015.01.008.
Liu, N., L. Ruan, R. Jin, Y. Chen, X. Deng, and T. Yang. 2019. “Investigation of individual perceptions towards BIM implementation: A Chongqing case study.” Eng. Constr. Archit. Manage. 26 (7): 1455–1475. https://doi.org/10.1108/ECAM-08-2018-0342.
Liu, R., J. Du, R. R. A. Issa, and B. Giel. 2017. “BIM cloud score: Building information model and modeling performance benchmarking.” J. Constr. Eng. Manage. 143 (4): 04016109. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001251.
Long, J. S., and J. Freese. 2014. Regression models for categorical dependent variables using Stata. College Station, TX: Stata Press.
Loosemore, M. 2014. “Improving construction productivity: A subcontractor’s perspective.” Eng. Constr. Archit. Manage. 21 (3): 245–260. https://doi.org/10.1108/ECAM-05-2013-0043.
Loosemore, M., and E. Cheung. 2015. “Implementing systems thinking to manage risk in public private partnership projects.” Int. J. Project Manage. 33 (6): 1325–1334. https://doi.org/10.1016/j.ijproman.2015.02.005.
Lu, Y., Y. Li, M. Skibniewski, Z. Wu, R. Wang, and Y. Le. 2015. “Information and communication technology applications in architecture, engineering, and construction organizations: A 15-year review.” J. Manage. Eng. 31 (1): A4014010. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000319.
Luecke, R. 2003. Managing change and transition. Boston: Harvard Business Press.
Maali, O., B. Lines, J. Smithwick, K. Hurtado, and K. Sullivan. 2020. “Change management practices for adopting new technologies in the design and construction industry.” J. Inf. Technol. Constr. 25: 325–341. https://doi.org/10.36680/j.itcon.2020.019.
Magsaysay, J. F., and M. R. M. Hechanova. 2017. “Building an implicit change leadership theory.” Leadersh. Organ. Dev. J. 38 (6): 834–848. https://doi.org/10.1108/LODJ-05-2016-0114.
Martin, H. J., and M. W. Hrivnak. 2009. “Creating disciples: The transformation of employees into trainers.” Bus. Horiz. 52 (6): 605–616. https://doi.org/10.1016/j.bushor.2009.07.006.
Matthews, J., P. E. D. Love, J. Mewburn, C. Stobaus, and C. Ramanayaka. 2018. “Building information modelling in construction: Insights from collaboration and change management perspectives.” Product. Plann. Control 29 (3): 202–216. https://doi.org/10.1080/09537287.2017.1407005.
Migliaccio, G. C., G. E. Gibson Jr., and J. T. O’Connor. 2008. “Changing project delivery strategy: An implementation framework.” Public Works Manage. Policy 12 (3): 483–502. https://doi.org/10.1177/1087724X07311805.
Nnaji, C., J. Gambatese, A. Karakhan, and C. Eseonu. 2019. “Influential safety technology adoption predictors in construction.” Eng. Constr. Archit. Manage. 26 (11): 2655–2681. https://doi.org/10.1108/ECAM-09-2018-0381.
Ozorhon, B., and U. Karahan. 2017. “Critical success factors of building information modeling implementation.” J. Manage. Eng. 33 (3): 04016054. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000505.
Pan, M., and W. Pan. 2020. “Stakeholder perceptions of the future application of construction robots for buildings in a dialectical system framework.” J. Manage. Eng. 36 (6): 04020080. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000846.
Peansupap, V., and D. H. T. Walker. 2006. “Information communication technology (ICT) implementation constraints: A construction industry perspective.” Eng. Constr. Archit. Manage. 13 (4): 364–379. https://doi.org/10.1108/09699980610680171.
Price, A. D. F., and K. Chahal. 2006. “A strategic framework for change management.” Construct. Manage. Econ. 24 (3): 237–251. https://doi.org/10.1080/01446190500227011.
Rogers, E. M. 2003. Diffusion of innovations. 5th ed. New York: Free Press.
Rosenbaum, D., E. More, and P. Steane. 2018. “Planned organisational change management: Forward to the past? An exploratory literature review.” J. Organ. Change Manage. 31 (2): 286–303. https://doi.org/10.1108/JOCM-06-2015-0089.
Schneider, B., S. K. Gunnarson, and K. Niles-Jolly. 1994. “Creating the climate and culture of success.” Organ. Dyn. 23 (1): 17–29. https://doi.org/10.1016/0090-2616(94)90085-X.
Sepasgozar, S. M. E., S. Davis, M. Loosemore, and L. Bernold. 2018a. “An investigation of modern building equipment technology adoption in the Australian construction industry.” Eng. Constr. Archit. Manage. 25 (8): 1075–1091. https://doi.org/10.1108/ECAM-03-2017-0052.
Sepasgozar, S. M. E., S. R. Davis, H. Li, and X. Luo. 2018b. “Modeling the implementation process for new construction technologies: Thematic analysis based on Australian and U.S. practices.” J. Manage. Eng. 34 (3): 05018005. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000608.
Shea, C. M., S. R. Jacobs, D. A. Esserman, K. Bruce, and B. J. Weiner. 2014. “Organizational readiness for implementing change: A psychometric assessment of a new measure.” Implementation Sci. 9 (1): 7. https://doi.org/10.1186/1748-5908-9-7.
Siddiqui, S. Q., F. Ullah, M. J. Thaheem, and H. F. Gabriel. 2016. “Six Sigma in construction: A review of critical success factors.” Int. J. Lean Six Sigma 7 (2): 171–186. https://doi.org/10.1108/IJLSS-11-2015-0045.
Smollan, R. K. 2011. “The multi-dimensional nature of resistance to change.” J. Manage. Organ. 17 (6): 828–849. https://doi.org/10.5172/jmo.2011.828.
Sullivan, K. T. 2011. “Quality management programs in the construction industry: Best value compared with other methodologies.” J. Manage. Eng. 27 (4): 210–219. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000054.
Tan, H. C., P. M. Carrillo, and C. J. Anumba. 2012. “Case study of knowledge management implementation in a medium-sized construction sector firm.” J. Manage. Eng. 28 (3): 338–347. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000109.
Tayeh, R., and R. R. A. Issa. 2020. “Interactive holograms for construction coordination and quantification.” J. Manage. Eng. 36 (6): 04020079. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000847.
Vass, S., and T. K. Gustavsson. 2017. “Challenges when implementing BIM for industry change.” Construct. Manage. Econ. 35 (10): 597–610. https://doi.org/10.1080/01446193.2017.1314519.
Wolpert, C. 2010. “The success of Caterpillar’s global approach to change management.” Global Bus. Organ. Excellence 29 (6): 17–24. https://doi.org/10.1002/joe.20345.
Wynn, A. T. 2019. “Change without an agent: What happens when change agents leave?” Organ. Dyn. 48 (4): 100723. https://doi.org/10.1016/j.orgdyn.2019.04.009.
Xu, H., J. Feng, and S. Li. 2014. “Users-orientated evaluation of building information model in the Chinese construction industry.” Autom. Constr. 39 (Apr): 32–46. https://doi.org/10.1016/j.autcon.2013.12.004.
Yeo, C. J., J. H. Yu, and Y. Kang. 2020. “Quantifying the effectiveness of IoT technologies for accident prevention.” J. Manage. Eng. 36 (5): 04020054. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000825.
Yuan, M., Z. Li, X. Li, X. Luo, X. Yin, and J. Cai. 2021. “Proposing a multifaceted model for adopting prefabricated construction technology in the construction industry.” Eng. Constr. Archit. Manage. https://doi.org/10.1108/ECAM-07-2021-0613.
Zhao, X., B.-G. Hwang, S. P. Low, and P. Wu. 2015. “Reducing hindrances to enterprise risk management implementation in construction firms.” J. Constr. Eng. Manage. 141 (3): 04014083. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000945.
Zhou, Y., Y. Yang, and J.-B. Yang. 2019. “Barriers to BIM implementation strategies in China.” Eng. Constr. Archit. Manage. 26 (3): 554–574. https://doi.org/10.1108/ECAM-04-2018-0158.

Information & Authors

Information

Published In

Go to Journal of Management in Engineering
Journal of Management in Engineering
Volume 38Issue 4July 2022

History

Received: Sep 30, 2021
Accepted: Feb 9, 2022
Published online: Mar 24, 2022
Published in print: Jul 1, 2022
Discussion open until: Aug 24, 2022

Permissions

Request permissions for this article.

Authors

Affiliations

Ph.D. Candidate, Dept. of Civil, Environmental and Architectural Engineering, Univ. of Kansas, 1530 W. 15th St., 2150 Learned Hall, Lawrence, KS 66045 (corresponding author). ORCID: https://orcid.org/0000-0003-2946-2025. Email: [email protected]; [email protected]
Nancy Kepple [email protected]
Associate Professor, School of Social Welfare, Univ. of Kansas, 1545 Lilac Lane, 113 Twente Hall, Lawrence, KS 66045. Email: [email protected]
Associate Professor, Dept. of Civil, Environmental and Architectural Engineering, Univ. of Kansas, 1530 W. 15th St., 2135B Learned Hall, Lawrence, KS 66045. ORCID: https://orcid.org/0000-0002-7998-1053. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

  • Turning Pressure into Power: The Configuration Effect of Antecedents on the Digital Transformation of Engineering Enterprises, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-5636, 40, 1, (2024).
  • Understanding the slow diffusion of alternative delivery systems using interpretive structural modelling, Construction Management and Economics, 10.1080/01446193.2022.2081990, 40, 6, (459-476), (2022).

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share