Optimal Schedule Planning for Multiple, Repetitive Construction Process

Publication: Journal of Construction Engineering and Management
Volume 127, Issue 5

Abstract

This study attempts to develop a construction scheduling model using a conceptual approach to improve the efficiency of construction resources for a multiple, repetitive construction process (MRCP). It is important for a project manager to arrange the number of horizontal repetitive work areas by each crew group to reduce the work interruption period in MRCP. This study suggests some equations for estimating the optimal number of horizontal repetitive work areas for a crew group and pursued a conceptual model for MRCP, which can reduce the loss in manpower and use of construction equipment that is caused by work interruption periods. A computer program developed for the analysis of MRCP shows an appropriate performance through the application to a case study based on the proposed procedure model in this study. Supposing that there is time to spare in the project completion date, the result of the study shows that cost loss could be greatly reduced by the proposed methodology.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
AbouRizk, S. M., and Halpin, D. W. (1990). “Probabilistic simulation studies for repetitive construction processes.”J. Constr. Engrg. and Mgmt., ASCE, 116(4), 575–594.
2.
Carr, R. I., and Meyer, W. L. (1974). “Planning construction of repetitive building units.”J. Constr. Div., ASCE, 100(3), 403–412.
3.
Harris, R. B., and Ioannou, P. G. (1998). “Scheduling projects with repeating activities.”J. Constr. Engrg. and Mgmt., ASCE, 124(4), 269–278.
4.
Kavanagh, D. P. (1985). “SIREN: A repetitive construction simulation model.”J. Constr. Engrg. and Mgmt., ASCE, 111(3), 308–323.
5.
Moselhi, O., and El-Rayes, K. (1993). “Scheduling of repetitive projects with cost optimization.”J. Constr. Engrg. and Mgmt., ASCE, 119(4), 681–697.
6.
O'Brien, J. J. (1975). “VPM scheduling for high-rise buildings.”J. Constr. Div., ASCE, 101(4), 895–905.
7.
O'Brien, J. J., Kreitzberg, F. C., and Mikes, W. F. (1985). “Network scheduling variations for repetitive work.”J. Constr. Engrg. and Mgmt., ASCE, 111(2), 105–116.
8.
Reda, R. M. (1990). “RPM: Repetitive project modeling.”J. Constr. Engrg. and Mgmt., ASCE, 116(2), 316–330.
9.
Thabet, W. Y., and Beliveau, Y. J. (1994a). “HVLS: Horizontal and vertical logic scheduling for multistory projects.”J. Constr. Engrg. and Mgmt., ASCE, 120(4), 875–892.
10.
Thabet, W. Y., and Beliveau, Y. J. (1994b). “Modeling work space to schedule repetitive floors in multistory buildings.”J. Constr. Engrg. and Mgmt., ASCE, 120(1), 96–116.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 127Issue 5October 2001
Pages: 382 - 390

History

Received: Feb 29, 2000
Published online: Oct 1, 2001
Published in print: Oct 2001

Permissions

Request permissions for this article.

Authors

Affiliations

Associate Member, ASCE
Assoc. Prof., Dept. of Civ. Engrg., Res. Inst. of Industrial Technol., Gyeongsang Nat. Univ., Gyeongnam, Jinju Si, Korea, 660-701. E-mail: [email protected]
Pres., Korea Structural Engineering Inc., 5187-1 Taepyungdong, Sujunggu, Sungnamsi, Gyeonggido, Korea.
Formerly, Prof., Dept. of Civ. Engrg., Chungang, Univ., Seoul, Korea.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share