Determination of Most Economical Scrapers Fleet
Publication: Journal of Construction Engineering and Management
Volume 131, Issue 10
Abstract
Scrapers are valuable construction equipment for large earthmoving operations. Their production rates vary widely as they depend on the equipment performance, operation’s travel time, and haul-road conditions. Determining the most economical selection of the size, model, and number of scrapers is a rather tedious process that involves repetitive calculations. A spreadsheet application was created in order to facilitate such calculations and select the most economical scraper from the list of available equipment for the job under consideration. The application is made of seven spreadsheets containing a scrapers’ database, performance charts, soil properties, and other supporting worksheets. The application provides a user interface to solicit all data entries specific to a project. Once the user enters the required data the system compares the production rate, time required for the job, determines the estimated unit cost for each scraper in the database, and recommends the most economical selection.
Get full access to this article
View all available purchase options and get full access to this article.
References
Amirkhanian, S., and Baker, N. (1992). “Expert system for equipment selection for earth-moving operation.” J. Constr. Eng. Manage., 118(2), 318–331.
Caterpillar Handbook, 32nd Ed. (2001). Caterpillar Inc., Peoria, Il.
Christian, J., and Xie, T. X. (1996). “Improving earthmoving estimating by more realistic knowledge.” Can. J. Civ. Eng., 23, 250–259.
Hanna, A. (1994). “SELECTCRANE: An expert system for optimum crane selection.” Proc., 1st Computing in Civil Engineering Conf., in conjunction with A/E/C Systems, ASCE, Reston, Va., 1, 958–963.
Kuprenas, J., and Henkhaus, T. (2000). “SSPE—A tool for scraper selection and production.” Proc., 8th Int. Computing in Civil and Building Engineering Conf., ASCE, Reston, Va., 2, 980–987.
O’Brien, J. J., and Zilly, R. G. (1971). Constructor’s management handbook, 1st Ed., McGraw-Hill, New York.
Paulson, B. C., Jr. (1995). Computer application in construction, 1st Ed., McGraw-Hill, New York.
Peurifoy, R. L., and Schexnayder, C. J. (2003). Construction planning, equipment, and methods, 6th Ed., McGraw-Hill, New York.
Touran, A. (1990). “Expert system for compactor selection.” J. Transp. Eng., 116(3), 338–348.
Information & Authors
Information
Published In
Copyright
© 2005 ASCE.
History
Received: Aug 30, 2004
Accepted: Mar 22, 2005
Published online: Oct 1, 2005
Published in print: Oct 2005
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.