Interpreting Contractual Rights to COVID-19 Remedies: An Analysis of Cases
Publication: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Volume 14, Issue 4
Abstract
The construction industry has been adversely impacted by the COVID-19 pandemic including significant delays on projects and outbreaks of COVID-19 on site. UK legal cases interpreting contractual rights to COVID-19 remedies are analyzed in this paper. The analysis of UK legal cases regarding potential contractual rights to COVID-19 remedies including change in law, force majeure, and frustration has revealed the barriers to recovery of losses. Instead, construction companies could consider focusing on more commonly used contract provisions, for example, extensions of time and prolongation claims or compensation events. The UK Supreme Court has ruled on the possibility of payment from business interruption insurance. Even the UK government has failed to comply with public procurement law under pressure of the COVID-19 pandemic. The High Court in London has ruled that landlords are entitled to recover rent and service charges owed to them by tenants whose businesses were mandated to close by coronavirus restrictions.
Get full access to this article
View all available purchase options and get full access to this article.
Data Availability Statement
No data, models, or code were generated or used during the study.
References
List of Cases
Bank of New York Mellon (International) Limited v. Cine-UK Limited (“the First Claim”) and AEW UK REIT PLC v. Mecca Bingo Limited (“the Second Claim”) and AEW UK REIT PLC v. Sportsdirect.com Retail Limited (“the Third Claim”), (2021) EWHC 1013 (QB).
Commerz Real Investmentgesellschaft mbh v. TFS Stores Ltd., (2021) EWHC 863 (Ch).
Fibula Air Travel Srl v. Just-US Air Srl, (2020) EWHC 3048.
Good Law Project Ltd. & Ors, R. (On Application of) v. Secretary of State for Health and Social Care, (2021) EWHC 346 (Admin).
National Carriers v. Panalpina, (1981) AC 675.
Northern Ireland Housing Executive v. Healthy Buildings (Ireland) Ltd., (2017) NIQB 43.
Salam Air SAOC (Salam) v. Latam Airlines Group SA (Latam), (2020) EWHC 2414.
Saxby & Ors v. UDG Healthcare (UK) Holdings Ltd., (2021) EWHC 144 (Ch).
The Financial Conduct Authority & Ors v. Arch Insurance (UK) Ltd. & Ors, (2021) 2 WLR 123, (2021) UKSC.
Walter Lilley & Co. Ltd. v. Mackay, (2012) EWHC 1773 (TCC).
Westminster City Council v. Sports & Leisure Management Ltd., (2021) EWHC 98 (TCC).
Wood v. Capita Insurance Services Ltd., (2017) AC 1177.
2 Entertain Video Ltd. & Ors v. Sony DADC Europe Ltd., (2020) EWHC 972 (TCC).
List of Statutes
The Civil Procedure Rules 1998, SI 1998 No. 3132.
The Public Contracts Regulations 2015, SI 2015 No. 102.
Works Cited
Alsharef, A., S. Banerjee, S. Uddin, A. Albert, and E. Jaselskis. 2021. “Early impacts of the COVID-19 pandemic on the United States construction industry.” Int. J. Environ. Res. Public Health 18 (4): 1559. https://doi.org/10.3390/ijerph18041559.
Bushman, D., et al. 2021. “COVID-19 outbreaks at two construction sites—New York City, October–November 2020.” Supplement, Clin. Infect. Dis. 73 (S1): S81–S83. https://doi.org/10.1093/cid/ciab312.
Casady, C., and D. Baxter. 2020. “Pandemics, public-private partnerships (PPPs), and force majeure | COVID-19 expectations and implications.” Construct. Manage. Econ. 38 (12): 1077–1085. https://doi.org/10.1080/01446193.2020.1817516.
Charlson, J., and R. Dickson. 2021. “Covid-19 and construction law: Comparing the UK and Australian response.” Int. Constr. Law Rev. 38 (1): 5–38.
Hansen, S. 2020. “Does the COVID-19 outbreak constitute a force majeure event? A pandemic impact on construction contracts.” J. Civ. Eng. Forum 6 (1): 201–214. https://doi.org/10.22146/jcef.54997.
Pickavance, J. 2020. “A look beyond lockdown.” Int. Constr. Law Rev. 37 (4): 354–379.
Sierra, F. 2022. “COVID-19: Main challenges during construction stage.” Eng. Constr. Archit. Manage. 29 (4): 1817–1834. https://doi.org/10.1108/ECAM-09-2020-0719.
Information & Authors
Information
Published In
Copyright
© 2022 American Society of Civil Engineers.
History
Received: Jul 28, 2021
Accepted: Jan 20, 2022
Published online: Jun 25, 2022
Published in print: Nov 1, 2022
Discussion open until: Nov 25, 2022
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.
Cited by
- Nikhitha Adepu, Sharareh Kermanshachi, Apurva Pamidimukkala, A Synthesis of Literature on the Effects of COVID-19 on Construction Industry, Practice Periodical on Structural Design and Construction, 10.1061/PPSCFX.SCENG-1466, 29, 3, (2024).
- Jose Guevara, Diego Rojas, Rana Khallaf, Gabriel Castelblanco, Navigating PPP Renegotiations in the Wake of COVID-19: Insights from a Toll Road Program, Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 10.1061/JLADAH.LADR-1082, 16, 1, (2024).
- Jung Hyun Lee, Yunping Liang, Seyed Mohammad Ehsan Tabatabaee, Bryce Riccitelli, Evolvement of Excusable Delay Clauses in Government Contracts since the COVID-19 Pandemic, Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 10.1061/JLADAH.LADR-1059, 16, 1, (2024).
- Zorana Petojević, Milica Savić, Aleksandra Parezanović, Ana Nadaždi, COVID-19 Struggle and Post-COVID-19 Recovery: Exploring the Governance, Success, and Digital Transition in Construction Projects in Serbia, Sustainability, 10.3390/su15010674, 15, 1, (674), (2022).