Technical Papers
Mar 19, 2014

Impacts of Different Types of Owner-Contractor Conflict on Cost Performance in Construction Projects

Publication: Journal of Construction Engineering and Management
Volume 140, Issue 6

Abstract

Interactionism posits that all social structures have inherent conflicts within them that can yield positive or negative effects on organizational performance. Based on this theory, three essential types of conflict between the owners and contractors in construction projects were identified, namely, (1) relationship-related conflict, (2) process-related conflict, and (3) task-related conflict. Next, the authors of this paper presented four hypotheses to test the correlations among these three conflict types as well as influencing relationships between these conflicts and project cost performance. A total of 209 managers from the Chinese construction industry were interviewed to test these hypotheses. Factor analysis, correlation analysis, and regression analysis were performed on the data, revealing that (1) the three types of conflict are all positively correlated, (2) the relationship-related conflict has a negative impact on project cost performance, and (3) the task-related conflict influences project cost performance in an inverse-U shaped manner. These results can help conflict managers better understand the relationship between conflict and project performance, and encourage them to optimize different types of conflict for better project outcomes.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

The authors would like to acknowledge funding support from the National Natural Science Foundation of China (Project Number 71072156 and 71231006) and all of the respondents to the questionnaire survey. Additionally, the helpful and valuable suggestions from all the reviewers and editor are highly appreciated.

References

Acharya, N. K., Lee, Y. D., and Im, H. M. (2006). “Conflicting factors in construction projects: Korean perspective.” Eng. Construct. Architect. Manage., 13(6), 543–566.
Amason, A., and Schweiger, D. M. (1994). “Resolving the paradox of conflict, strategic decision making, and organizational performance.” Int. J. Conflict Manage., 5(3), 239–253.
Amason, A. C. (1996). “Distinguishing the effects of functional and dysfunctional conflict on strategic decision making: resolving a paradox for top management teams.” Acad. Manage. J., 39(1), 123–148.
Argyris, C. (1962). Interpersonal competence and organizational effectiveness, Dorsey, Homewood, IL.
Atkinson, R. (1999). “Project management: Cost, time, and quality, two best guesses and a phenomenon, it’s time to accept other success criteria.” Int. J. Proj. Manage., 17(6), 337–342.
Atuahene-Gima, K., and Li, H. (2002). “When does trust matter? Antecedents and contingent effects of supervisee trust on performance in selling new products in China and the United States.” J. Mark., 66(3), 61–81.
Ball, M., and Fletcher, M. (1994). “The role of the client and project management team in construction dispute avoidance.” Construction Conflict Management and Resolution, CIB Proc. TG15, P. Fenn, ed., Vol. TG15, Univ. of Manchester Institute of Science and Technology, Manchester, U.K., 14–22.
Bandura, A. (1977). “Self-efficacy: Toward a unifying theory of behavioral change.” Psychol. Rev., 84(2), 191–215.
Barki, H., and Hartwick, J. (2004). “Conceptualizing the construct of interpersonal conflict.” Int. J. Conflict Manage., 15(3), 216–244.
Baron, R. A. (1991). “Positive effects of conflict: A cognitive perspective.” Employee Responsibilities Rights J., 4(1), 25–36.
Barsade, S. G., Ward, A. J., Turner, J. D. F., and Sonnenfeld, J. A. (2000). “To your heart’s content: A model of affective diversity in top management teams.” Admin. Sci. Q, 45(4), 802–836.
Behfar, K. J., Mannix, E. A., Peterson, R. S., and Trochim, W. M. K. (2002). “A multi-faceted approach to intragroup conflict issues of theory and measurement.” Annual Conf. of the Int. Association for Conflict Management, Salt Lake City, UT.
Brehmer, B. (1976). “Social judgment theory and the analysis of interpersonal conflict.” Psychol. Bull., 83(6), 985–1003.
Brewer, M. B. (1979). “In-group bias in the minimal intergroup situation: A cognitive-motivational analysis.” Psychol. Bull., 86(2), 307–324.
Brown, L. D. (1983). Managing conflict at organizational interface, Addison-Wesley, Reading, MA.
Chen, Y. Q., Zhang, Y. B., Liu, J. Y., and Mo, P. (2012). “Interrelationships among critical success factors of construction projects based on the structural equation model.” J. Manage. Eng., 243–251.
Cheung, S. O., and Yiu, T. W. (2006). “Are construction disputes inevitable?” IEEE Trans. Eng. Manage., 53(3), 456–470.
Creed, W. E. D., and Miles, R. E. (1996). “Trust in organizations: A conceptual framework linking organizational forms, managerial philosophies, and the opportunity costs of controls.” Trust in organizations: Frontiers of theory and research, R. M. Kramer and T. R. Tyler, eds., Sage, Thousand Oaks, CA, 16–39.
De Dreu, C. K., and Weingart, L. R. (2003). “Task versus relationship conflict, team performance, and team member satisfaction: A meta-analysis.” J. Appl. Psych., 88(4), 741–749.
De Dreu, C. K. W., and West, M. A. (2001). “Minority dissent and team innovation: The importance of participation in decision making.” J. Appl. Psych., 86(6), 1191–1201.
Drexler, J. A., Jr., and Larson, E. W. (2000). “Partnering: Why project owner-contractor relationships change.” J. Constr. Eng. Manage., 293–297.
Dulaimi, M. F., Ling, F. Y. Y., and Bajracharya, A. (2003). “Organizational motivation and inter-organizational interaction in construction innovation in Singapore.” Constr. Manage. Econ., 21(3), 307–318.
Gersick, C. (1988). “Time and transition in work teams: toward a new model of group development.” Acad. Manage. J., 31(1), 9–41.
Gladestein, D. L. (1984). “Groups in context: A model of task group effectiveness.” Admin. Sci. Q., 29(4), 499–517.
Greer, L. L., and Jehn, K. A. (2007). “The pivotal role of negative affect in understanding the effects of process conflict on group performance.” Res. Manage. Groups Teams, 10, 21–43.
Guetzkow, H., and Gyr, J. (1954). “An analysis of conflict in decision-making groups.” Hum. Relat., 7(3), 367–381.
Harmon, K. M. J. (2003). “Conflicts between owner and contractors: Proposed intervention process.” J. Manage. Eng., 121–125.
Hofstede, G. (1993). “Cultural constraints in management theories.” Acad. Manage. Exec., 7(1), 81–94.
Hofstede, G., and Bond, M. H. (1988). “The Confucius connection: From cultural roots to economic growth.” Organ. Dynam., 16(4), 5–21.
Jaffar, N., Tharim, A. H., and Shuib, M. N. (2011). “Factors of conflict in construction industry: A literature review.” Procedia Eng., 20, 193–202.
Janis, I. L. (1982). Victims of groupthink, 2nd Ed., Houghton-Mifflin, Boston.
Jehn, K., and Mannix, E. (2001). “The dynamic nature of conflict: A longitudinal study of intragroup conflict and group performance.” Acad. Manage. J., 44(2), 238–251.
Jehn, K., Northcraft, G., and Neale, M. (1999). “Why differences make a difference: A field study of diversity, conflict, and performance in workgroups.” Admin. Sci. Q., 44(4), 741–763.
Jehn, K. A., and Bendersky, C. (2003). “Intragroup conflict in organizations: A contingency perspective on the conflict-outcome relationship.” Res. Organ. Behav., 25, 187–242.
Jehn, K. A. A. (1995). “Multimethod examination of the benefits and determinants of intragroup conflict.” Admin. Sci. Q., 40(2), 256–282.
Jehn, K. A. A. (1997). “Qualitative analysis of conflict types and dimensions of organizational groups.” Admin. Sci. Q., 42(3), 530–557.
Kassab, M., Hipel, K., and Hegazy, T. (2006). “Conflict resolution in construction disputes using the graph model.” J. Constr. Eng. Manage., 1043–1052.
Kirkbride, P. S., Tang, S. F. Y., and Westwood, R. I. (1991). “Chinese conflict preferences and negotiating behavior: Cultural and psychological influences.” Organ. Stud., 12(3), 365–386.
Kumaraswamy, M. M. (1997). “Conflicts, claims and disputes in construction.” Eng. Construct. Architect. Manage., 4(2), 95–111.
Leung, M., Liu, A. M. M., and Ng, S. T. (2005). “Is there a relationship between construction conflicts and participants’ satisfaction?” Eng. Construct. Architect. Manage., 12(2), 149–167.
Leung, M., Ng, S. T., and Cheung, S. O. (2002). “Improving satisfaction through conflict stimulation and resolution in value management in construction projects.” J. Manage. Eng., 68–75.
Maloney, W. F. (1990). “Framework for analysis of performance.” J. Constr. Eng. Manage., 399–415.
Matsuo, M. (2006). “Customer orientation, conflict, and innovativeness in Japanese sales departments.” J. Bus. Res., 59(2), 242–250.
Merton, R. K. (1936). “The unanticipated consequences of purposive social action.” Am. Socio. Rev., 1(6), 894–904.
Merton, R. K. (1948). “The self-fulfilling prophecy.” Antioch Rev., 8(2), 193–210.
Mirzabaigian, H., and Shiells, P. (1994). “Conflict avoidance in construction industry consultant and contractor view.” Construction conflict management and resolution, P. Fenn, ed., Vol. TG15, Univ. of Manchester Institute of Science and Technology, Manchester, U.K., 249–258.
Mishra, A. K. (1996). “Organizational responses to crisis: the centrality of trust.” Trust in organizations: Frontiers of theory and research, R. Kramer and T. Tyler, eds., Sage, Thousand Oaks, CA, 261–287.
Nemeth, C. J., and Staw, B. M. (1989). “The tradeoffs of social control and innovation in groups and organizations.” Advances in experimental social psychology, L. Berkowitz, ed., Vol. 22, Academic, New York, 175–210.
Ng, H., Peña-Mora, F., and Tamaki, T. (2007). “Dynamic conflict management in large-scale design and construction projects.” J. Manage. Eng., 52–66.
Nunnally, J. C. (1978). Psychometric theory, McGraw-Hill, New York.
Peldschus, F. (2008). “Experience of the game theory application in construction management.” Technol. Econ. Dev. Econ., 14(4), 531–545.
Peter, J. P. (1979). “Reliability: A review of psychometric basics and recent marketing practices.” J. Market. Res., 16(1), 6–17.
Pinkley, R. L. (1990). “Dimensions of conflict frame: Disputant interpretations of conflict.” J. Appl. Psych., 75(2), 117–126.
Rahim, M. A. (1983). “Measurement of organizational conflict.” J. Gen. Psychol., 109(2), 189–199.
Rahim, M. A. (2002). “Toward a theory of managing organizational conflict.” Int. J. Conflict Manage., 13(3), 206–235.
Robbins, S. P., and Judge, T. A. (2009). Organizational behavior, 13th Ed., Pearson Education, Prentice Hall, NJ.
Roloff, M. E. (1987). “Communication and conflict.” Handbook of communication science, C. R. Berger and S. H. Chaffee, eds., Sage, Newburry Park, CA, 484–534.
Sharma, S. (1996). Applied multivariate techniques, Wiley, New York, 116–123.
Simons, T. L., and Peterson, R. S. (2000). “Task conflict and relationship conflict in top management teams: The pivotal role of intragroup trust.” J. Appl. Psych., 85(1), 102–111.
Thomas, K. W. (1976). “Conflict and conflict management.” Handbook of industrial and organizational psychology, M. D. Dunnette and L. M. Hough, eds., Consulting Psychologists Press, Palo Alto, 889–935.
Thomas, S. R., Macken, C. L., Chung, T. H., and Kim, I. (2002). “Measuring the impacts of the delivery system on project performance—Design-build and design-bid-build.” CII Rep., National Institute of Standards and Technology, Austin, TX.
Thompson, J. D. (1967). Organizations in action, McGraw-Hill, Chicago.
Turner, J. C. (1987). Rediscovering the social group: A self-categorization theory, Blackwell, Oxford, U.K.
Van de Ven, A. H., and Ferry, D. (1980). Measuring and assessing organizations, Wiley, New York.
Vodosek, M. (2007). “Intragroup conflict as a mediator between cultural diversity and work group outcomes.” Int. J. Conflict Manage., 18(4), 345–375.
Wall, J. A., Jr., and Callister, R. R. (1995). “Conflict and its management.” J. Manage., 21(3), 515–558.
Wright, R. (2000). Nonzero: The logic of human destiny, Pantheon Books, New York.
Yiu, K. T. W., and Cheung, S. O. (2006). “A catastrophe model of construction conflict behavior.” Build. Environ., 41(4), 438–447.
Zand, D. E. (1972). “Trust and managerial problem solving.” Admin. Sci. Q., 17, 229–239.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 140Issue 6June 2014

History

Received: Feb 28, 2013
Accepted: Jan 30, 2014
Published online: Mar 19, 2014
Published in print: Jun 1, 2014
Discussion open until: Aug 19, 2014

Permissions

Request permissions for this article.

Authors

Affiliations

Yong Qiang Chen [email protected]
Professor, Dept. of Construction Management, Tianjin Univ., Tianjin 300072, P.R. China. E-mail: [email protected]
Yang Bing Zhang, M.ASCE [email protected]
Research Student, Dept. of Construction Management, Tianjin Univ., Tianjin 300072, P.R. China. E-mail: [email protected]
Su Juan Zhang [email protected]
Research Student, Dept. of Construction Management, Tianjin Univ., Tianjin 300072, P.R. China (corresponding author). E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share