Optimal Schedule Planning for Multiple, Repetitive Construction Process
Publication: Journal of Construction Engineering and Management
Volume 127, Issue 5
Abstract
This study attempts to develop a construction scheduling model using a conceptual approach to improve the efficiency of construction resources for a multiple, repetitive construction process (MRCP). It is important for a project manager to arrange the number of horizontal repetitive work areas by each crew group to reduce the work interruption period in MRCP. This study suggests some equations for estimating the optimal number of horizontal repetitive work areas for a crew group and pursued a conceptual model for MRCP, which can reduce the loss in manpower and use of construction equipment that is caused by work interruption periods. A computer program developed for the analysis of MRCP shows an appropriate performance through the application to a case study based on the proposed procedure model in this study. Supposing that there is time to spare in the project completion date, the result of the study shows that cost loss could be greatly reduced by the proposed methodology.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
AbouRizk, S. M., and Halpin, D. W. (1990). “Probabilistic simulation studies for repetitive construction processes.”J. Constr. Engrg. and Mgmt., ASCE, 116(4), 575–594.
2.
Carr, R. I., and Meyer, W. L. (1974). “Planning construction of repetitive building units.”J. Constr. Div., ASCE, 100(3), 403–412.
3.
Harris, R. B., and Ioannou, P. G. (1998). “Scheduling projects with repeating activities.”J. Constr. Engrg. and Mgmt., ASCE, 124(4), 269–278.
4.
Kavanagh, D. P. (1985). “SIREN: A repetitive construction simulation model.”J. Constr. Engrg. and Mgmt., ASCE, 111(3), 308–323.
5.
Moselhi, O., and El-Rayes, K. (1993). “Scheduling of repetitive projects with cost optimization.”J. Constr. Engrg. and Mgmt., ASCE, 119(4), 681–697.
6.
O'Brien, J. J. (1975). “VPM scheduling for high-rise buildings.”J. Constr. Div., ASCE, 101(4), 895–905.
7.
O'Brien, J. J., Kreitzberg, F. C., and Mikes, W. F. (1985). “Network scheduling variations for repetitive work.”J. Constr. Engrg. and Mgmt., ASCE, 111(2), 105–116.
8.
Reda, R. M. (1990). “RPM: Repetitive project modeling.”J. Constr. Engrg. and Mgmt., ASCE, 116(2), 316–330.
9.
Thabet, W. Y., and Beliveau, Y. J. (1994a). “HVLS: Horizontal and vertical logic scheduling for multistory projects.”J. Constr. Engrg. and Mgmt., ASCE, 120(4), 875–892.
10.
Thabet, W. Y., and Beliveau, Y. J. (1994b). “Modeling work space to schedule repetitive floors in multistory buildings.”J. Constr. Engrg. and Mgmt., ASCE, 120(1), 96–116.
Information & Authors
Information
Published In
History
Received: Feb 29, 2000
Published online: Oct 1, 2001
Published in print: Oct 2001
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.