Effects of Contractual Challenges in Building Information Modeling on Successful Implementation

Publication: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Volume 14, Issue 4

Abstract

Building information modeling (BIM) is a technology and process that creates profound changes in construction methods, directly affecting the optimization of the execution procedure and the methods outlined in construction project contracts. There is a lack of manuals for implementing BIM contracts in most developing countries. This lack of instruction has led to a slow acceptance and implementation of BIM in many developing countries. Previous studies have determined present challenges in relations, roles, and risks of a BIM-focused contract. Thus, this research investigates and determines how these contractual challenges may affect the implementation procedure and, ultimately, the successful execution of the contractual obligations relating to the use of BIM in projects. Accordingly, after a comprehensive literature review and listing the identified challenges, two sets of data collection from construction companies were used to define the effects of BIM contractual challenges. Consequently, data verification of the contractual challenges in these two case projects indicates a rise in BIM success due to its superior handling of project execution compared to how non-BIM projects handle similar challenges.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

All data that support the findings of this study are available from the corresponding author upon reasonable request.

References

Works Cited

Abanda, F. H., M. B. Manjia, C. Pettang, J. H. M. Tah, and G. E. Nkeng. 2014. “Building information modelling in Cameroon: Overcoming existing challenges.” Int. J. 3D Inf. Model. 3 (4): 1–25. https://doi.org/10.4018/ij3dim.2014100101.
Abdirad, H. 2015. “Advancing in building information modeling (BIM) contracting: Trends in the AEC/FM industry.” Accessed January 16, 2018. https://aecuk.files.wordpress.com/2012/09/aecukbimprotocol-v2-0.pdf.
Abd-Jamil, A. H., and M. S. Fathi. 2018. “Contractual challenges for BIM-based construction projects: A systematic review.” Built Environ. Project Asset Manage. 8 (4): 372–385. https://doi.org/10.1108/BEPAM-12-2017-0131.
Abubakar, M., Y. M. Ibrahim, D. Kado, and K. Bala. 2014. “Contractors’ perception of the factors affecting building information modelling (BIM) adoption in the Nigerian construction industry.” In Proc., 2014 Int. Conf. on Computing in Civil and Building Engineering, 167–178. Reston, VA: ASCE.
Ahmad, Z., M. J. Thaheem, and A. Maqsoom. 2018. “Building information modeling as a risk transformer: An evolutionary insight into the project uncertainty.” Autom. Constr. 92 (Aug): 103–119. https://doi.org/10.1016/j.autcon.2018.03.032.
Ahuja, R., A. Sawhney, and M. Arif. 2017. “Prioritizing BIM capabilities of an organization: An interpretive structural modeling analysis.” Procedia Eng. 196 (Jan): 2–10. https://doi.org/10.1016/j.proeng.2017.07.166.
Alreshidi, E., M. Mourshed, and Y. Rezgui. 2017. “Factors for effective BIM governance.” J. Build. Eng. 10 (Mar): 89–101. https://doi.org/10.1016/j.jobe.2017.02.006.
Alwash, A., P. E. Love, and O. Olatunji. 2017. “Impact and remedy of legal uncertainties in building information modeling.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 9 (3): 04517005. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000219.
Andre, G. R. 2011. Building information modeling (BIM): Special Contract Issues. Pittsburgh: K. L. Gates.
Arayici, Y., P. Coates, L. Koskela, M. Kagioglou, C. Usher, and K. O’Reilly. 2011. “Technology adoption in the BIM implementation for lean architectural practice.” Autom. Constr. 20 (2): 189–195. https://doi.org/10.1016/j.autcon.2010.09.016.
Arshad, M. F., M. J. Thaheem, A. R. Nasir, and M. S. A. Malik. 2019. “Contractual risks of building information modeling: Toward a standardized legal framework for design-bid-build projects.” J. Constr. Eng. Manage. 145 (4): 04019010. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001617.
Ashcraft, H. W. 2008. “Building information modeling: A framework for collaboration.” Constr. Law 28 (1): 5.
BSI (British Standards Institution). 2013. Specification for information management for the capital/delivery phase of construction projects using building information modelling. PAS 1192-2-2013. London: BSI.
Celoza, A., F. Leite, and D. P. de Oliveira. 2021. “Impact of BIM-related contract factors on project performance.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 13 (3): 04521011. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000478.
Chen, Y., Y. Yin, G. J. Browne, and D. Li. 2019. “Adoption of building information modeling in Chinese construction industry: The technology-organization-environment framework.” Eng. Constr. Archit. Manage. 26 (9): 1878–1898. https://doi.org/10.1108/ECAM-11-2017-0246.
Chien, K.-F., Z.-H. Wu, and S.-C. Huang. 2014. “Identifying and assessing critical risk factors for BIM projects: Empirical study.” Autom. Constr. 45 (Sep): 1–15. https://doi.org/10.1016/j.autcon.2014.04.012.
Chong, H. Y., S. L. Fan, M. Sutrisna, S. H. Hsieh, and C. M. Tsai. 2017. “Preliminary contractual framework for BIM-enabled projects.” J. Constr. Eng. Manage. 143 (7): 04017025. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001278.
Eadie, R., M. Browne, H. Odeyinka, C. McKeown, and S. McNiff. 2013. “BIM implementation throughout the UK construction project lifecycle: An analysis.” Autom. Constr. 36 (Dec): 145–151. https://doi.org/10.1016/j.autcon.2013.09.001.
Eadie, R., T. McLernon, and A. Patton. 2015. “An investigation into the legal issues relating to building information modelling (BIM).” In Proc., Rics Cobra Aubea 2015. London: Royal Institution of Chartered Surveyors.
Fan, S. L., H. Y. Chong, P. C. Liao, and C. Y. Lee. 2019. “Latent provisions for building information modeling (BIM) contracts: A social network analysis approach.” KSCE J. Civ. Eng. 23 (4): 1427–1435. https://doi.org/10.1007/s12205-019-0064-8.
Forghany, M. H. 2013. “Barriers ‘building information modeling’ in Iran.” In Proc., 10th Int. Conf. on Project Management. Tehran, Iran: Aryana Institute.
Gamil, Y., and I. A. R. Rahman. 2019. “Awareness and challenges of building information modelling (BIM) implementation in the Yemen construction industry.” J. Eng. Des. Technol. 17 (5): 1077–1084. https://doi.org/10.1108/JEDT-03-2019-0063.
Ghoddousi, P., and M. R. Hosseini. 2012. “A survey of the factors affecting the productivity of construction projects in Iran.” Technol. Econ. Dev. Econ. 18 (1): 99–116. https://doi.org/10.3846/20294913.2012.661203.
Gibbs, D.-J., S. Emmitt, K. Ruikar, and W. Lord. 2013. “An investigation into whether building information modelling (BIM) can assist with construction delay claims.” Int. J. 3D Inf. Model. 2 (1): 45–52. https://doi.org/10.4018/ij3dim.2013010105.
Greenwald, N. W. 2013. “A creative proposal for dispute systems design for construction projects employing BIM.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 5 (1): 2–5. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000106.
Hatmoko, J. U. D., Y. Fundra, and M. A. Wibowo. 2019. “Investigating building information modelling (BIM) adoption in Indonesia construction industry.” In Vol. 258 of Proc., MATEC Web of Conf., 02006. Les Ulis, France: EDP Sciences.
He, Q., L. Qian, Y. Duan, and Y. Li. 2012. “Current situation and barriers of BIM implementation.” [In Chinese.] J. Eng. Manage. 26 (1): 12–16.
Hong, Y., A. W. A. Hammad, S. Sepasgozar, and A. Akbarnezhad. 2019. “BIM adoption model for small and medium construction organisations in Australia.” Eng. Constr. Archit. Manage. 26 (2): 154–183. https://doi.org/10.1108/ECAM-04-2017-0064.
Hosseini, M. R., E. Azari, L. Tivendale, S. Banihashemi, and N. Chileshe. 2016. “Building information modeling (BIM) in Iran: An exploratory study.” J. Eng. Project Prod. Manage. 6 (2): 78–89. https://doi.org/10.32738/JEPPM.201607.0002.
IBC (Institute for BIM in Canada). 2012. Executive summary. Canada: IBC.
Jang, S., Y. Jeong, G. Lee, and Y. Kang. 2019. “Enhancing subcontractors’ participation in BIM-based design coordination under a DBB contract.” J. Manage. Eng. 35 (6): 04019022. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000714.
Jung, W., and G. Lee. 2015. “The status of BIM adoption on six continents.” Int. J. Civ. Environ. Eng. 9 (5): 512–516. https://doi.org/10.5281/zenodo.1100430.
Kang, J., B. Ryoo, and V. Faghihi. 2012. “Five challenges you need to know for successful BIM application in developing countries.” In Proc., 3rd Int. Conf. on Construction in Developing Countries (ICCIDC–III). Greenville, NC: East Carolina Univ.
Kiani, I., A. N. Sadeghifam, S. K. Ghomi, and A. K. B. Marsono. 2015. “Barriers to implementation of building information modeling in scheduling and planning phase in Iran.” Aust. J. Basic Appl. Sci. 9 (5): 91–97.
Larson, D. A., and K. A. Golden. 2007. “Entering the brave, new world: An introduction to contracting for building information modeling.” William Mitchell Law Rev. 34 (1): 75–108.
Manderson, A., M. Jefferies, and G. Brewer. 2015. “Building information modelling and standardised construction contracts: A content analysis of the GC21 contract.” Constr. Econ. Build. 15 (3): 72–84. https://doi.org/10.5130/AJCEB.v15i3.4608.
Maradza, E., J. Whyte, and G. D. Larsen. 2013. “Standardisation of building information modelling in the UK and USA: Challenges and opportunities.” In AEI 2013: Building solutions for architectural engineering, 458–467. Reston, VA: ASCE.
Olatunji, O. A. 2015. “Constructing dispute scenarios in building information modeling.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 8 (1): C4515001. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000165.
Papadonikolaki, E. 2017. “Grasping brutal and incremental BIM innovation through institutional logics.” In of Proc., 33rd Annual ARCOM Conf., edited by P. W. Chan, and C. J. Neilson, 54–63. Cambridge, UK: Association of Researchers in Construction Management.
Qin, X., Y. Shi, K. Lyu, and Y. Mo. 2020. “Using a TAM-TOE model to explore factors of building information modelling (BIM) adoption in the construction industry.” J. Civ. Eng. Manage. 26 (3): 259–277. https://doi.org/10.3846/jcem.2020.12176.
Richard, H. L., and M. M. Jason. 2010. “ConsensusDOCS 301 BIM addendum, contracts forms and drafting/building information modeling.” In ConsensusDOCS, materials are displayed or reproduced with the express written of ConsensusDOCS under license 0405. Arlington, VA: ConsensusDOCS.
Sawhney, A., A. Kapoor, S. Kamthan, N. Agarwal, P. Bhakre, and S. Jain. 2014. State of BIM adoption and outlook in India. Noida, India: RICS School of Built Environment, Amity Univ.
Sebastian, R. 2010. “Breaking through business and legal barriers of open collaborative processes based on building information modelling (BIM).” In Proc., CIM World Building Congress, 166–186. Delft, Netherlands: International Council for Building.
Shafaat, A., M. Alinizzi, T. Mahfouz, and A. Kandil. 2016. “Can contractors predict change orders? Investigating a historical allegation.” In Proc., Construction Research Congress 2016, 487–496. Reston, VA: ASCE.
Words & Images. 2009. Building information modeling: Understanding and operating in a new paradigm. Falls Church, VA: Foundation of the Wall and Ceiling Industry.
Yuan, H., Y. Yang, and X. Xue. 2019. “Promoting owners’ BIM adoption behaviors to achieve sustainable project management.” Sustainability 11 (14): 3905. https://doi.org/10.3390/su11143905.
Zahrizan, Z., N. M. Ali, A. T. Haron, A. Marshall-Ponting, and Z. A. Hamid. 2013. “Exploring the adoption of building information modelling (BIM) in the Malaysian construction industry: A qualitative approach.” Int. J. Res. Eng. Technol. 2 (8): 384–395. https://doi.org/10.15623/ijret.2013.0208060.

Information & Authors

Information

Published In

Go to Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Volume 14Issue 4November 2022

History

Received: Nov 16, 2021
Accepted: May 12, 2022
Published online: Aug 12, 2022
Published in print: Nov 1, 2022
Discussion open until: Jan 12, 2023

Permissions

Request permissions for this article.

Authors

Affiliations

Vahid Faghihi, A.M.ASCE [email protected]
Assistant Professor, Dept. of Construction Science, School of Architecture, Prairie View A&M Univ., Prairie View, TX. Email: [email protected]
Pouya Peimankar [email protected]
Graduate Student, Faculty of Architecture and Urban Planning, Shahid Beheshti Univ., Tehran 19839-69411, Iran. Email: [email protected]
Assistant Professor, Faculty of Architecture and Urban Planning, Shahid Beheshti Univ., Tehran 19839-69411, Iran. ORCID: https://orcid.org/0000-0002-6448-0934. Email: [email protected]
Assistant Professor, Faculty of Architecture and Urban Planning, Shahid Beheshti Univ., Tehran 19839-69411, Iran (corresponding author). ORCID: https://orcid.org/0000-0002-0784-6784. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

  • Industry 4.0 and Construction Contract Management: A Bibliometric Survey, Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 10.1061/JLADAH.LADR-988, 16, 3, (2024).

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share